Научная статья на тему 'Sensitivity Analysis of Three Different Series – Parallel Dynamo Configurations'

Sensitivity Analysis of Three Different Series – Parallel Dynamo Configurations Текст научной статьи по специальности «Медицинские технологии»

CC BY
91
45
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
Sensitivity / Reliability / Dynamo / Availability / Configurations / Series Parallel

Аннотация научной статьи по медицинским технологиям, автор научной работы — Muhammad Salihu Isa, U A Ali, Bashir Yusuf, Ibrahim Yusuf, Yusuf Jamilu Umar

This paper deals with the sensitivity analysis of three configurations arranged in series-parallel. Configuration I consist of six units in which four are on operation while two are on standby. Configuration II consist of seven units with three of the units are on standby while the remaining four are on operation. Configuration III comprises of two subsystems C and D with three unit in each subsystem with a unit on standby. Units in each configuration provide 25MW. Both the failure and repair time are assumed exponentially distributed. System of first order linear differential difference equations is obtained using the transition diagram. Explicit expressions of the system availability, Mean Time To Failure (MTTF), busy period due to partial failure, busy period due to complete failure and profit were derived. Furthermore results of sensitivity of the system availability, MTTF and profit were determined. The obtained results were analyzed and compared, configuration I was found to be the optimal configuration.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Sensitivity Analysis of Three Different Series – Parallel Dynamo Configurations»

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , CRI&A' N° ^^

Volume 15, December 2020

DYNAMO CONFIGURATIONS

Sensitivity Analysis of Three Different Series - Parallel

Dynamo Configurations

Muhammad Salihu Isa •

Department of Mathematics, Federal University Dutse, Nigeria [email protected]

U A Ali •

Department of Mathematics, Federal University Dutse, Nigeria [email protected]

Bashir Yusuf •

Department of Mathematics, Federal University Dutse, Nigeria [email protected]

Ibrahim Yusuf

Department of Mathematical Sciences, Bayero University, Kano, Nigeria [email protected]

Yusuf Jamilu Umar

University of Electronic Science and Technology, Chengdu, China [email protected]

Abstract

This paper deals with the sensitivity analysis of three configurations arranged in series-parallel. Configuration I consist of six units in which four are on operation while two are on standby. Configuration II consist of seven units with three of the units are on standby while the remaining four are on operation. Configuration III comprises of two subsystems C and D with three unit in each subsystem with a unit on standby. Units in each configuration provide 25MW. Both the failure and repair time are assumed exponentially distributed. System of first order linear differential difference equations is obtained using the transition diagram. Explicit expressions of the system availability, Mean Time To Failure (MTTF), busy period due to partial failure, busy period due to complete failure and profit were derived. Furthermore results of sensitivity of the system availability, MTTF and profit were determined. The obtained results were analyzed and compared, configuration I was found to be the optimal configuration.

Keywords: Sensitivity, Reliability, Dynamo, Availability, Configurations, Series - Parallel.

I. Introduction

Every manufacturer expects the performance of his/her engines with full efficiency within the designed limits. However, in real life users have the tendency to operate the system beyond even their control limits and such situations are termed as abnormal condition. In the system design, redundancy is found in almost all types of systems that plays an important role for improvement of reliability and availability of the system. Sometimes, it is difficult to keep a high cost identical unit in standby situation; therefore, a duplicate unit may be kept as spare for use in emergency and to provide services to the customers for a considerable period. Each unit can perform same kind of functions, but their degree of reliability and desirability may differ from unit to unit, Kumar et al. (2020). High system reliability and availability of electrical system plays a vital role towards industrial growth as the profit is directly dependent on production volume which depends upon system performance. Due to their prevalence in domestic, manufacturing, and industrial systems, many researchers have studied reliability and availability problem of different electrical systems.

A great number of models have been introduced to describe the behaviour and performance of electrical system that is subject to failure. For this reason, many researchers have studied reliability problem of different electrical systems.Redundancy technique is widely used to improve system reliability. However, in the real world situation, many systems are load-sharing, such as electric generators sharing an electrical load in a power plant, cables in a suspension bridge, and valves or pumps in a hydraulic system, Chunbo et al. (2015). To cite few, Chauhan and Malik (2017) focused on the evaluation of reliability and MTSF of a parallel system with Weibull failure laws. Abdul Kareem and Singh (2019) worked on cost assessment of complex repairable system consisting two subsystems in series configuration using Gumbel Hougaard family copula. Rajesh et al. (2018) have studied the reliability and availability for a three unit gas turbine power generating system with seasonal effect and FCFS repair pattern. Dalip et al. (2014) have also studied reliability and economic analysis of a power generating system comprising one gas and one gas steam turbine with random inspection. However, situations may be there, where the two units may be dissimilar but the nature of the work done by them is the same. Such a situation was discussed by Singh and Taneja (2013) and (2014) for a gas turbine power plant. However, they did not consider the parameter 'Temperature' which also affects the working/function and efficiency of a gas turbine system. One such situation was discussed by Rajesh et al. (2018) where effects of temperature on production of a system comprising one gas turbine and one steam turbine have been taken into account. Such a system necessarily goes to down mode on failure of gas turbine irrespective of operability of steam turbine, as steam turbine cannot work without working of gas turbine. However, this problem can be overcome to some extent if number of gas turbine is increased, i.e., redundancy is introduced._Yusuf (2016) presented an article on reliability evaluation of parallel system with two types of preventive maintenance. Ram M. and Kumar (2015) discussed on performability/performance analysis of a system under 1-out-of -2: G scheme with perfect reworking, Wang et al. (2003) have studied cost benefit analysis of series systems with warm standby components, Tseng et al. (2013) studied comparative analysis of three systems with imperfect coverage and standby switching failures and Wang and Chin (2006) also discussed on cost benefit analysis of series systems with cold standby components and a repairable service station. In their research paper Wang and Chin (2006) considered three configurations as follows:

