STATISTICAL ANALYSIS OF OPERATIONAL RELIABILITY OF HYDRAULIC STRUCTURES1
Yasin Ismail Rustamov
Institute of the Control Systems of Azerbaijan National Academy of Sciences, Baku, Azerbaijan
Sabir Tehrankhan Hasanov
Azerbaijan Scientific and Produktion Union "Hydraulic and Melioration", Baku, Azerbaijan
Abstract. In the paper, according to actual operation of pump units it was determined that operattion period of to their failure corresponds to Weibull distribution. In periods between failures, conditionally the pump units were considered as unrepairable. Therefore, not the availability factor and operation period between failures that are the complex reliability indices characterizing reliability of a pump station but probability of continuous operation and mean value of continuous operation time were calculated. The role of continuously loaded resource in reliability increase of the system was determined. The report was executed by the mathematical software program package "Derive - 6". Key words: pump unit, continuity, reliability, quality (failure), criterion, probability, random events, structural design.
УДК 504:626 ББК 26.221
СТАТИСТИЧЕСКИЙ АНАЛИЗ ЭКСПЛУАТАЦИОННОЙ НАДЕЖНОСТИ ГИДРОТЕХНИЧЕСКИХ СООРУЖЕНИЙ1
Ясин Исмаил Рустамов
Институт системы управления Национальной академии наук Азербайджана, г. Баку, Азербайджан
Сабир Техранхан Гасанов
Научно-производственное объединение гидротехники и мелиорации Азербайджана, г. Баку, Азербайджан
Аннотация. В статье, согласно фактическим периодам работы насосных агрегатов, было определено, что времени их работы до отказа соответствует распределению Weibull. В периоды между отказами насосные агрегаты условно рассмотрены как невосстанавливаемые. Поэтому вычислено вероятность безотказный работы и средняя наработка до отказа, а не коэффициент готовности и периоды работы между отказами, которые являются сложными комплексными показателями надежности, характеризующими надежность насосных станций. Была определена роль постоянно нагруженного резерва в увеличении надежности системы. Расчет был выполнен пакетом математической программы <Юег^е-6».
Ключевые слова: насосный агрегат, безотказность, надежность, качество, отказ (неудача), критерий, вероятность, случайные события, структурная схема.
о
(N
нг
IÂ
^ Introduction
In Azerbaijan, over different purpose 1000 5 pump stations are being operated. They are mainly $ used for water transport from water reservoirs to certain distances, evacuate collector-drainage © waters from sown areas. Total amount of water
evacuated from irragation and water services by the existing pump stations is 5 billion cubic maters per year including, 2 billion cubic meter collector-drainage waters [1]. Provision of continuity of water evacuation and the required pressure in water management system is mainly determined by
reliability of pump stations. Lower reliability pumping stations increases operating costs, reduces service life and economic efficiency. At the same time, failure of low efficiency pump stations leads to great material and financial losses [2, 3].
Failure of normal operation of pump station during operation time is connected with random events. For evaluating no-failure operation of a pump station its probability character reliability indices should be known. A number of precious and complex characteristics are among these indices. Precious reliability of pump stations contain their no-failure operation probability P(t) and mean operation time T0 to failure. The availability factor Kh and operation periods T between failures belong to complex reliability indices that characterize no-failure operation and repairability of a pump station [4, 5]. According to normative requirements when evaluating the reliability of restored equipments it is required to calculate Kh and T0. In interrepair period the pumps may be conditionally considered as unrepairable equipments. Therefore, in these equipments the avaibility factor coincides with continuous operation probability or has the same sense [6].
Problem statement
The object of this research is "Shimal-2" pump station in Salyan region of Azerbaijan. The pump station consists of three pumping units (two
16 NDN and one 24 NDN) and is used for meliorative purposes.
Operation hours of the pump station on the period of one year is given (table 1).
As a zero hypothesis we assume that variation series (t; % t2 % .... % tr) § = o of operation hours of pumping units is subjected to two-parameter Weibull distribution law. If the zeroth hypothesis is rejected, then other distributions, including three-parameter Weilbull distribution may be considered. Mann and other authors have used only goodness of first criterion prepared for Weibull distribution [7, 8, 9].
Problem solution:
Table 2 was drawn up for finding the values of observation criterion for the first pump unit.
By goodness of fit criterion, S m ~ 0 ,29.
Using special tables, according to accuracy level r = 10 and a = 0,05 it was determined that the critical value of the criterion is S b = 0,69. As S m % S b, in this case, it was determined that the operation hours between failures corresponds to two-parameter Weibull distribution, and the distribution function
- <-)b
F <x ; a ,b ) = 1 - e a x > 0 (1)
here a is the scale or resource parameter, b is the shape parameter or angular coefficient.
