Improving the efficiency of relay protection at a mining and processing plant Текст научной статьи по специальности «Электротехника, электронная техника, информационные технологии»

CC BY
141
70
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
mining and processing plant / relay protection / short circuit currents / setting / power supply system / failures

Аннотация научной статьи по электротехнике, электронной технике, информационным технологиям, автор научной работы — Roman V. Klyuev, Igor I. Bosikov, Oksana А. Gavrina

The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its instal-lation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Improving the efficiency of relay protection at a mining and processing plant»

UDC 621.311

Improving the efficiency of relay protection at a mining and processing plant

Roman V. KLYUEV1 H, Igor I. BOSIKOV2, Oksana A. GAVRINA2

1Moscow Polytechnic University, Moscow, Russia

2 North Caucasian Mining and Metallurgical Institute (State Technological University), Vladikavkaz, Russia

How to cite this article: Klyuev R.V., Bosikov I.I., Gavrina O.A. Improving the efficiency of relay protection at a mining and processing plant. Journal of Mining Institute. 2021. Vol. 248, p. 300-311. DOI: 10.31897/PMI.2021.2.14

Abstract. The paper presents the results of constructing effective relay protection in the power supply system of a mining and processing plant (MPP). A brief description of the MPP is given, the power supply and substitution circuits used to calculate the short-circuit currents are given. A statistical analysis of failures in the electric network of the MPP has been carried out, which makes it possible to draw conclusions about the nature of failures ranges. Analysis of the registered faults shows that a significant part of them are line-to-earth faults, which in most cases turn into multiphase short circuits, which are interrupted by overcurrent protection. In order to improve the efficiency and reliability of the relay protection, the power supply scheme of the MPP was refined and analyzed. The calculation of the short-circuit currents was made, which made it possible to calculate the settings of the relay protection and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers. To reduce the number of failures to the cable insert on the line leaving the administrative and household complex (AHC), and to increase the reliability of power supply to consumers, it is advisable to divide the capacities of the existing 10 kV line into two parallel ones by laying a second line. It is recommended to install a current cut-off on the line outgoing to the AHC, the feasibility of the installation of which was shown by calculations. This will reduce the chance of failures to the cable gland. Data on the setting currents of overcurrent protection and current cut-off are given on the selectivity card.

Key words: mining and processing plant; relay protection; short circuit currents; setting; power supply system; failures

Introduction. Increasing the efficiency of enterprises is possible only with the correct use of scientific and technical solutions for the operation and optimal operating modes of the power supply system (PSS). The correct choice of relay protection devices and their adjustment, leading to an increase in the selectivity and reliability of its operation, is important for the optimal operating mode of the PSS. When the load of consumers changes, the PSS operation mode becomes different, therefore, it is necessary to assess the effect of the load on losses in the PSS.

Formulation of problem. One of the most important tasks for PSS of mining and processing plants is to ensure the effective functioning of relay protection and automation systems. This is necessary to reduce the negative effect of possible failures and abnormal modes caused by short circuits. To solve this problem, for one of the largest mining and processing enterprises of the Russian Federation, an effective relay protection was built on the basis of comprehensive research. The implementation of the recommendations proposed in the work will improve the reliability and efficiency of relay protection in the PSS of the MPP and get the corresponding economic effect.

Brief description of the MPP. Power supply to consumers with a 10 kV voltage of the MPP is carried out from the buses of the 10 kV substation "Promploshchadka" and from the central distribution substation: CDS-10 kV from two bus sections operating separately by feeders feeding the lines to the administrative and household plant (AHC) (Fig. 1); to the substation "Khrustalnaya"; to a transformer substation (TSS-9); from the 3rd cell of the outer switchgear complex (OSC-10 kV). For example, in Fig. 1 the diagram of the MPP power supply with the supply lines to the AHC is shown, the rest of the diagrams are not presented in the work.

Outgoing lines are made by overhead and cable power lines (mixed), which can be seen from the power supply schemes. The cross-section of overhead lines fluctuates in insignificant limits: AS-95 - AS-50 (A-50). Cross-sections of cable lines - from 50 to 240 mm 2 brands AAShV and ASB. The lengths of the sections of cable and overhead lines vary over a very wide range, depending

Ki

From cell 15

320 kVA

Ki

^ AS 70 <K 250 kVA

dD Dispensary

630 kVA

ahc GD-

Á

60 *

K6

A-50

400

j 400 kVA Ki < A-50 ^ 500

K9

<

Output to AHC From cell 3 .