The first configuration is a serial system of one primary 30 MW component with one cold standby 30MW component. The second configuration is a serial system of two primary 15MW components and one cold standby 15MW component. The last configuration is a serial system of three primary 10MW components with two interchangeable cold standby 10MW components. Each standby unit can replace either one of the failed components and the total of 30MW is expected in all the three

Muhammad Salihu Isa, U A Ali, Bashir Yusuf, Ibrahim Yusuf, Yusuf Jamilu Umar

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , N° ^n9

Volume 15, December 2020

DYNAMO CONFIGURATIONS_'_

configurations. Lastly, Wang and Kuo (2018) have studied cost benefit analysis of three systems with imperfect coverage and standby switching failures. In the paper, data center require a 30MW power electricity, and they assumed that the electricity generation capacity of generators is available in units of 30MW, 15MW, and 10MW. To provide reliable and stable power supply, there are standby generators, and all the active and standby generators are continuously monitored by a fault detecting device to identify if they fail. They also assumed that standby generators are allowed to fail while inactive before they are put into full operation. Goyal et al. (2017) published a research work on Sensitivity analysis of a three unit series system under k-out of-n redundancy. Considering reliability, as one of the performance measure, the authors have designed a complex system which consists of three subsystems, namely, A, B and C in series configuration. The subsystem A consists of n numbers of units which are arranged in parallel configuration, subsystem B consists of two sub-subsystems X and Y align parallel to one another, where X is a type of 1-out-of-n. Failure and repair rates are assumed to follow the general distribution.

In this research work, some relevant literature related to reliability analysis and performance evaluation of dynamo system configurations were reviewed which mostly focused on the cost benefit analysis of the system. Relevant literature that has to do with system modeling and how the model would be applied to solved practical system and improved efficiency as studied by many scholars were reviewed. This research paper further enhanced the work of the previous researchers. 100MW was considered as the total output and the three configurations have uniform of 25MW in all the units of the configurations. Furthermore, some practical applications are also addressed.

II.Notation, Assumption and Description of Three Configurations

Notations

A : Failure rate ß : Repair rate

Avi; i = 1,2,3 Availability of system MTTFi; i = 1,2,3 Mean time to failure Q(t) = Probability row vector

Assumptions

1. Systems have redundant standby units

2. Repair is immediate

3. Switching from standby level to operation stage is perfect

Description of the three configurations

Configuration I consists of six units each of the unit has 25MW arranged in series-parallel. Out of the six units four are on operational stage while two are on standby. The failure of A1 or A6 causes the complete failure of the system. Configuration II has seven sub-components/ units with 25MW each arranged in series-parallel, three of the units are on standby while the remaining four are on operation stages, the failure of the system is said to have occur if B2 and A1 or A2 fails. Configuration III comprises of two subsystems C and D with three units in each subsystem and out three units there is one standby with 25MW in each unit. Out of the six units in total four are on operation while two are on standby. The system will collapse if C1 and C2 or C5 and C6 fail. The parameter A represents the failure rate in all the three configurations. Whenever active unit fails, it will immediately be replaced by a standby and the failed unit is taken for repair which is represented by

Figure 2: Block diagram of Configuration II

Figure 3: Block diagram of Configuration III

III. Models Formulation Availability and Meantime to Failure of Configuration I

According to Wang et al. (2006), let Q (t) be the probability that at time t there are n components working in the system. Then the initial conditions for this problem are stated as follows:

Q(0) = [Qo(0),QI(0),Q2(0).....Qi6(0)] = [1,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0,0]

The following differential equations are obtained:

Q'0 (t) = Ql (t) = Q2 (t) = Qs (t) = Ql (t) = Q's (t) =

Q'e (t) =

Q7 (t) = Q8 (t) = Q9 (t) = Qlo (t) = Qli (t) = QL (t) = Qls (0 = QL (t) = Qls (t) = QL (t) =

-4XQo(t) + ^Qi(t) + vQ2(t) + nQ7(t) + iiQB(t) (4X +p )Qi(t)+ XQo(t) + ¡iQ3(t) + + ¡iQ9(t) + ^Qio(t)

(4A + v )Q2(t)+ AQo(t)+ nQs(t)+ nQ6(t) + nQii(t) + nQi2(t) -& + H )Qs(t)+ Wi(t)+ ^Qis(t) -(X + H )Qi(t)+ XQi(t) + nQu(t)

