Аннотация научной статьи по медицинским технологиям, автор научной работы — Tijjani A. Waziri, Ibrahim Yusuf

This paper investigated the properties of discrete scheduled replacement model of a series-parallel system, with six units. The six units of the system formed three subsystems, which are subsystems A, B and C. Subsystem A is having three parallel units, subsystem B is having a single unit and subsystem C is having two parallel units. It is assumed that, the repairable system is subjected to two categories of failures (Category I and Category II). The mathematical expressions for both reliability function and failure rates, and an elementary renewal theorem were used based on some assumptions in constructing the discrete scheduled replacement model for a seriesparallel system. A simple illustrative numerical example where made available, so as to study the properties of the replacement model constructed.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «On Discrete Scheduled Replacement Model of a Series-Parallel System»

On Discrete Scheduled Replacement Model of a Series-Parallel System

Tijjani A. Waziri

School of Continuing Education, Bayero University Kano, Nigeria [email protected] Ibrahim Yusuf

Department of Mathematical Sciences, Bayero University, Kano, Nigeria [email protected]

Abstract

This paper investigated the properties of discrete scheduled replacement model of a series-parallel system, with six units. The six units of the system formed three subsystems, which are subsystems A, B and C. Subsystem A is having three parallel units, subsystem B is having a single unit and subsystem C is having two parallel units. It is assumed that, the repairable system is subjected to two categories of failures (Category I and Category II). The mathematical expressions for both reliability function and failure rates, and an elementary renewal theorem were used based on some assumptions in constructing the discrete scheduled replacement model for a series- parallel system. A simple illustrative numerical example where made available, so as to study the properties of the replacement model constructed.

Keywords: category, discrete, replacement, scheduled, time

I. Introduction

Almost all systems deteriorate owing to age and usage, and experience stochastic failures during actual operation. Deterioration raises operating costs and produces less competitive goods. Moreover, consecutive failures are dangerous to the whole system, so timely preventive maintenance is beneficial for supporting normal and continuous system operation. But sometimes an operating systems cannot be replaced at the exact optimum times due to some reasons, such as : shortage of spare units, lack of money or workers, or inconvenience of time required to complete the replacement, but can be rather replaced in idle times, e.g., weekend, month-end, or year-end.

There is an extensive literature on preventive replacement models with their modified versions. Bris et al. [1] introduced a new approach for optimizing a complex system's maintenance strategy that respects a given reliability constraint. Chang [2] considered a device that faces two types of failures (repairable and non-repairable) based on a random mechanism. Coria et al. [3] proposed a method of analytical optimization for preventive maintenance policy with historical failure time data. Enogwe et al. [4] used the distribution of the probability of failure times and come up with a replacement model for items that fails un-notice. Fallahnezhad and Najafian [5] investigated the

number of spare parts and installations for a unit and parallel systems, so as cut down the average cost per unit time. Jain and Gupta [6] studied optimal replacement policy for a repairable system with multiple vacation and imperfect coverage. Lim et al. [7] studied the characteristics of some age substitution policies. Liu et al. [8] developed mathematical models of uncertain reliability of some multi-component systems. Malki et al. [9] analyzed age replacement policies of a parallel system with stochastic dependency. Murthy and Hwang [10] discussed that, the failures can be reduced (in a probabilistic sense) through effective maintenance actions, and such maintenance actions can occur either at discrete time instants or continuously over time. Nakagawa [11] modified the continuous standard age replacement for a unit, and come up with a discrete replacement model for the unit. Nakagawa et al. [12] explored the advantages of some replacement policies. Safaei et al. [13] investigated the optimal preventive maintenance action for a system based on some conditions. Sudheesh et al. [14] studied age replacement policy in discrete approach. Tsoukalas and Agrafiotis [15] presented a new replacement policy warrant for a system with correlated failure and usage time. Waziri et al. [16] presented some discounted age replacement models with discounting factor for a serial system exposed to two forms of failures. Waziri and Yusuf [17] presented an age replacement model for a parallel-series system based on some proposed policies. Xie et al. [18] assessed the effects of safety barriers on the prevention of cascading failures. Yaun and Xu [19] studies a cold standby repairable system with two different components and one repairman who can take multiple vacations, where they assumed that, if there is a component which fails and the repairman is on vacation, the failed component will wait for repair until the repairman is available. Yusuf and Ali [20] considered two parallel units in which both units operate simultaneously, and the system is subjected to two types of failures. Yusuf et al. [21] modified the standard age replacement model by introducing random working time Y in the model, for which the system is replaced at a planned time T, at a random working time Y, or at the first non-repairable type 2 failure whichever occurs first. Zaharaddeen and Bashir [22] developed a planned time replacement model for a unit exposed to two different forms of failures. Zhao et al. [23] gathered some recently proposed policies on planned time replacement decision.

