Performance Analysis of Network System Configured as Series-Parallel Subject to Different Repair Policies: Copula Approach to Joint Probability Distribution
Ismail Muhammad Musa1*, Ibrahim Yusuf2
department of Mathematical Sciences, Al-Qalam University katsina, Nigeria ^Department of Mathematical Sciences, Bayero University Kano, Nigeria
[email protected] [email protected]
Abstract
A network system is designed in this paper. It has two labs connected in parallel with four units each; working under 3-out-of-4: G; policy, two servers connected in parallel working under 1-out-of-2: G; policy and a router. The labs, servers and the router are connected in series all together. By making use of a supplementary variable and Laplace transforms to varies measures of system reliability, the network system has been studied and evaluation of Sensitivity, Availability, Reliability, (Mean time to failure) MTTF, and cost analysis for particular values of the failure and repair rates is made. Conclusion has been done with computed results demonstrated by tables, figures and graphs.
Keywords: Network, System, Availability; Reliability; Gumbel Hougard, seriesparallel.
1. Introduction
It is very vital that a network system or any industrial system should be defendable and consistent; such system is more desirable than any other. The availability and reliability of that system plays a big role in its production output, performance, industrial growth and expected profit. In trying to enhance the performance of such desirable network/industrial systems many researchers evaluate different systems. Kabiru and Singh [1] made a reliability assessment of complex system consisting two subsystems connected in series configuration using Gumbel-Hougaard family copula distribution. Yusuf and Ismail [6] focused on reliability analysis of communication network system with redundant Relay Station under Partial and Complete Failure.
Singh and Poonia [14] study the performance analysis of a complex repairable system with two subsystems in series configuration with an imperfect switch. Using transition diagrams and systems of first order differential difference equations Yusuf and Sani in [2] developed and solved a system recursively to obtain the steady-state availability, busy period of repair men and profit function. Kakkar and Chitkara [15] consider finding the reliability of two unit parallel industrial system. Lado and Singh [4] develop a model of a complex repairable system having two subsystems A and B which is connected in a series configuration. Kakkar and Chitkara [9] present reliability of two dissimilar parallel units in the present of preventive maintenance. Yusuf and Mahmud [3] use Markov model of a system derived through the system state transition table and differential
Ismail Muhammad Musa, Ibrahim Yusuf
PERFORMANCE ANALYSIS OF NETWORK SYSTEM CONFIGURED AS .. c c ' u°
Volume 15, September 2020
SERIES-PARALLEL SUBJECT TO DIFFERENT REPAIR POLICIES...___
difference equations which are further used to evaluate the system availability and mean time to system failure and profit.
Using Copula Singh and Gulati [13] studied the performance analysis of complex system in series configuration under different failure and repair discipline. Garg [18] use fuzzy Kolmogorov's differential equations to make an approach for analyzing the reliability of industrial system. Yusuf and Bala [21] made an analysis of reliability characteristics of a parallel system with external supporting devices for operation.
2. State Description, Notation, and Assumptions 2.1 State description
So: This state represents a fully functional system with three working units and one standby unit in
both labs, one operational server and one standby server, and working router.
S1: This represents operational state with one unit down in lab 1.
S2: This represents failure state due to failure of two units in lab 1.
S3: This represents operational state with one unit down in lab 2.
S4: This represents failure state due to failure of two units in lab 2.
S5: This represents operational state with one server down.
S6: This represents failure state due to failure of both servers.
S7: This represents failure state due to failure of the main router.
S8: This represents operational state with one unit in lab 1 down and one server under repair. S9: This represents operational state with one unit in lab 2 down and one server under repair. S10: This represents operational with one server down and a unit in lab 2 under repair. S11: This represents operational with one server down and a unit in lab 1 under repair.
2.2 Notations
• t Stands for Time variable on a time scale.
• s Stands for Laplace transform variable for all expressions.
• p1 Stands for Failure rate of any unit in lab 1.
• p2 Stands for Failure rate of any unit in lab 2.
• p3 Stands for Failure rate of any server.
• p4 Stands for Failure rate of the router.
• <p(a) Stands for all Repair rates.
• Pi (t) Stands for the probability that the system is in Si state at instants for i = 0 to 9.
• P(t) Stands for Laplace transformation of the state transition probability P(t).