-(k + VL )Qs(t) + AQ2(t)+ nQiS(t) (X + v )Q6(t) + XQ2(t)+ pQi6(t)

VQ7(t) + XQo(t)

-Mt) +

-HQ9(t) + VQio(t)

vQii(t) -vQi2(t)

-vQis(t) ^Qii(t) vQis(t) -VQie(t)

¿Qo(t)

Wi(t) + ¿Qi(t) + *Q2(t) + *Q2(t) + *Qs(t) + ^Qi(t) + ¿Qs(t) + *Q6(t)

(1)

The differential equations in (1) above can be written in the matrix form as Q'(t) = TiQ(t)

(2)

where

T =

-4X 0 0 0 0 V V 0 0 0 0 0 0 0 0

X - -yi 0 V V 0 0 0 0 V V 0 0 0 0 0 0

X 0 -Jl 0 0 V V 0 0 0 0 V V 0 0 0 0

0 X 0- y 2 0 0 0 0 0 0 0 0 0 V 0 0 0

0 X 0 0 y 2 0 0 0 0 0 0 0 0 0 V 0 0

0 0 X 0 0 y 2 0 0 0 0 0 0 0 0 0 V 0

0 0 X 0 0 0 y 2 0 0 0 0 0 0 0 0 0 V

X 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0 0

X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0

0 X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0

0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0 0

0 0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0

0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0 0

0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0

0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0

0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0

0 0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V

yi = (4A + |j) and y2 = (A + |j)

Equation (2) above can be written in the matrix form as:

/Q'0(t) \ Ql(t) Q'2(t) Q's(t) Q\(t) Q'5(t) Q'e(t)

Q'7(t) Q's(t) Q9(t) QUt) Q'n(t) Qiïfà Qis(t) QL(t) Qis(t) \Q[6(t) )

-4Â 0 0 0 0 V V 0 0 0 0 0 0 0 0

X 0 V V 0 0 0 0 V V 0 0 0 0 0 0

X 0- -yi 0 0 V V 0 0 0 0 V V 0 0 0 0

0 X 0- -Jï 0 0 0 0 0 0 0 0 0 V 0 0 0

0 X 0 0 -Jï 0 0 0 0 0 0 0 0 0 V 0 0

0 0 X 0 0 -Jï 0 0 0 0 0 0 0 0 0 V 0

0 0 X 0 0 0 -Jï 0 0 0 0 0 0 0 0 0 V

X 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0 0

X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0

0 X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0

0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0 0

0 0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0

0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0 0

0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0

0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0

0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0

0 0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V

In the steady state all the derivative equal to zero, thus from equation (2) above, TiQ(#) = 0 is obtained.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

-4X 0 0 0 0 V V 0 0 0 0 0 0 0 0 / vov-v \ QiM 0

X -yi 0 V V 0 0 0 0 V V 0 0 0 0 0 0 0

X 0- -yi 0 0 V V 0 0 0 0 V V 0 0 0 0 Qï(œ) 0

0 X 0- y 2 0 0 0 0 0 0 0 0 0 V 0 0 0 Q3(œ) 0

0 X 0 0 -yï 0 0 0 0 0 0 0 0 0 V 0 0 Q4(™) 0

0 0 X 0 0 y 2 0 0 0 0 0 0 0 0 0 V 0 0

0 0 X 0 0 0 y 2 0 0 0 0 0 0 0 0 0 V Qe(™) 0

X 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0 0 Q7(™) 0

X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0 Qs(™) = 0

0 X 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 Ç9(œ) 0

0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 Qio(œ) 0

0 0 X 0 0 0 0 0 0 0 0 -V 0 0 0 0 0 QiiM 0

0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0 0 Qiï(œ) 0

0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0 QisM Qi4M [QisM \n . (orA / 0

0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0 0

0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -V 0 0

0 0 0 0 0 0 X 0 0 0 0 0 0 0 0 0 -n) (0)

(3)

Using the normalizing condition

Z£0Qi(«>)= 1

(4)

Following Wang et al (2006) Equation (4) is substituted in the last row of (3) to obtain

i6

/Qo(œ Qi(œ

Q2(œ

Q3 (œ Qé(œ QS(œ Qe(™ Q?(™ Qs(™

Q^

Qio(œ Qn(œ Q12 (œ Q13 (œ Qi4(œ

, Ç15 (œ \Qie(œ

System of linear differential equations given in equation (5) above was so package to obtain the explicit solution of Q0 (m), Q1 (m),Q2 (m) ,..., Q16 (m

,.3

AVi(m) = Qo(m) + Qi(m) + Q2(m) + Q3(m) + Q4(m) + Qs(m) + Q6(m)