This paper is organized in five sections. The present section described the introductory part. Section 2 described the system and its notations. Furthermore, section 2 contained some assumptions based on which, the author will develop the proposed replacement model. Section 3 discussed the proposed replacement model. Section 4 presents some numerical results. Section 5 presents the discussion of the results obtained from both examples 1 and 2. Finally, section 6 presents the summary, conclusion and recommendations.

Reliability measures namely reliability function and failure rates are used to obtain the expressions of discrete scheduled replacement model involving minimal repair based on some assumptions. A numerical example was given for the purpose of investigating the characteristics of the model constructed.

• r*(t): Category I failure rate of unit At of subsystem A, for i = 1,2,3.

• rb (t): Category II failure rate of subsystem B.

• (t): Category II failure rate of unit Q of subsystem C, for i = 1,2.

• Ri(t): reliability function of unit of subsystem A, for i = 1,2,3.

• Cb : cost of minimal repair of subsystem B due to Type II failure.

• Clm : cost of minimal repair of unit C$ of subsystem C due to Category II

II. Methods

III. Notations

failure.

• C2m : cost of minimal repair of unit C2 of subsystem C due to Category II failure.

• Cp : cost of scheduled replacement of the system at NT, for N = 1,2,3 ....

• Cr : cost of un-scheduled replacement of the system due to Category I failure.

• N*\ the system's optimum discrete scheduled replacement time.

IV. Description of the System

Consider a system comprising of three subsystems A, B and C in series. Subsystem A consist of three active parallel units, which are Alr A2 and A3. Subsystem B consist of a single active unit. While, subsystem C consist of two active units, which are C, and C2. The three units Alr A2 and A3 are all subjected to Category I failure, which is an un-repairable failure. Subsystem B is only subjected to Category II failure, which is repairable failure. Also, the two units C, and C2, are only subjected to Category II failure. The system fails due to Category I failure, if all the three units of subsystem A fails due to Category I failure, at such failure, the system is replaced completely. While the system fails due to Category II failure, if subsystem B or all the two units of subsystem C fails due to Category II failure, at such failure the system is minimally repaired. Figure 1 below is the diagram of the system.

Figure 1: Reliability block diagram of the system

V. Discrete Scheduled Replacement Model

This section considers a fundamental discrete scheduled replacement model involving minimal repair.

Assumptions for this model:

1. If subsystem B failed due to Category II failure, then the failed subsystem undergoes minor repair, and allow the system operating from where it stopped.

Tijjani A. Waziri, Ibrahim Yusuf

ON DISCRETE SCHEDULED REPLACEMENT MODEL RT&A, No 3 (63)

OF A SERIES-PARALLEL SYSTEM_Volume 16, September 2021

2. If all the two units of subsystem C failed due to Category II failure, then the failed units will undergoes minor repair, and allow the system operating from where it stopped.

3. The system is replaced completely at scheduled time NT(N = 1,2,3 ...) for a fixed T or where all the three units of subsystem A fails due to Category I failure, whichever arrives first.

4. The cost of scheduled replacement of the system is less than the cost of un-scheduled replacement.

5. Both Category I failure rate and Category II failures rate arrives according to a non-homogeneous Poisson process

6. The cost of minor repair, planned replacement and un-planned replacement are all positive numbers.

Based on the assumptions, the reliability function of component At with respect to Category I failure is

R*(T) = r'i(t)dt, for i = 1, 2, 3. (1)

Based on the assumptions, the reliability function of the system with respect to Category I failure is (NT) = 1 - (1 - Rl(NT))(1 - R&(NT))(1 - R*3(NT)), (2)

where N = 1,2,3 ... and T is fixed.