185

SU-1

AAShV-3xl85 A.50

50

60

320 kVA

;K2 A-50 K3y

MV

Ir.oper = 18 A

t — 0,6 c Ic.cc = 75 A tc.cc — 0 S

80

/

A-50

Ki3

L

£

i500

v

<

G3-

630 kVA

Ki

A-50

Workshops

400kVA

4-QDclub

A

Kl2 i

-J Kazreti

r-*" w Village -s

GSPTU ^(Kn400kVA

Second step-up

-QD

MVi

/r.oper — 17 A U = 0 s

iKl4

(4 trans.) TBalichi

GSTU K

300 K4 400 kVA 400 kVA 400 kVA 100 kvA~

Pj 160 kVA/Oj 400 kVA Concrete REU plant PMK

Fig.1. Power supply diagram of the MPP with power lines to the AHC

250 kVA

on the distance of electrical receivers, substations and on the availability of materials at the time of their construction. The number of power consumers, i.e. the number of transformer substations on each line is very significant (up to 19-20). Capacities range are from 100 to 630 kVA.

Statistical analysis of failures in the electric grid of the MPP. Statistical material allows us to draw some conclusions about the nature of the failures distribution for the specified period [8, 21]. A total of 120 failures were registered, of which 58, i.e. about 50 %, falls on the feeder, outgoing from cells 3 and 15 of the substation "Promploshchadka", which is significant for a small site with a large number of connected substations. The registration of damages is given in the log of the main step-down substation (MSDS) based on the operation of the overcurrent protection (OCP), current cut-off (CC) from short-circuit currents, as well as during the operation of the ground protection alarm.

Analysis shows that a significant part of the faults are single-phase earth faults, which in most cases turn into multi-phase short circuits, which are disconnected by overcurrent protection [9, 18]. The analysis graphs of the number of failures for the specified period (Fig.2) illustrate the majority of failures along the feeder at the AHC, which fall on January, April, May and December 2017, 2018 and partially 2019. The feeder of cell 3 to the tailings facility (Fig.3) illustrates the amount of failure, most of which occurs in February, April, May 2017, June 2018 and August 2019.

A large number of registered failures are determined by insufficient preventive measures and a small amount of precipitation over the specified period.

The causes of failures to electrical installations depend on many factors and are varied in nature. However, from the electrical equipment downtime log, in almost all cases, the cause of failure and disconnection of elements is unclear, it only indicates which protection disables the failure. Failures can be divided into the following types: cable breakdown, failure to the insulators of the overhead line, breakage of the overhead power line, mechanical damage, damage to the supply line (short circuit on the line, overwhelming wires). It is advisable, after finding out the type of failure, to make an entry in the downtime log of electrical equipment about its cause [2, 4, 14].

§ Ph

i ii iii iv v vi vn vni ix x xi xii Months — 2017 — 2018 2019

Fig.2. The number of damages along the feeder at the AHC for certain months of 2017-2019

§

-E2 2 g

fc 1

ii hi iv v vi vn vm ix x xi xn Months —2017 2018 2019

Fig.3. The number of damages along the feeder of cell 3 on tailings facility for certain months of2017-2019

Thus, the main novelty of the work is the identification of failure caused by short-circuit currents.

Analysis of failures in the power grid of the MPP. To reduce the absolute number of faults in the 10 kV electrical network, the overall level of its operation should be increased. Special care is required to carry out preventive measures before spring and in winter, when the maximum damage occurs. It is necessary to pay attention to carrying out preventive maintenance in the middle and at the end of the week, since the bulk of the damage occurs during this period. Since it is impossible to assess the damage from the electrical equipment downtime log, it is advisable for the substation duty personnel to find out the reason for the protection operation and note it in the failure log. This is necessary for targeted preventive work to reduce certain types of failure.

Calculation of relay protection in electric networks of MPP. In recent years, the power consumption in industry has been increasing, which entails an increase in the capacity of transformers and the length of power transmission lines. An example is the Madneupol Mining and Processing Plant (MMPP) [7, 17].

The main step-down substation of MMPP supplies power to the main and auxiliary subdivisions. The main divisions include an open pit mine and a concentrator [3]. Auxiliary, but very responsible electricity consumers are an urban-type settlement, a workshop for special garages, a concrete center, a club, a dispensary, as well as neighboring villages, which are powered by power lines from the MMPP MSDS.