-4A 0 0 0 0 V V 0 0 0 0 0 0 0 0

A -yi 0 V V 0 0 0 0 V V 0 0 0 0 0 0

A 0- -yi 0 0 V V 0 0 0 0 V V 0 0 0 0

0 A 0- y 2 0 0 0 0 0 0 0 0 0 V 0 0 0

0 A 0 0 y 2 0 0 0 0 0 0 0 0 0 V 0 0

0 0 A 0 0 y 2 0 0 0 0 0 0 0 0 0 V 0

0 0 A 0 0 0 y 2 0 0 0 0 0 0 0 0 0 V

A 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0 0

A 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0 0

0 A 0 0 0 0 0 0 0 -V 0 0 0 0 0 0 0

0 A 0 0 0 0 0 0 0 0 -V 0 0 0 0 0 0

0 0 A 0 0 0 0 0 0 0 0 -V 0 0 0 0 0

0 0 A 0 0 0 0 0 0 0 0 0 -V 0 0 0 0

0 0 0 A 0 0 0 0 0 0 0 0 0 -V 0 0 0

0 0 0 0 A 0 0 0 0 0 0 0 0 0 -V 0 0

0 0 0 0 0 A 0 0 0 0 0 0 0 0 0 -V 0

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

(5)

A 1 0

0

0

0

0

0

0

0

0

0

0

0

0

0

W

ved using MATLAB

4X3 + 8X2+4Xp2+ p3

Now to evaluate the MTTFi, the rows and column of the absorbing (failure) state were deleted and the new matrix Mi was transposed as given in the equation (6) below, Wang et al. (2006):

E[TQ(0) ^ Q(absorbing)] = Q(0) (-M-1)[1,1,1,1,1,1,1]T Where,

(6)

M, =

-4A A A 0 0 0 0

V -yi 0 A A 0 0

V 0 -yi 0 0 A A

0 V 0 y 2 0 0 0

0 V 0 0 y 2 0 0

0 0 V 0 0 y 2 0

0 0 V 0 0 0 y 2

From equation (6) we have:

E[TQ(0) ^ Q(absorbing)] = MTTFl = + ■ ^ + ^ + ^

8X2 + 5Xp + p2 2X(8X2+5Xp + p2)

Availability and Meantime to Failure of Configuration II

To further investigate the availability of configuration II, Qt (t), i = 0,1,2,3,... ,10 were defined to be the probabilities that the system at time t > 0 is in state Si . Let Q(t) be the probability row vector at time t > 0. The initial condition for this problem is

Q(0) = [Qo(0),Qi(0),Q2(0).....Qio(0)] = [1,0,0,0,0,0,0,0,0,0,0] .

Then the following differential equations are obtained:

^(t) = -QAQo(t) + nQi(t) + Mt)

dQi ,

-f(t)= -(QA + [i )Qi(t)+ 4AQo(t) + nQ3(t) + Mt) ^(t)= -(8X + H )Q2(t)+ 4AQo(t) + nQs(t) + nQ6(t) ^(t) = -(QA + n)Q3(t) + 4AQi(t) + fiQ7(t) + nQB(t) ^(t) = -(QA + [i )Q4(t)+ 4AQi(t) + nQ9(t) + fiQw(t)

dQ5 / dt ( dQe

dt ( dQ7 r

dt ( dQs r dt ( dQ9 dt

dQto dt

= -iiQs(t)+ 4AQï(t) = -nQ6(t)+ 4XPï(t) = -nQ7(t)+ 4XQ3(t) = -nQB(t)+ 4AQ3(t) = -nQ9(t) + 4XQ4 (t) t) = -nQio(t) + 4XQ4 (t)

(7)

With initial conditions Q(0) = [Q0(0),Q1(0),Q2(0),^,Q10(0)] = [1,0,0,0,0,0,0,0,0,0,0]. Equation (7) could be written in the form of matrix as given in equation (8) below:

Q'(t) = TïQ(t)

(8)

\

> > > > > > >

dQio dt

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

-8 X 0 0 0 0 0 0 0 0

4X -ys 0 V V 0 0 0 0 0 0

4X 0 -Ys 0 0 V V 0 0 0 0

0 4X 0 -ys 0 0 0 V V 0 0

0 4X 0 0 -ys 0 0 0 0 V V

0 0 4X 0 0 -V 0 0 0 0 0

0 0 4X 0 0 0 -V 0 0 0 0

0 0 0 4X 0 0 0 -V 0 0 0

0 0 0 4X 0 0 0 0 -V 0 0

0 0 0 0 4X 0 0 0 0 -V 0

0 0 0 0 4X 0 0 0 0 0 -\i.

/Qo( 1 Qi( Qï(

Qs( Q4 (

Qs( Qe(

Q7 ( Q8(

\qI(*))

(t) )

Where, y3 = (8A +

To calculate the state probabilities, all derivatives of state are equal to zero. This will enable us to compute steady state availability by equating the left hand side of equation (8) to zero. Now we have

TïQ(™)= 0

(9)

Thus, equation (9) above could be written in matrix form as:

-8X 0 0 0 0 0 0 0 0

4X -J3 0 V V 0 0 0 0 0 0

4X 0 -J3 0 0 V V 0 0 0 0

0 4X 0 -J3 0 0 0 V V 0 0

0 4X 0 0 -J3 0 0 0 0 V V

0 0 4X 0 0 -V 0 0 0 0 0

0 0 4X 0 0 0 -V 0 0 0 0

0 0 0 4X 0 0 0 -V 0 0 0

0 0 0 4X 0 0 0 0 -V 0 0

0 0 0 0 4X 0 0 0 0 -V 0

0 0 0 0 4X 0 0 0 0 0 -V

/Q0(t) \ 1 Q1(t) ^ Q2Q)