The cost of unscheduled replacement of the system in one replacement cycle is

Cr 71-RX (NT)), (3)

where N = 1,2,3 ... and T is fixed.

The cost of scheduled replacement of the system in one replacement cycle is

CpR*a(NT), (4)

where N = 1,2,3 ... and T is fixed.

The cost of minimal repair of subsystem B in one replacement cycle is

Jo"2 Cb rb (t)R*A(t)dt, (5)

where N = 1,2,3 ... and T is fixed.

The cost of minimal repair of unit C$ of subsystem C in one replacement cycle is

J1 Clmr$(t)R*A (t)dt, (6)

where N = 1,2,3 ... and T is fixed.

The cost of minimal repair of unit C& of subsystem C in one replacement cycle is

jf c2%r2(t)fl0 (Odt, (7)

where N = 1,2,3 ... and T is fixed.

Using equations (3) to (7), the replacement cost rate of the system in one replacement cycle is

Cr(l-fl& (1D)+Cpfl& (ir)+J0+# CbrbCt)R*A (t)dt+J0+# Clmr1(t)fl& (t)/t+J0+# C2mr2(t)fl& (t)dt

J0 ra (t)/t

Noting the following:

1. If the value of T is taking as one (that is , T = 1), then C(N) will be a continuous standard age replacement model with minimal repair.

2. C(N) is adopted as an objective function of an optimization problem, and the main goal is to obtain an optimal discrete scheduled replacement time N* that minimizes C(N).

VI. Numerical Example

In this section, we will give two numerical example, so as to illustrate the characteristics of the constructed discrete scheduled replacement model.

Let the rate of Category I failure of the three units of subsystem A follows Weibull distribution:

r*(t) = A* x* tKî-1, t>0, i = 1,2,3, (9)

where x*> 1.

Again, let the rate of Category II failure of subsystem B follows Weibull distribution:

rb(t)=Ab x# tKb-1, t>0 , (10)

where x# > 1.

Also, let the rate of Category II failure of the two units of subsystem C follows Weibull distribution: Tj (t)=Ai xi tK!-1, t>0, i = 1,2, (11)

where xi > 1.

Let the set of parameters and cost of repair/replacement be used throughout this particular example:

1. x# = 4, x2 = 3, x3 = 3.

2. Ab = 0.03, A2 = 0.002, A3 = 0.03.

3. x$=2, x*2=3,x)=4.

4. A\ = 0.0014, A*2 = 0.003, A) = 0.004.

5. Cr = 50, Cp = 40.

6. Cb = 3, C$m = 2 , C2% = 2.

Tijjani A. Waziri, Ibrahim Yusuf

ON DISCRETE SCHEDULED REPLACEMENT MODEL RT&A, No 3 (63) OF A SERIES-PARALLEL SYSTEM_Volume 16, September 2021

Consequently, by substituting the parameters in equations (9), we obtained the rate of Category I

failure of three units of subsystem A as follows below:

rl(t) = 0.0028t, (12)

r&(t) = 0.009t&, (13)

and

r)(t) = 0.016t3. (14)

Also by substituting the parameters in equation (10), we obtained the rate of Category II failure of subsystem B as follows:

rb(t) = 0.12t3. (15)

Also by substituting the parameters in equation (11), we obtained the rates of Category II failure of the two units of subsystem C as follows:

r2(t) = 0.006t2, (16)

and

r3(t) = 0.09t2. (17)

Table 1 below is obtained, by substituting the assumed cost of replacement/repair and failure rates of Category I, Category II and Category III failures obtained above (equations (12), (13), (14), (15), (16) and (17)) in equation (8), so as to evaluate the system's optimal discrete scheduled replacement time. When obtaining table 1, the value of T = 1, T = 2, T = 3, and T = 4 are considered so as to investigate the properties of the system's optimal discrete scheduled replacement time. Figure 2 is the graph of C(N) against N, as T = 1. Figure 3 is the graph of C(N) against N, as T = 2. Figure 4 is the graph of C(N) against N, as T = 3. Figure 5 is the graph of C(N) against N, as T = 4. Figure 6 is the graph comparing the values of C(N) against N, as T = 1,T = 2,T = 3 and T = 4.