• Pi (a, t) Stands for the probability that a system is in state Si for i = 1,2, ...,11, the system is running under repair and elapse repair time is (a, t) with repair variable a and time variable t.
• Ep(t) Stands for Expected profit during the time interval [0, t).
• K1, K2 Stands for Revenue and service cost per unit time respectively.
2.3 Assumptions
It's assumed that at the beginning all the units in labs, servers and the router are working perfectly. At least three units from the two labs, one server and a router are needed for the system to operate. Failure rates are regarded as the same and may follow exponential distribution. Likewise repairs follow general distribution.
Figure 1: Transition Diagram
3. Mathematical Model Formulation
Bearing in mind the probability and continuity arguments, train set of difference differential equations and the present mathematical model are lump together as:
(yt + 4ßi + 4ß2 + 2ß3 + ß4) p0(t) = f0°° 0(a)Pl(a, t)da + f0°°^(a)p2(a, t)da + f0°° 0(a)p3(a, t)da + ÇKa)P4(a, t)da + f°° 0(a)p5(a, t)da + C[i(a)p6(a, t)da + f°°n(a)p7(a, t)da
(1)
(Î + Î+3Pi + 2ß3 +ß4 + 0(a)) Pi(a, t) = 0 (2)
(Tt + i + »(a))P2M = 0 (3)
(jt + Ta + 3ß2+ 2ßs +ß4 + 0(a)) Ps (a, t) = 0 (4)
ii + i + »(a))P4(a,t) = ° (5)
(i + i + 4ßi + 4ß2 +ßs+ß4 + 0(a)) p5(a, t) = 0 (6)
fe+i+^W^0 (7)
(Tt + Î + »(a))P7(a,t) = 0 (8)
(yt + ^ + ßs+ß4 + 0(a))p8(a,t) = 0 (9)
(jt + ^-a+ßs+ß4 + 0(a))p9(a,t) = 0 (10)
(Tt + Ta + 3ß2+ß4 + 0(a))pio(a,t) = 0 (11)
(yt + ^+3ß1+ß4 + 0(a))p11(a,t) = O (12)
Boundary condition
Pi(a,t) = 4ßiP0(t) (13)
p2(a,t) = 3ßiPi(a,t) (14)
p3(a,t) = 4ß2p0(t) (15)
p4(a,t) = 3ß2p3(a,t) (16)
ps(a,t) = 2ß3p0(t) (17)
p6(a,t) = ß3ps(a,t) (18) P7 (a, t) = ß4 (p0 (t) + pi (a, t) + p3 (a, t) + p5 (a, t) + p8 (a, t) + p9 (a, t) + pw (a, t)+pn (a, t))
(19)
Pg(a,t) = 2ß3Pi(a,t) (20)
p9(a,t) = 2ß3P3(a,t) (21)
Pio(a,t) = 4ß2P5(a,t) (22)
Pii(a.t) = 4ßips(a,t) (23)
Solution of the Model:
Using initial condition, Po (0) =1and Laplace transformation of equations (1) to (23) we have the following:
(s + + 4p2 + 2p3 + p4)p^(s) = r 0(a)p±(a, s)da + Cp(a)^(a, s)da + C 0(a)p3<(a, s)da +
Ç Ka)p4(a,s)da + f™ 0(a)p5(a,s)da + Ç p(a)p6(a,s)da + Ç p(a)p7 (a, s)da
(24)
{Tt + Î+3Pi + 2ß3 +ß4 + 0(a)) Pi(a,s) = 0 (25)
(s+-^ + p(a))p2(a,s) = 0 (26)
(s+ya + 3ß2+ 2ß3 +ß4 + 0(a)) p3(a, s) = 0 (27)
(s+-^ + p(a))p4(a,s) = 0 (28)
(s+ya + 4ßi + 4ß2 +ß3+ß4 + 0(a)) P5(a, s) = 0 (29)
(s+ß(a))p6(a,s) = 0 (30)
(s+p(a))p7(a,s) = 0 (31)
(s+-^ + ß3+ß4 + 0(a))p8(a,s) = 0 (32)
(s+ya + ß3+ß4 + 0(a)) p9(a, s) = 0 (33)
(s+ya + 3ß2+ß4 + 0(a)) PÏ7(a, s) = 0 (34)
(s+j-a + 3ßi+ß4 + 0(a)) pi7(a, s) = 0 (35)
Laplace transform of boundary conditions
pi(0,s) = 4ßiTo(s) (36)
p2(0,s) = 3ßipi(0,s) (37)
p7(0,s) = 4ß2P7(s) (38)
p4(0,s) = 3ß2p3(0,s) (39)
P7(0,s) = 2ß3p7(s) (40)
P7(0,s) = ß3p7(0,s) (41)
P7(0, s) = ß4 (p0(s) + Pi(0, s) + P3(0, s) + P5(0, s) + P8(0, s) + P9(0, s) + Pi777(0, s) + Pi7(0, s))