Qs(t) Qi(t) Qs(t) Qe(t) Q?(t) QB(t)

, Q9(t) ,

\Qi0(t))

1 0 0 0 0 0 0 0 0

0

Using the normalizing condition below, it follows that

£1=00№)=1 (10)

Solving equation (10) above to obtain the explicit solution of Q0 (to), Q1 (to), q2 (to), ..., Q10 (to), the explicit equation for steady state availability is therefore obtained as follows:

AV2(to) = qo(to) + & (to) + Q2(TO) + Q3(TO) + Q4(TO) = ^ (11)

Now to evaluate the MTTF for configuration II, following Wang and Kuo (2000) and Wang et al. (2006), the MTTF of the system could be obtained by deleting the rows and column of the absorbing (failure) state and transposing the new matrix M2. The expected time to reach an absorbing state is given in equation (12) below:

E[Tq(0) ^ Q(absorbing)] = Q(0) (-M-1)[1,1,1,1,1]T (12)

Where

(-8X 4X4X0 0 \

№ -Y3 0 4X 4X

M2 = 0 -J3 0 0

V 0 0 -73 0 I

0 0 0 -J3

Now for the second system, the explicit expression/equation of MTTF2 is given by equation (13) below:

T-,™ , _____ 8A+ u 128A2 + 24Au+2u2 S12A3 + 128A2u+16Au2 + u.3

E[Tq(0) ^ Q(absorbing)] = MTTF2 = + ^

128A2 + 16Ap + p.2 8(128A3+16A2p+Ap2) 32A(128A3+16A2^ +A V-2)

(13)

Availability and Meantime to Failure of Configuration III

For the analysis of availability case of configuration III, Qt (t), i = 0,1,2,3,... 7 are defined to be the probability that the system at time t > 0 is in the state Si. Let Q(t) also be the probability row vector at time t > 0. The initial condition for this problem is:

Q(0) = [Q0(0),Q1(0),Q2(0).....Ç7(0)] = [1,0,0,0,0,0,0,0].

^(t) = -8XQ0(t) + nQ1(t) + Mi)

^(t)= -(8X + fi )Q1(t)+ 4XQ0(t)+ nQ3(t)+ fiQ4(t)

^(t)= -(8X + [i )Q2(t)+ 4XQ0(t) + nQ3(t) + nQs(t)

^(t)= -(8X + 2[i )Q3(t)+ 4XQ1(t) + 4XQ2(t) + nQ6(t) + Mt)

d-^(t)= -Mt)+ 4XQ1(t)

^(t)= -nQs(t)+ 4AQ2(t)

dQe, ,

"-§(t)= -Mt)+ 4AQ3(t)

d-^(t)= -nQ7(t)+ 4AQ3(t) (14)

Equation (14) is rewritten in the matrix form as presented in equation (15) below: Q'(t) = T3Q(t) (15)

Where,

T =

-8X 0 0 0 0 0

4X -J3 0 V V 0 0 0

4X 0 -J3 V 0 V 0 0

0 4X 4X 0 0 V V

0 4X 0 0 -V 0 0 0

0 0 4X 0 0 -V 0 0

0 0 0 4X 0 0 -V 0

0 0 0 4X 0 0 0 -V

Where y4 = (8A + 2^)

Initial conditions are considered as given in the following equation: [Qo(0),QI(0),Q2(0).....07(0)] = [1,0,0,0,0,0,0,0].

Q(0) =

To obtain the steady state probabilities, right hand side of (15) is equated to zero such that

T3Q(œ)= 0

(16)

Thus, (16) can be written in matrix form as follows:

/Qo( Qi(» Q2(™ Q3 (» Qé(» Qs(» Qe(» v \Qj(»

Solving (16) using normalizing condition

-8X 0 0 0 0 0 0

4X -J3 0 V V 0 0

4X 0 -J3 0 V 0 0

0 4X 4X 0 0 V V

0 4X 0 0 -V 0 0 0

0 0 4X 0 0 -V 0 0

0 0 0 4X 0 0 -V -J

0 0 0 4X 0 0 0

0

0 0 0 0 0

o

ZL0Qi(»)= 1

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

(17)

Q0(<x), Qi('x),Q2('x), Q3(™), Q4(m),Qs(m), Qe(m), Q7(™) are obtained. Therefore, the explicit expression/equation of AV3(#) is given by

AVa(») = Q0(») + Q1(») + Q2(») + Q3(»)

p3 + 8Xp2+ 16X2p 128X3+ 48X2 + 8Xp2+ p3

(18)

To compute MTTF for configuration III, follow similar argument used in configurations I and II. The rows and column of the absorbing states of the matrix T3 are therefore deleted and take the transpose to obtain a new matrix M3

E[TQ(0) ^ Q(absorbing)] = Q(0) (-M-1)[1,1,1,1]T (19)

Where, M3 =

-8Â 4À 4À 0

-J3 0 4Â

V 0 -J3 4X

0 № y4

The explicit expression/equation of MTTF3 is therefore obtained as follows:

1 4A+ p. 32A2 + 8Ap+ p.2

E[Tq(0) ^ Q(absorbing)] = MTTF3 =

2(8A+ p.) 4(8A2 + + Ap.) 32A(8A2 +A p.)