Table 1: Values of C(N) for T = 1, T = 2, T = 3 and T = 4, versus N (1,2,3...).

N C(N) as T=1 C(N) as T=2 C(N) as T=3 C(N) as T=4

1 175.78 91.22 68.69 66.79

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

2 91.22 66.79 112.03 223.26

3 68.69 112.03 292.11 562.90

4 66.79 223.26 562.90 1089.46

5 80.61 369.52 944.26 1709.67

6 112.03 562.90 1395.91 2289.30

7 161.45 806.97 1863.78 2703.20

8 223.26 1089.46 2289.30 2874.25

9 292.11 1395.91 2620.56 2790.45

10 369.52 1709.67 2821.38 2497.61

11 459.33 2013.13 2876.24 2075.48

12 562.90 2289.30 2790.45 1609.72

13 679.30 2523.24 2586.36 1170.14

14 806.97 2703.20 2297.18 800.04

15 944.26 2821.38 1960.01 516.19

Figure 2: C(N) against N, as T=1

Figure 3: C(N) against N, as T=2

3500,00 3000,00 ___ 2500,00 <-> 2000,00 1500,00 1000,00 500,00 0,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 N

Figure 4: C(N) against N, as T=3

3500,00 3000,00 2500,00 u 2000,00 1500,00 1000,00 500,00 0,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

N

Figure 5: C(N) against N, as T=4

C(N)

■C(N)

Figure 6: Comparing C(N) as T=l, T=2, T=3 and T=4

Some observations from the results obtained are as follows

1. Observe table 1, the optimum discrete scheduled replacement time is 4, when 7 = 1, that is, N* = 4, with C(N* = 4) = 66.79, when 7 = 1. See figure 2 below for the plot of C(N) against N, as 7 = 1.

2. Observe table 1, the optimum discrete scheduled replacement time is 2, when 7 = 2, that is, N* = 2, with C(N* = 3) = 66.79, when 7 = 2. See figure 3 below for the plot of C(N) against T, as 7 = 2.

3. Observe table 1, the optimum discrete scheduled replacement time is 1, when 7 = 3, that is, N* = 1, with C(N* = 1) = 68.69, when 7 = 3. See figure 4 below for the plot of C(N) against T, as 7 = 3..

4. Observe table 1, the optimum discrete scheduled replacement time is 1, when 7 = 4, that is, N* = 1, with C(N* = 1) = 66.79, when 7 = 4. See figure 5 below for the plot of C(N) against T, as 7 = 4.

5. Observe figure 6, (C(N), 7 = 1) < (C(JV) , 7 = 2) < (C(N), 7 = 3) < (C(JV) , 7 = 4).

6. Observe figure 2 and figure 3, the graphs are in convex shape.

7. Observe figure 4, the graph is in s-shape.

8. Observe figure 5, the graph is in concave shape.

VII. Conclusion and Recommendations

This paper presented some properties of discrete scheduled replacement model involving minimal repairs. In trying to do that, it is assumed that a system is subjected to two categories of failures (Category I and Category II), such that, Category I is an un-repairable failure, while Category II is a repairable one. A numerical example was provided for simple illustrations. From the results obtained, it is discovered or verified that, the value of T have an effect on the discrete scheduled replacement model, because of the following reasons:

1. as the value of T decreases, the optimal discrete replacement time ( N*) increases, while as the value of T increases, the optimal discrete replacement time ( N*) decreases.

2. as the value of T increases, C(N) increases, while as the value of T decreases, C(N) increases decreases.

With such reasons above, it can be easily seen that, continuous scheduled replacement model (continuous age replacement model) is better than discrete scheduled replacement model (discrete age replacement model). This paper is important to engineers, maintenance managers and plant management in maintaining multi-component systems at idle times, such as weekend, month-end or year-end.

References

[1] Bris, R., Byczanski, P., Gono, R. and Rusek, S. (2017). Discrete maintenance optimization of complex multi-component systems. Reliability Engineering and System Safety, 168:80-89.

[2] Chang, C. (2014). Optimum preventive maintenance policies for systems subject to random working times, replacement and minimal repair. Computers and Industrial Engineering, 67:185-194.