(42)
p8(0,s) = 2ß3pi(0,s) (43)
Ismail Muhammad Musa, Ibrahim Yusuf
PERFORMANCE ANALYSIS OF NETWORK SYSTEM CONFIGURED AS .. c c t , ,o i,8
Volume 15, September 2020
SERIES-PARALLEL SUBJECT TO DIFFERENT REPAIR POLICIES...___
P<}(0, s) = 2ßsp3(0,s) (44)
PÏô(0,s) = 4ß2pJ(0,s~) (45)
Üi;(0,s) = 4ßip5(0,s) (46)
The solution of (24) to (35) with (36) to (46) results as;
(47)
P(S)=M1 (^(s+sß^ßM} (48)
iW D(s) V s+3ß1 + 2ß3+ß4 J V '
(49)
^-^t:™'} (5»)
nc^m (51)
( \ = 2ÈL [i-S^(s+4ßi+4ß2 + ß3 + ß4)^
( ) = D(s) ( s+4ß1+4ß2 + ß3 + ßi } ( )
^-fj^} (53)
JT^ - ßl(i+4ßi+4ß2 + 2ß3 + i6ßiß3 + i6ß2ß3) p-V^j
-pr(s) = SJiß3Ci-sixJ^3^} S (55)
8 D(s) l s + ß3+ß4 J V '
= (56)
KM-**. (57)
~p—r\ - 8ßlß3 (i-S$(s+3ß1 + ßi)}
P,
(s) = 8_Ml(i-s*(s+s^} (58)
iiW D(s) l s+ß3+ß4 J V '
Where D(s) = s + 4pi + 4p2 + 2p3 + p4- {^[^(s + + 2p3 + p4)} + 12p12[S^(s)} + 4p2[S^(s + 3p2 + 2p3 + p4)} + 12p22[S^(s)} + 2fi3[Stp(s + 4pi + 4p2 + p3 + p4)} + 2p32[S^s)} + p4 (1 + 4pi + 4p2 + 2p3 + I6P1P3 + 16p2p3)&(5)}} (59)
The followings are Laplace transformations of the state transition probabilities when the system is in initial, partial failure and failed condition at any time:
TÇ(s) = p-(s) + Pi (s) + P^(s) + P~5(s) + p-(s) + P9 (s) + T\0(s) + P^(s) (60)
Jçw=w (1+4,1 r^ri+4*2 v:^::?4}+
{ S + 4H1 + 4P2 + P3 + P4 } + 8p1p3 { S + P3 + P4 } + 8p2p3 { S + P3 + P4 } + 8l2f. {i-^!!^ (61)
4. Analytical Study of the Model for Particular Case
Availability Analysis
WithSrf, (s) = S,. (s) = —,1 = 1 ^^ = — and considering the values of different
^ s+<p ^ s+p s s+<p s s+p. °
parameters as = 0.03, p2 = 0.02, p3 = 0.05, p4 = 0.06, $ = ^ = 1 in (61), the expression for availability by taking the inverse Laplace transform is obtained as:
Pup(t) = 0.03892291366e-2 83830i077t - 0.06425625912e-i48977640St 0.00241062060e-i28332776it + 0.00023451Q3193e-i 22973i692t + 1.036198Q63e-00i7i6306460t 0.00204112976e-i i50000000t - 0.006655302231e-i ii0000000t
Table 1 and Figure 2 below shows different values of Pup(t) using (63) and time variable t= 0, 1, 2, 3, 4, 5, 6, 7, 8, 9,
Table 1: Variation of Availability with respect to time
Time(t) Availability
0 1
2 0.9970
4 0.9672
6 0.9348
8 0.9033
10 0.8728
12 0.8433
14 0.8149
16 0.7874
18 0.7608
1,2 1 0,8 1 0,997 09672
> 0,6
S CD 0,4 $ Availability
rs ä 0,2 0
0 2 4 6 8 10 12 14 16 18 Time (t)
Figure 2: Availability as function of time
Reliability Analysis
All repair rates, 0, set to zero in equation (61), the values of failure rates as ft = 0.03, ft = 0.02, ft = 0.05, ft = 0.06 and then computing inverse Laplace transform, express the reliability for the system as;
fl(t) = -2.889523810e-03600000000t + 0.03809523810e-0 1500000000t + 0.08000000000e-0 1100000°00t + 0.5714285714e-02200000000t + 1.2000000000e-02500000000t +
2 g-0.3100000000t (64)
Table 2 and Figure 3 below shows different values of Pup(t) using (63) and time variable t= 0, 1, 2, 3, 4, 5, 6, 7, 8, 9.