The most important indicators of the normal operation of these electrical receivers are uninterrupted power supply and reliability. This does not always correspond to the specified requirement, since the electrical network has significant ramification, and relay protection and automation do not work clearly and reliably enough [20, 23]. The consequence is non-selective disconnection of many electrical consumers, undersupply of electricity and, thus, downtime of electrical equipment. This, in turn, worsens the technical and economic indicators of the work of many units and harms the population and personnel servicing the main and auxiliary production. It is necessary to rationalize, improve the efficiency and reliability of relay protection and automation in the electrical networks of MMPP [16, 19, 22].

Using the refined power supply scheme, the short circuit currents were calculated, which made it possible, having the numerical values of the short circuit currents, to calculate the relay protection settings and give recommendations on the place of its installation and adjustment in order to ensure the normal operation of electricity consumers [12, 13].

The paper presents a method for calculating short-circuit currents in the PSS of the MPP and on its basis an analysis of the relay protection of outgoing cable lines is carried out. Similar results for calculating the parameters of relay protection were obtained for other consumers of electricity at the mine, but due to the limited scope of work, they were not presented.

6

7

6

5

5

4

4

3

2

1

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

0

0

Ki2

) 0,188; 0,024

I

K7

0,069; 0,012 __

t

0,276; 0,0048 _rm_

4,

4

7

12

/

0,094^01)14

Ks

0,23; 0,04 6

0,256; 0,032 0,128; 0,016 7 0,23; 0,04 _r>r>rs_rv>r\_Jt_rYY\.

U-

K5

10

/

K,

0,018, 0,0088 _rm

u

k2

0,05, 0,0064

Kc

/

11

0,027; 0,008

.4

Kin

_3_

0,188; 0,024

kL

0,128; 0,016 14_

0,96; 0,12 _rwS_

1

15

0,0276; 0,0048 _

K13

/

K1,

16

0,92; 0,16

K,

V

Fig.4. Equivalent circuit indicating the active and inductive resistance of the line outgoing from cell 3, 15 on the AHC

Method for calculating short-circuit currents in the power supply system of MMPP with voltage above 1000 V. To calculate the short-circuit currents, computational schemes and corresponding equivalent circuits for the lines emanating from the 0SC-10 kV cells of the MSDS, the 10 kV "Promploshchaka" substation and the CPDS are drawn up. The equivalent circuit for the circuit shown in Fig.1 is shown in Fig.4.

The calculation uses the method of approximate reduction, in which the voltage at all stages of transformation is taken to be equal to the average Uav.

To calculate the short-circuit current downstream of the transformer, you need to know the short-circuit power. To determine the short-circuit power behind the MSDS power transformer, we use the formula

5 - 5 • 100

sc t.nom '

(1)

where 5t.nom - nominal power of the transformer, kVA; usc - short-circuit voltage as a percentage of nominal voltage Unom.

A three-winding power transformer of TDTN-25/110 type with usc = 10.5 kV is installed at the MSDSfor winding with voltage of 10.5 kV,

Ssc - 25000-

100 10,5

- 238095 kVA.

Short-circuit current on the 10.5 kV side of the transformer at the point K1:

1 sc1 -

S-u.

(2)

av2

where Uav2 - assumed value of the average voltage downstream of the transformer on the 10 kV side,

1 sc 1 -

238095

S • 11

-12500 A.

8

9

6

5

1

2

According to the specified and refined power supply scheme of the MMPP, a calculated equivalent circuit is drawn up, taking into account the fact that when calculating short-circuit currents, it is necessary to take into account the active resistance, provided that the ratio r/x > 1/3.

The system resistance is determined based on the calculated value of the short-circuit current downstream of the transformer on the 10.5 kV side: Zs Xs 0.508 Ohm.

Active and inductive resistances (r and x) of cable and overhead lines are determined from the following considerations:

• the inductive resistance of the cable is calculated on the basis that xo = 0.08 Ohm/km is the specific resistance of 1 km of the line, depending on the type of line, the material of the wires, the method of performing power lines with a voltage of 10.5 kV;

• the active resistance of the line is determined by the well-known expression, which includes the conductivity of the cable lines and the cross-section of the line under consideration;

• inductive resistance of overhead lines is calculated for cable lines, data on specific resistance per 1 km of line are taken from reference data.