Table 1
Actual operation hours of "Shimal -2" pump station
№ of PU On months Type of the pump
I II III IV V VI VII VIII IX X XI
1 248 252 351 450 480 440 445 362 390 415 - 16NDN
2 350 357 463 514 512 521 585 396 275 312 425 16NDN
3 196 340 270 310 335 364 200 273 445 300 285 24NDN
Table 2
Operation hours of the first pumping unit
i ti xi = lnti Mi xi +1 xi (Xi +i -xt) /Mi
1 248 5,5134 1,054 0,016 0,0152
2 252 5,5294 0,559 0,3314 0,5928
3 351 5,8608 0,399 0,0308 0,0772
4 362 5,8916 0,325 0,0745 0,2292
5 390 5,9661 0,286 0,0622 0,2175
6 415 6,0283 0,269 0,0585 0,2175
7 440 6,0868 0,271 0,0113 0,0417
8 445 6,0981 0,301 0,0111 0,0369
9 450 6,1092 0,405 0,0646 0,1595
10 480 6,1738
If we make the substitution x = Int, then distribution function of the random variable x is
F (x ) = 1 — exp[ — exp(-)],
v
(— œ % x % œ)
1
(2)
here u = Ina and v = . When the reliability (P) of
the equipment is known, for finding the random variable x, we can write expression (2) as follows:
x = u + v [ln(ln 1)]
(3)
Linear weighted sets found for r = 10 from special tables are given in table 3.
By making the substitution xt = lntt the coefficients in expression (3) are calculated as
= S <
i=1
r
v=E<
(4)
(5)
Here ai and ci are linear weighted multipliers. Initial parameters and reliability of the Weibull distribution is calculated as
b = 1, v
P(t) = exp( — -)b a
(6)
(7)
(8)
and is called the best unchangeoble linear assessment. This assessment gives the least error with regard to other assessments. From the expressions (5) and (6), as u = 5,6092, v = 0,1571in expression (7) and (8) hours a = 273, b = 6,36. Then from dependence (9) in the general form we get
Pi(t) = exp( — -)b = exp( — ^-f a 273
(9)
Expression (10) represents no-failure operation probability of the first pumping unit. Table 4 was drawn up for determining regularity of distribution of non-failure operation time of the second pumping unit.
— u
a = e
i=1
Table 3
ti x. = lnt t ai ci
248 5,5134 0,0273 -0,07273
252 5,5294 0,0400 -0,07797
351 5,8608 0,0525 -0,07724
362 5,8916 0,0654 -0,07188
390 5,9661 0,0793 -0,06165
415 6,0283 0,0946 -0,04542
440 6,0868 0,0946 -0,02070
445 6,0981 0,1124 0,01793
450 6,1092 0,1342 0,08507
480 6,1738 0,2300 0,32460
Table 4
Operation hourse of the second pumping unit
i ti xi = lnt i Mi xi +1 xi (xi +1 — xi) / Mt
1 275 5,6168 1,0484 0,1262 0,1204
2 312 5,7430 0,5528 0,1141 0,2064
3 350 5,8579 0,3914 0,0198 0,0506
4 357 5,8777 0,3147 0,1037 0,3295
5 396 5,9814 0,2732 0,0707 0,2588
6 425 6,0521 0,2514 0,0856 0,3405
7 463 6,1377 0,2439 0,1006 0,4125
8 512 6,2383 0,2515 0,0039 0,0155
9 514 6,2422 0,2839 0,0153 0,0539
10 521 6,2575 0,3891 0,1141 0,2859
11 585 6,3716
By the expression of the goodness of fit criterion, sm = 0,53. By the number of failures r = 11 and accuracy level a = 0,05 it was determined from special tables that Sb = 0,74. As Sm % Sb, distribution of no-failure operation time of the second pumping unit mets the Weibull distribution.
Table 5 was drawn up to determine no-failure operation probability of the Weibull distribution parameters and the second pumping unit.
As in dependence (5) and (6) we get u = 6,5196, v = 2,1247, from expressions (7) and (8) a = 678 hours, b = 0,47. In this case for the second pumping unit formula (9) must be calculated as follows
P2(t) = exp(--)0
678
(10)
Table 6 was drawn up to determine regularity of distribution of no-failure operation time of the third pumping unit.
If we take into account the values in Table 6 in the expression for the goodness of fit criterion, then sm « 0,54. By the number of failures (r = 11) and from the accuracy level (a = 0,05) from special tables Sb = 0,74. As Sm % Sb, distribution of no-failure operation time of the third pumping unit meets the Weibull distribution.