Table 2: Computation of reliability for different values of time
Time(t) Reliability
0 1
2 0.8577
4 0.6451
6 0.4553
8 0.3106
10 0.2081
12 0.1382
14 0.0917
16 0.0610
18 0.0409
Figure 3: Reliability as function of time Mean Time to Failure (MTTF) Analysis
All repairs are set to zero in equation (49), and then taking limit, as s tends to zero express MTTF as:
MTTF = lim P~~fs) = 1 ^ + 4li + + zfe + 8life + +
sm J 401 + 4ft,+ 203 +04 ( 301 + 203 + 04 302 + 203 + 04 401 + 402 + 03 + (S4 £3+ (S4 £3+(S4
-«+JW (65)
301+04 3^1+^4/ V >
Table 3 and figure 4 below express the variation of MTTF with respect to failure rates, by fixingft = 0.02,ft = 0.05,ft = 0.06 and varying ft as 0.01,0.02,0.03,0.04,005,0.06,0.07,0.08,0.09, fixing ft = 0.03, ft = 0.05, ft = 0.06 and varying ft as 0.01,0.02,0.03,0.04,005,0.06,0.07,0.08,0.09, fixingft = 0.03, ft = 0.02, ft = 0.06 and varying ft as 0.01,0.02,0.03,0.04,005,0.06,0.07,0.08,0.09, fixing ft = 0.03, ft = 0.02, ft = 0.05, and varying ft as0.01,0.02,0.03,0.04,005,0.06,0.07,0.08,0.09, in (61).
Table 3: Computation of MTTF corresponding to the various values of failure rates
Failure rate MTTF ft MTTF ft MTTF ft MTTF ft
0.01 8.0406 7.2282 8.6971 9.6404
0.02 7.4263 6.8927 8.0926 8.9180
0.03 6.8927 6.5597 7.6128 8.3040
0.04 6.4307 6.2478 7.2208 7.7725
0.05 6.0297 5.9624 6.8927 7.3061
0.06 5.6798 5.7036 6.6126 6.8927
0.07 5.3726 5.4699 6.3694 6.5231
0.08 5.1012 5.2586 6.1555 6.1903
0.09 4.8600 5.0673 5.9650 5.8889
40 35 30 25 20 15 10 5 0
MTTF ß4
MTTF ß3
MTTF ß2
MTTF ß1
0,01 0,02 0,03 0,04 0,05 0,06 0,07 0,08 0,09
Figure 4: MTTF corresponding to the various values of failure rates Sensitivity Analysis corresponding to (MTTF)
Table 4 and figure 5 below, express the sensitivity in MTTF of the system, using the partial differentiation of MTTF with respect to the failure rates of the system and setting parameters as ftx = 0.03,ft = 0.02, ft = 0.05, ft = 0.06.