(20)

IV. Discussion

Sensitivity Analysis of Three Configurations

In this section, numerical comparisons for the result of sensitivity analysis for all the developed models were presented. Computer software, MATLAB is used to compute the three configurations in terms of their sensitivity analysis. From the results of system one it has been observed that configuration I is far better than all the remaining configurations as we can observed in table 1 through 2 below. It can be see that availability of configuration I is compared with that of configuration II and configuration III in terms of failure rate A and repair rate Furthermore, virtually all the configurations were compared with configuration I in terms of their MTTF with effect of failure rate A and repair rate v that is table 5 to table 6 below. It is also observed that configuration I retain its optimality.

Similarly, configuration I was compared with all the remaining configurations and turn to be the best in terms of Profit and table 3 to table 4 below clearly justify that the configuration I is the optimal. However, in the sensitivity results obtained from table 1 through table 6 with the help of Bar chat ( i.e. Figure 1 - 18 ) below, availability versus failure and repair rate, Profit versus failure and repair rates and MTTF versus failure and repair, it can be justified that configuration I was the best because as one can observed from all tables below. Despite the fact that failure increases in table 1 for instance configuration I has the maximum availability and similarly with repair it shows more increasing trends which is far better than the remaining configurations and this bridge the practical gap that remains untouched.

Table 1: Variation of Availability with respect to v for the three Configurations for different values of A

V A = 0.1 A = 0.5 A = 0.9

Configuration Configuration Configuration

I II III I II III I II III

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

0.1111 0.4316 0.1383 0.1507 0.1668 0.0278 0.0285 0.1042 0.0154 0.0157

0.2222 0.5664 0.2710 0.3017 0.2681 0.0555 0.0581 0.1804 0.0309 0.0317

0.3333 0.6473 0.3907 0.4331 0.3377 0.0833 0.0886 0.2389 0.0463 0.0481

0.4444 0.7030 0.4935 0.5398 0.3899 0.1109 0.1196 0.2856 0.0617 0.0649

0.5556 0.7439 0.5788 0.6239 0.4316 0.1383 0.1507 0.3240 0.0771 0.0818

0.6667 0.7750 0.6483 0.6897 0.4663 0.1656 0.1818 0.3566 0.0925 0.0989

0.7778 0.7995 0.7044 0.7411 0.4961 0.1925 0.2126 0.3847 0.1078 0.1161

0.8889 0.8193 0.7497 0.7817 0.5222 0.2191 0.2430 0.4094 0.1231 0.1334

1.0000 0.8356 0.7864 0.8140 0.5455 0.2453 0.2727 0.4316 0.1383 0.1507

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , N° ^^

Volume 15, December 2020

DYNAMO CONFIGURATIONS

Figure 1: Availability against ^ for A= 0.1

Figure 2: Availability against ^ for A = 0.5

Figure 3: Availability against ^ for A = 0.9

Table 2: Variation of Availability with respect to A for the three Configurations for different values of

A | = 0.3 | = 0.6 | = 0.9

Configuration Configuration Configuration III

I II III I II III I II III

0.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000

0.1111 0.6053 0.3244 0.3611 0.7388 0.5679 0.6133 0.8057 0.7186 0.7539

0.2222 0.4686 0.1676 0.1841 0.6053 0.3244 0.3611 0.6853 0.4591 0.5047

0.3333 0.3922 0.1122 0.1211 0.5246 0.2217 0.2460 0.6053 0.3244 0.3611

0.4444 0.3399 0.0843 0.0898 0.4686 0.1676 0.1841 0.5479 0.2482 0.2760

0.5556 0.3008 0.0675 0.0712 0.4262 0.1345 0.1464 0.5040 0.2003 0.2215

0.6667 0.2701 0.0562 0.0589 0.3922 0.1122 0.1211 0.4686 0.1676 0.1841

0.7778 0.2452 0.0482 0.0502 0.3639 0.0963 0.1032 0.4392 0.1440 0.1572

0.8889 0.2247 0.0422 0.0437 0.3399 0.0843 0.0898 0.4141 0.1262 0.1369

1.0000 0.2073 0.0375 0.0388 0.3191 0.0749 0.0794 0.3922 0.1122 0.1211

Figure 4: Availability against A for | = 0.3

Figure 5: Availability against A for | = 0.6

Figure 6: Availability against A for ^ = 0.9

Table 3: Variation of Profit* 106 with respect to ^ for the three Configurations for different values