[3] Coria, V. H., Maximov, S., Rivas-Davalos, F., Melchor, C. L. and Guardado, J. L. (2015). Analytical method for optimization of maintenance policy based on available system failure data. Reliability Engineering and System Safety, 135:55-63.

[4] Enogwe, S. U., Oruh, B. I. and Ekpenyong, E. J. (2018). A modified replacement model for items that fail suddenly with variable replacement costs. American Journal of Operations Research, 8:457-473.

[5] Fallahnezhad, M. S., Najafian, E. (2017). A model of preventive maintenance for parallel, series and single item replacement systems based on statistical analysis. Communications in Statistics-Simulation and Computation, 46:5846-5859.

[6] Jain, M. and Gupta, R. (2013). Optimal replacement policy for a repairable system with multiple vacations and imperfect fault coverage. Computers and Industrial Engineering, 66: 710-719.

[7] Lim, J. H., Qu, J. and Zuo, J. M. (2016). Age replacement policy based on imperfect repair with random probability. Reliability Engineering and System Safety, 149: 24-33.

[8] Liu, Y., Ma, Y., Qu, Z. and Li, X. (2018). Reliability mathematical models of repairable Systems with uncertain lifetimes and repair time. IEEE, 6: 71285-71295.

[9] Malki, Z., Ait, D. A. and Ouali, M. S. (2015). Age replacement policies for two-component systems with stochastic dependence. Journal of Quality in Maintenance Engineering, 20(3):346-357.

[10] Murthy, D. N. P. and Hwang, M. C. (2007). Optimal discrete and continuous maintenance policy for a complex unreliable machine International Journal of Systems Science, 6(1):35-52.

[11] Nakagawa T. Maintenance Theory of Reliability: Springer-Verlag, London Limited, 2005.

[12] Nakagawa, T., Chen, M. and Zhao, X. (2018). Note on history of age replacement policies. International Journal of Mathematical, Engineering and Management Sciences, 3(2): 151-161.

[13] Safaei, F., Ahmadi, J. and Balakrishnan, N. (2018). A repair and replacement policy for systems based on probability and mean of profits. Reliability Engineering and System Safety, 183: 143-152.

[14] Sudheesh, K. K, Asha, G. and Krishna, K. M. J. (2019). On the mean time to failure of an age-replacement model in discrete time. Communications in Statistics - Theory and Methods, 50 (11): 2569-2585.

[15] Tsoukalas, M. Z. and Agrafiotis, G. K. (2013). A new replacement warranty policy indexed by the product's correlated failure and usage time.Computers and Industrial Engineering, 66:203-211.

[16] Waziri, T. A., Yakasai, B. M. and Yusuf, I. (2019). On some discounted replacement models of a series system. Life Cycle Reliability and Safety Engineering, doi.org/10.1007/s41872- 01900101-3.

[17] Waziri, T. A. and Yusuf, I. (2020). On age replacement policy of system involving minimal repair. Reliability Theory and Application, 4(59): 54-62.

[18] Xie, L., Lundteigen, M. A. and Liu, Y. (2020). Reliability and barrier assessment of seriesparallel systems subject to cascading failures. Journal of Risk and Reliability, 00 (0): 1-15.

[19] Yuan, L. and Xu, J. (2011). An optimal replacement policy for a repairable system based on its repairman having vacations. Reliability Engineering and System Safety, 96:868-875.

[20] Yusuf, I. and Ali, U. A. (2012). Structural dependence replacement model for parallel system of two units. Nigerian Journal of Basic and Applied Science, 20(4): 324-326.

[21] Yusuf, B., Yusuf, I. and Yakasai, B. M. (2015). Minimal repair - replacement model for a system with two types of failure. Applied Mathematical Sciences, 138(9): 6867-6875.

[22] Zaharaddeen, H. A. and Bashir, M. Y. (2014). Minimal repair and replacement policy for a complex system with different failure modes of the groups. International Journal Applied of Mathematics, 3(4):416-421.

[23] Zhao, X., Al-Khalifa N. K., Hamouda, A. M. and Nakagawa, T. (2017). Age replacement models: a summary of new perspectives and methods. Reliability Engineering and System Safety, 161:95-105.

i Надоели баннеры? Вы всегда можете отключить рекламу.