Table 4: MTTF sensitivity as function of time
Failure rate ö(MTTF)/ ft ö(MTTF)/ ft ö(MTTF)/ ft ö(MTTF)/ ft
0.01 -65.5677 -32.4004 -68.4440 -78.8498
0.02 -57.2902 -33.9081 -53.4467 -66.2544
0.03 -49.6020 -32.4031 -43.1042 -56.9357
0.04 -42.9726 -29.8976 -35.6883 -49.6544
0.05 -37.3926 -27.1880 -30.1944 -43.8144
0.06 -32.7291 -24.5889 -26.0096 -39.0221
0.07 -28.8269 -22.2133 -22.7442 -35.0194
0.08 -25.5471 -20.0894 -20.7423 -31.6289
0.09 -22.7743 -18.2092 -28.7236 -28.7236
Figure 5: MTTF sensitivity as function of time
Cost Analysis
£p(0 = Ki/>up(t)dt-tf2t (65)
Equation (65) can be used to attain expected profit of the system in the interval [0,t), if service facilities is always available. Using (61) and (65), we obtain:
£p(t) = tf1(-0.01371345485e-2 838301077t + 0.04313147859e-1489776405t + 0.001878413822e-128332776" - 0.0001907069004e-1229731692t - 60.37376699e-0017163064600t + 0.001768793892 e-1 150000000t + 0.005995767776e-1 11000000M + 60.335) -
(66)
Table 5 and Figure 6 express the expected profit by setting = land = 0.6,0.5,0.4,0.3,0.2 and 0.1 respectively and varying time t = 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 in (66).
Table 5: Expected profit as function of time
Time(t) Ep(t);K2=0.6 Ep(t);K2=0.5 Ep(t);K2=0.4 Ep(t);K2=0.3 Ep(t);K2=0.2 Ep(t);K2=0.1
0 0 0 0 0 0 0
2 0.8016 0.0016 1.2016 1.4016 1.6016 1.8016
4 1.5672 1.9672 2.3672 2.7672 3.1672 3.5672
6 2.2690 2.8690 3.4690 4.0690 4.6690 5.2690
8 2.9069 3.7069 4.5069 5.3069 6.1069 6.9069
10 3.4828 4.4828 5.4828 6.4828 7.4828 8.4828
12 3.9987 5.1987 6.3987 7.5987 8.7987 9.9987
14 4.4567 5.8567 7.2567 8.6567 10.0567 11.4567
16 4.8588 6.4588 8.0588 9.6588 11.2588 12.8588
18 5.2069 7.0069 8.8069 10.6069 12.4068 14.2069
70
60
Ep(t);K2=0.1
Ep(t);K2=0.2
Ep(t);K2=0.3
Ep(t);K2=0.4
Ep(t);K2=0.5
Ep(t);K2=0.6
0 2 4 6 8 10 12 14 16 18
Time (t)
Figure 6: Expected profit as function of time
5. Conclusions
To make a conclusion on the performance of the system in this study, a study of the reliability measures on repair and failure rates with different values has been made. A provision of information on the availability of the system changing with time at fixed failure rates with different values has been made in table 1 and figure 2. It has been evidently found that gently and slowly the availability of system decreases and the probability of the failure increases at fixed failure rates p1 = 0.03, p2 = 0.02, p3 = 0.05, p4 = 0.06, and at a long run it will become steady to zero value. Therefore, at any chosen time and set of parametric values, one can easily say the future behavior of the system.
Setting repairs to zero, an analysis of the system reliability has been provided in table 2 and figure 3. By studying the availability and reliability of the system, one can conclude that providing repair to the system is better than replacement.
With other parameters considered as constant, mean-time-to-failure (MTTF) in variation of P1,P2,P3 and P4 respectively has been provided in figure 4. It also signifies that the variation of P1,P2,P3 and p4 are responsible for the better performance of the system.
Figure 5 shows the sensitivity analysis of system.
Figure 6 and table 5 shows the calculations of the profit at fixed revenue cost K1 = 1 per unit time and service costK2 = 0.6,0.5,0.4,0.3,0.2 and 0.1. The result shows that when the service cost K2 fixed at minimum value 0.1, the expected profit increases with respect to the time. In the end, one can observe that profit decrease whenever service cost increase.
References
[1] Kabiru, H., Singh, V., & Lado, A. (2017). Reliability assessment of complex system consisting two subsystems connected in series configuration using Gumbel-Hougaard family copula distribution. Journal of Applied Mathematics & Bioinformatics, 7(2), 1-27.
[2] Yusuf, I., Sani, B., & Yusuf, B. (2019). Profit Analysis of a Serial-parallel System under Partial and Complete Failures. Journal of Applied Sciences ISSN 1812-5654, 565-574. DOI: 10.3923/jas.
[3] Yusuf, I., Mahmud, S., & Sulaiman, K. (2018). Performance analysis of a single host system with three types of heterogeneous software. Research Journal of Applied Sciences, 13(12), 736-741.