For finding no-failure operatrion probability of the third pumping unit, at first the parameters should be determined. To this end, table 7 was drawn up.
Table 5
ti xi = lnt i ai ci
275 5,037 0,016 -0,070
312 5,347 0,034 -0,074
350 5,375 0,043 -0,074
357 5,481 0,054 -0,071
396 5,846 0,066 -0,064
425 6,040 0,078 -0,054
463 6,047 0,093 -0,039
512 6,174 0,111 -0,019
514 6,242 0,133 0,010
521 6,256 0,347 0,052
585 6,372 0,098 0,402
Table 6
Operation hours of the third pumping unit
i ti x. = lnt i Mt Xi +1 Xi (xi+i -xi)/Mi
1 196 5,2781 1,0484 0,0202 0,0193
2 200 5,2983 0,5527 0,3001 0,5430
3 270 5,5984 0,3914 0,087 0,2223
4 273 5,6095 0,3147 0,043 0,1366
5 285 5,6525 0,2732 0,0513 0,1878
6 300 5,7038 0,2514 0,0328 0,1305
7 310 5,7366 0,2439 0,0775 0,3178
8 335 5,8141 0,2516 0,0149 0,0592
9 340 5,8290 0,2839 0,0682 0,2402
10 364 5,8972 0,3807 0,2009 0,5277
11 445 6,0981
Table 7
ti xi = lnt i ai ci
196 5,2781 0,0249 -0,0654
200 5,2983 0,0355 -0,0703
270 5,5984 0,0457 -0,0705
273 5,6095 0,0562 -0,0671
285 5,6525 0,0673 -0,0602
300 5,7038 0,0792 -0,0493
310 5,7366 0,0926 -0,0332
335 5,8141 0,1080 -0,0094
340 5,8290 0,1271 0,0269
364 5,8972 0,1532 0,0891
445 6,0981 0,2104 0,3094
In the similar way, as from dependences (7) and (8) u = 5,8092, v = 0,2066 from expressions (9) and (10) we get the values a = 334 hours, b = 4,8403. In this case, for the third pumping unit expression (3) should be calculated as follows
P(t) = exp(--)4,84
334
(11)
Reliability and failure probability of the pump station are calculated as follows [4]
pn / St , q „ 1 - Pn / ^ (t).
(12)
In the case of a reserved pump unit it is calculated as
Pn / st = z c'n (1 - P0y • PN-1,
i=0
q„N = cp-n (1 - Po)n ■
(13)
In expressions (11), (12), (13) and (14), giving different values to t, we can calculate reliability of pump units, in general of a pump station by formulas (15) and (16).
As is seen from the operating mode of a pump station, the system has a structural design with constant resource Fig. 1
X 2
Fig. 1. Reliability block-design of the pump station
In such designs, the side-by-side connected element provides distribution or lowering of load.
The system's reliability was calculated by the following expression:
Ps (t) = [1 - (1 - e
_(t/273)-
) •
• (1 - e
-(t/678)0
)] • e
-(t/334)4,
(14)
If we assess the functions on the interval 0 - 300 by 25 hour steps, we get the following table 8.
By integrating the expression (1 4) of probability of continuous operation of the pump station on the interval [0, <x>], we get that mean value of continuous operation time of the system [10, 11]
T = J [1 -(1-
_(t /273)6,
) • (1 - e
-(t/678)0.
)] •
(15)
• e-'/334)4,84 dt = 273
is about 273 hours.
The graph of probability of continuous operation of pumping units and the pump station is depicted in fig. 2. The number of curves corresponds to numbers of pumping units. N/st is the graph of continuous operation probability of the system.
As is seen from the curves, the continuous operation probability of the system, in the case of distribution of operation time to failure by the Weibull law gets large values in small domains, gets small values at large values of t.
Failure probability of the system, density of distribution of continuous operation time to failure, and failure intensity of continuous operation time to failure are calculated as follows:
i=1
X
Table 8
tt hours Pi(') P3(t) P3(t) Pn/Jt)
0 1 1 1 1
25 0,999 0,81 0,999 0,9999
50 0,999 0,75 0,999 0,9998
75 0,999 0,70 0,999 0,9991
100 0,998 0,67 0,997 0,9965
125 0,993 0,64 0,991 0,9889
150 0,978 0,61 0,979 0,9710
175 0,94 0,59 0,957 0,9345
200 0,87 0,57 0,920 0,8686
225 0,75 0,55 0,86 0,7645
250 0,57 0,54 0,78 0,6235
275 0,35 0,52 0,68 0,4658
300 0,16 0,51 0,55 0,3231
_(t/273)6,36 -(t/678)°-47s л -(t/334)4'8\(16)
Qs = (1 - в ) • (1 - в ) ) • (1 - в ) )(16)
fs (t) = — ((1 - в"(t/273)6 36 ) • (1 - в"(t,678)04' ) • (1 - в"(t/334)4 84 ))(17) dt
К (t)--
—((1 - в-(t/273 ) 6 36) • (1 - в-(t/678 ) 047 ) • (1 - в-(t/334)4 34 )) dt
[1-(1- в-(t/273) ) • (1- в-(t/678)0 )] • в- 1
(18)
The appropriate curves were drawn using expressions (17), (18).