of A

A = 0.1 A = 0.5 A = 0.9

Configuration Configuration Configuration

I II III I II III I II III

0.1111 2.1574 0.6912 0.7532 0.8337 0.1384 0.1420 0.7785 0.7671 0.5205

0.2222 2.8318 1.3545 1.5082 1.3399 0.2773 0.2903 1.582 1.5387 0.9016

0.3333 3.2362 1.9534 2.1650 1.6879 0.4158 0.4426 2.403 2.3100 1.1941

0.4444 3.5149 2.4673 2.6986 1.9491 0.5539 0.5974 3.2382 3.0808 1.4275

0.5556 3.7191 2.8939 3.1193 2.1574 0.6912 0.7532 4.0849 3.8506 1.6198

0.6667 3.8749 3.2413 3.4480 2.3310 0.8274 0.9087 4.9401 4.6192 1.7825

0.7778 3.9976 3.5220 3.7053 2.4799 0.9621 1.0628 5.8013 5.3860 1.9231

0.8889 4.0964 3.7484 3.9082 2.6106 1.0951 1.2146 6.666 6.1505 2.0469

1.0000 4.1778 3.9316 4.0696 2.7270 1.2260 1.3632 7.5319 6.9121 2.1574

Figure 7: Profit against ^ for A = 0.1

0,1 0,2 0,3 0,4 0,5

■ Configuration I «Configuration II «Configuration I

Figure 8: Profit against j for A = 0.5

Figure 9: Profit against j for A = 0.9

Table 4: Variation of Profit* 106 with respect to A for the three Configurations for different values of [J_

[ = 0.3 j = 0.6 j = 0.9

A Configuration Configuration Configuration

I II III I II III I II III

0.1111 3.0264 1.6216 1.8054 3.6939 2.8392 3.0664 4.0284 3.5927 3.7691

0.2222 2.3429 0.8376 0.9203 3.0264 1.6216 1.8054 3.4264 2.2950 2.5230

0.3333 1.9605 0.5608 0.6052 2.6228 1.1083 1.2296 3.0264 1.6216 1.8054

0.4444 1.6990 0.4210 0.4484 2.3429 0.8376 0.9203 2.7393 1.2406 1.3798

0.5556 1.5035 0.3369 0.3554 2.1306 0.6720 0.7314 2.5195 1.0009 1.1071

0.6667 1.3501 0.2807 0.2940 1.9605 0.5608 0.6052 2.3429 0.8376 0.9203

0.7778 1.2259 0.2406 0.2506 1.8193 0.4810 0.5154 2.1958 0.7195 0.7855

0.8889 1.1229 0.2105 0.2183 1.6990 0.4210 0.4484 2.0701 0.6304 0.6840

1.0000 1.0361 0.1870 0.1933 1.5949 0.3743 0.3966 1.9605 0.5608 0.6052

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , ^^

Volume 15, December 2020

DYNAMO CONFIGURATIONS

Figure 10: Profit against A for ^ = 0.3

Figure 11: Profit against A for ^ = 0.6

Figure 12: Profit against A for ^ = 0.9

Table 5: Variation of MTTF with respect to ^ for the three Configurations for different values of A

A = 0.1 A = 0.5 A = 0.9

Configuration Configuration Configuration

I II III I II III I II III

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

0.1111 5.6761 3.3914 3.3960 1.2183 0.6355 0.6355 0.6843 0.3504 0.3505

0.2222 5.4158 3.6692 3.6836 1.1919 0.6460 0.6462 0.6751 0.3537 0.3537

0.3333 5.2795 3.9574 3.9828 1.1698 0.6567 0.6571 0.6668 0.3569 0.3570

0.4444 5.2001 4.2544 4.2907 1.1511 0.6674 0.6681 0.6593 0.3602 0.3603

0.5556 5.1501 4.5590 4.6050 1.1352 0.6783 0.6792 0.6524 0.3635 0.3637

0.6667 5.1166 4.8700 4.9242 1.1216 0.6892 0.6905 0.6462 0.3668 0.3671

0.7778 5.0931 5.1862 5.2475 1.1099 0.7002 0.7019 0.6406 0.3701 0.3705

0.8889 5.0761 5.5069 5.5738 1.0998 0.7114 0.7134 0.6354 0.3735 0.3739

1.0000 5.0633 5.8312 5.9028 1.0909 0.7226 0.7250 0.6307 0.3768 0.3773

Figure 13: Profit against ^ for A = 0.1

Figure 14: Profit against ^ for A = 0.5

Figure 15: Profit against | for A = 0.9

Table 6: Variation of MTTF with respect to A for the three Configurations for different values of ^