[4] Lado, A., Singh, V. V. & Yusuf, I. (2018). Performance and cost assessment of repairable complex system with two subsystems connected in series configuration. International journal of reliability and applications, 19(1), pp. 27-42.
[5] Singh, V.V. & Ayagi, H.I., (2018). Stochastic analysis of a complex system under preemptive resume repair policy using Gumbel-Hougaard family of copula. International Journal of Mathematics in Operational Research, 12(2). 273-292.
[6] Yusuf, I., Ismail, A. L. & Ali, U. A., (2020). Reliability Analysis of Communication Network System with redundant Relay Station under Partial and Complete Failure. Journal of Mathematical And Computational Science 10(4) 863-880,
[7] Gahlot, M., Singh V. V., Ayagi, H. I., & Goel, C. K., (2018). Performance assessment of repairable system in series configuration under different types of failure and repair policies using copula linguistics, Int. J. Reliab. Safety, 12(4), 348-363.
[8] Gulati, J., Singh, V. V. & Rawal, D. K., (2018). Performance assessment of two unit's redundant system under different failure and repair policies using copula. Int. J. Reliab. Appl. 19(2), 109124.
[9] Kakkar, M., Chitkara, A. & Bhatti, J. (2016). Reliability analysis of two dissimilar parallel unit repairable systems with failure during preventive maintenance. Manage. Sci. Lett. 6(4), 285-296.
[10] Kumar, A., Pant, S. & Singh, S. B. (2016). Reliability optimization of complex system by using cuckoos search algorithm, in Ram, M. and Davim, J.P. (Eds), Mathematical Concepts and Applications in Mechanical Engineering and Mechatronics. IGI Global Publisher, Hershey, PA, 95-112.
[11] Sadeghi, M. & Roghanian, E. (2017). Reliability analysis of a warm standby repairable system with two cases of imperfect switching mechanis. Sci. Iran. E, 24(2), 808-822.
[12] Kumar, A., Pant, S., Singh, S. B., (2017). Availability and cost analysis of an engineering system involving subsystems in series configuration. Int. J. Qual. Reliab. Manage. 34(6), 879-894
[13] Singh, V. V., Gulati, J., Rawal, D. K, & Goel, C. K., (2016). Performance analysis of complex system in series configuration under different failure and repair discipline using copula. Int. J. Reliab. Qual. Safety Eng. 23(2), 1650010.
[14] Singh, V. V., Poonia, P. K. & Abdullahi, A. F. (2020). Performance analysis of a complex repairable system with two subsystems in series configuration with an imperfect switch. Journal of Mathematical and Computational science, Journal of Mathematics & Computational Science. (JMCS). Vol. 10(2).pp. 359-383
[15] Kakkar, M., Chitkara, A. and Bhatti, J. (2015a). Reliability analysis of two unit parallel repairable industrial system", Decision Sci. Lett., 4(4), pp. 525-536.
[16] Kumar, A. and Malik, S. (2015). Reliability measures of a computer system with priority to PM over the H/W repair activities subject to MOT and MRT", Manage. Sci. Lett., 5(1), pp. 29-38.
[17] Niwas, R. & Kadyan, M.S. (2015) 'Reliability modeling of a maintained system with warranty and degradation', Journal of Reliability and Statistical Studies, Vol. 8, No. 1, pp.63-75.
[18] Garg, H. (2015). An approach for analyzing the reliability of industrial system using fuzzy Kolmogorov's differential equations, Arabian Journal for Science and Engineering, 40(3), 975987.
[19] Garg, H. (2014). Reliability, availability and maintainability analysis of industrial systems using PSO and fuzzy methodology, MAPAN, 29(2), 115-129.
[20] Pundir, P. S & Patawa, R. (2019). Stochastic behavior of dissimilar units cold standby system waiting for repair. Life Cycle Reliability and Safety Engineering, 8(1), 43-53.
[21] Yusuf, I and Bala, S.I. (2013). Analysis of reliability characteristics of a parallel system with external supporting devices for operation, International Journal of Information and Management Sciences, 24, 297-306.
[22] Yang, D. Y & Tsao, C. L. (2019). Reliability and availability analysis of standby systems with working vacations and retrial of failed components. Reliability Engineering & System Safety, 182, 46-55.
Received: July 23, 2020 Approved: September 20, 2020