Accordance of the pump station to normative requirements, became possible at the expense of the created resource unit. After about ten continuous operations, as engineering service and some routine repairs of pump units was
possible, the pump station's effective operation was provided.
Conclusion
"Shimal-2" pump station was designed without taking into account reliability conditions. In such cases, as the engineering equipment does not satisfy the reliability requirements, there occur failure cases, exploitation costs increases, continuous operation periods decrease and as a result, the equipment fails before ending the exploitation period or operates without some effect. In the paper, though the field of service of the pump station used for meliorative purposes and amount of water required for injection are
Fig. 2. Continuous operation probabilities of pumping units and pump stations
Fig. 3. Density of distribution of time to failure
Fig. 4. Intensity of distribution of time to failure
not touched, it is known that according to operation hours, every unit works not by its total power but with itervals i.e. in the case when two pumps work with total power and another unit is in reserve, the system fulfiles its function i.e. the pump station has a permanently installed resource unit. According to theoreticcal results and graphical descriprion, "Shimal-2", though the pump station is exploited for a long period, it was determined that this station meets the reliability requiremants.
In addition to other reasons, this was succeseded by permanently installed resource. In the paper, all three variants for determining the system's reliability were used. They are structural design, operation hours and laow of distribution of continuous operation to failure.
In spite of such random cases, any engineering system must be designed, built and expoited with regard to reliability indices.
ПРИМЕЧАНИЕ
1 This work was supported by the Science Development Foundation under the President of the Republic of Azerbaijan-Grant №№ EЭF-KETPL-2-2015-l(25)-56/13/l.
REFERENCES
1. Ahmedzade A.S., Hashimov A.S., Ensyclopedia on melioration. Baku, Radius, 2016, 632 p.
2. Rustamov Y.I. Reliability conditions and reasons of failures in pump stations, Azerbaijan Agrar Elmi, vol. 3, 2013, pp. 111-114.
3. Rustamov Y.I. Assessment of reliability of land-reclamation pump stations Investia Agrarnoy nauki, vol. 8, vol. 2, 2010, pp. 69-72.
4. Polovko A.M., Gurov S. V. Bases of the theory of reliability. St. Petersburg, Petersburg, 2008, 702 p.
5. Gnedenco B.V, Belyaev Y.K., Solovyov A.D. Mathematical methods in the theory of reliability. Moscow, LIBROKOM, 2013, 584 p.
6. State Standards 27. 003-90. Structure and general rules on reliability requirements. Moscow, Gos. Standart SSSR, 1990, 20 p.
7. Kapur K., Lamberson L. Reliability and design of systems. Moscow, Mir, 1980, 604 p.
8. Mann R., Fertig K., Scheuer E. Tolerance Bounds and a New Goodness of Fit for Two-Parameter Weibull or Extreme-Value Distribution, Aerospace Research Laboratories, 1971, 231 p.
9. Hajiyev A.H., Rustamov Y.I. On a distribution function and reliability parameters of busy period for pump stations during continuos operation, World Journal of Modelling and Simulation. England, UK, Vol. X (XXXX), iss. X, pp. 3-10.
10. Venttsel E.S., Ovcharov L.A. Tasks and exercises on probability theory. Moscow KNORUS, 2014, 496 p.
11. Kremer N.Sh. Theory of Probability and Mathematical Statistics. Moscow, UNITI DANA, 2012, 512 p.
Information about the Authors
Yasin Ismail Rustamov, Doctor of Technical Sciences, Head of Laboratory, Institute of the Control Systems of Azerbaijan National Academy of Sciences, B. Vagabzade St., 9, AZ 1141 Baku, Azerbaijan, Terlan56@mail. ru.
Sabir Tehrankhan Hasanov, Doctor of Technical Sciences, Head of Laboratory, Azerbaijan Scientific and Produktion Union "Hydraulic and Melioration", I. Dadashova St., 70a, AZ 1125 Baku, Azerbaijan, [email protected].