|= 0.3 |= 0.6 |= 0.9

A Configuration Configuration Configuration

I II III I II III I II III

0.1111 4.8126 3.4128 3.4299 4.6403 4.0644 4.1046 4.5789 4.7509 4.8076

0.2222 2.5215 1.5526 1.5555 2.4063 1.7064 1.7150 2.3508 1.8666 1.8813

0.3333 1.7254 1.0020 1.0029 1.6482 1.0687 1.0718 1.6042 1.1376 1.1433

0.4444 1.3152 0.7392 0.7396 1.2608 0.7763 0.7777 1.2262 0.8143 0.8171

0.5556 1.0638 0.5855 0.5858 1.0236 0.6091 0.6099 0.9961 0.6331 0.6347

0.6667 0.8935 0.4847 0.4849 0.8627 0.5010 0.5015 0.8405 0.5175 0.5185

0.7778 0.7704 0.4135 0.4136 0.7461 0.4254 0.4257 0.7279 0.4375 0.4381

0.8889 0.6773 0.3605 0.3606 0.6576 0.3696 0.3698 0.6424 0.3788 0.3793

1.0000 0.6043 0.3196 0.3196 0.5880 0.3267 0.3269 0.5751 0.3340 0.3343

Figure 16: Profit against A for |= 0.3

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , N° ^^

Volume 15, December 2020

DYNAMO CONFIGURATIONS

Figure 17: Profit against Л for ц= 0.6

Figure 18: Profit against Л for ц= 0.

Conclusion

In this paper, three different series - parallel dynamo configurations were constructed with standby in each of the configuration and a repairable service station to study the sensitivity analysis of the three configurations under probability. The explicit expressions/equations for MTTF and Availability for the three configurations were developed and performed a sensitivity analysis base on the numerical values fixed. It was found out that the optimal configuration using the sensitivity analysis by fixing both A and ^ is configuration I.

References

1. Abdul Kareem L. and Singh, V. (2019), Cost Assessment of Complex Repairable System consisting two Subsystems in Series Configuration using Gumbel Hougaard Family Copula, International Journal of Quality & Reliability Management, 36(10): 1683-1698 https://doi.org/10.1108/IJQRM-12-2018-0322

2. Chauhan, S. K and Malik S. C (2017), Evaluation of Reliability and MTSF of a Parallel System with Weibull Failure Law, Journal of Reliability and Statistics 10(1): 137- 146

Muhammad Salihu Isa, U A Ali, Bashir Yusuf, Ibrahim Yusuf, Yusuf Jamilu Umar

SENSITIVITY ANALYSIS OF THREE DIFFERENT SERIES - PARALLEL „ , ^^

Volume 15, December 2020

DYNAMO CONFIGURATIONS_'_

3. Chunbo, Y., Shengkui, Z. and Jianbin, G. (2015), Reliability Analysis of Load-Sharing K-out-of-N System Considering Component Degradation, Journal of Mathematical Problems in Engineering. Volume (2015) : 1-10

4. Dalip S and Gulshan T. (2014), Reliability and Economic Analysis of a Power Generating System Comprising one Gas and one Steam Turbine with Random Inspection, Journal of Mathematics and Statistics, 10(4): 436 - 442.

5. Goyal N. , Ram M. , Amoli S. , and Suyal A. (2017), Sensitivity Analysis of a Three Unit Series System under k - out - of - n Redundancy, International Journal of Quality and Reliability Management, 34(6): 770 - 784

6. Kumar A. , Pawar D. and Malik S. C (2020), Reliability Analysis of a Redundant System with FCFS Repair Policy Subject to Weather Condition, International Journal of Advance Science and Technology, 29(03): 7568 - 7578

7. Rajesh, Gulshan T. and Jagdish P. (2018), Reliability and Availability Analysis for a Three Unit Gas Turbine Power Generating System with Seasonal Effect and FcFs Repair Pattern, International Journal of Applied Engineering Research, ISSN 0973-4562 13 (12): 10948-10964

8. Ram M. , and Kumar A. (2015), Performability Analysis of a System Under 1 - out - of - 2 : G Scheme with Perfect Reworking, Journal of the Brazilian Society of Mechanical Sciences and Engineering, Volume14, 450-458 (2015)

9. Singh D and Taneja G. (2013), Reliability Analysis of a Power Generating System through Gas and Steam Turbines with Scheduled Inspection, Aryabhatta Journal of Mathematics and Informatics, 5(2): 373 - 380

10. Singh D and Taneja G. (2014), Reliability and Cost Benefit Analysis of a Power Plant Comprising two Gas and one Turbines with Scheduled Inspection, International Journal of Soft Computing and Engineering, 4(3): 30 - 37

11. Wang, K.-H. and Kuo, C.-C (2000), Cost and Probabilistic Analysis of Series Systems with Mixed Standby Components, Applied Mathematical Modelling, 24 : 957-967.

12. Wang, K.-H. and Pearn, W. L. (2003), Cost Benefit Analysis of Series Systems with warm Standby Components, Mathematical Methods of Operations Research, 58: 247-258

13. Wang, K.H. and Chiu, L.W. (2006), Cost Benefit Analysis of Availability Systems with Warm Standby Units and Imperfect Coverage, Applied Mathematics and Computation, 172 : 1239-1256

14. Wang K. and Yen T.C (2018). Cost Benefit Analysis of Three Systems with Imperfect Coverage and Standby Switching Failures, International Journal of Mathematics in Operations research, 12(2): 253 - 272.

15. Yusuf, I. (2016), Reliability Modelling of a Parallel System with a Supporting Device and Two Types of Preventive Maintenance, International Journal of Operational Research, 25(3): 269-287

Received: July 17, 2020 Accepted: October 15, 2020

i Надоели баннеры? Вы всегда можете отключить рекламу.