The calculation of three- and two-phase short-circuit currents is carried out according to the formulas:

r(3) = Uav

Jsc "V3. *

s

J (2) = J (3) sc sc 2 '

(3)

(4)

where Zres - the resulting value of the resistance of the short circuit (from the power supply to the short circuit point), zres = -J(xres)2 + (rres)2 ; sum of inductive resistances of line sections to the point

n

of short circuit xres = ^ x = x1 + x2 +... + xn ; the sum of the active resistances of the line sections to

the point of short circuit rres = ^r = r1 + r2 +... + rn .

i

Since, according to the condition, r/x > 1/3, the active resistance rres must be taken into account when calculating the short-circuit currents.

According to the formulas given, the values of the currents of three- and two-phase short circuits are calculated. The equivalent circuit, which indicates the values of the resistances of the network elements, the calculation of which must be made, is shown in Fig.4. The results of calculating the currents of three- and two-phase short circuits are summarized in Table 1.

Table 1

Data for calculating short-circuit currents and the magnitude of the currents of three- and two-phase short circuits of the line outgoing from cells 3 and 15 at the AHC

Short-circuit point Tres, Ohm xres, Ohm Zres, Ohm /sc(3), A Isc(2), A

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Ki — 0.508 0.508 i250i i0826

K2 0.0i8 0.5i68 0.5i7i i228i i0635

K3 0.068 0.5232 0.5276 i2037 i0424

K4 0.256 0.5472 0.604i i05i2 9i03

K5 0.35 0.56i2 0.66i4 9602 83i5

K6 0.734 0.6092 0.9538 6658 5765

K7 i.033 0.66i2 i .2264 5i78 4484

K8 0.99i6 0.654 i.i878 5346 4630

K9 0.67 0.60i2 0.900i 7055 6ii0

Ki0 0.697 0.6092 0.9257 6860 594i

Kii 0.798 0.6i72 i.0088 6295 5452

Ki2 0.986 0.64i2 i.i76i 5399 4676

Ki3 i .63 0.72i2 i.7824 3563 3085

Ki4 i.6576 0.726 i.8096 3509 3039

Ki5 2.5776 0.886 2.7256 2330

1

A selectivity map for the operation of overcurrent protections in the 10 kV electrical network of MMPP is being drawn up. In accordance with the PUE, on single lines with one-way power supply from multiphase faults, a two-stage current protection should be installed, the first stage of which is made in the form of a current cutoff, and the second - overcurrent protection with an independent or dependent time delay characteristic.

Since the mixed cable-air network with a voltage of 10 kV MMPP is an open radial network with one-way power supply, it is provided for the installation and calculation of OCP (overcurrent protection) and MS. The selectivity map of relay protection is drawn up in the following sequence:

• the equivalent circuit of the electric network for each of the lines discussed above is drawn up;

• resistances of individual elements of the circuit are determined in accordance with the brand, section and length of the lines;

• currents of three- and two-phase short circuits are calculated at separate points of the network;

• protection operation currents are determined at the points of connection of step-down substations and on each outgoing line at the places of protection installation;

• the sensitivity coefficient ksens is determined;

• time delays of OCP are set.

Using the data on the calculation of three- and two-phase short-circuit currents for individual outgoing radial lines, the operating current is calculated and the selected protection is checked for sensitivity. The operating current of the overcurrent protection is determined by the formula

T _ ^safety^ss j ( .

I o.c = j I oper.max, (5)

Kr

where ksafety = 1.1-1.2 - safety factor; kss - self-start ratio; /oper. max - maximum operating current (rated current of consumers), A; kr - return rate, kr = 0.6-0.7 - for RTM type relays, kr = 0.8-0.85 - for relay type RS40.

Relay operating current

I = Ksch I oc (6)

r.oper j

nct

where ksch - circuit coefficient equal to 1 when two relays are turned on for phase currents according to incomplete Y scheme and equal to V3 when one relay is turned on for the difference in currents of two phases; nct - current transformer ratio. Sensitivity factor

I I(2)

l _ scc.min _ scc (7)

Ksens = , = T , (7)

I n I

r.oper ct o.c

where I iJ = /scc.min - two-phase short-circuit current at the end of the protected zone.

In accordance with the PUE(electrical installation rules) ksens > 1.5 - in case of a short circuit at the end of the protected area, ksens > 1.2 - with a short circuit at the end of an adjacent section, with the operation of overcurrent protection as a backup protection and for current cutoffs performed as backup.

The calculation of the current cut-off operation will be made according to the formula

1 o.c = Kbeg 7s.c.outmax' (8)

where kbeg = 1.2-1.4; Is(:c)out.max - three-phase short-circuit current at the beginning of the adjacent section.

Let us calculate the relay protection of outgoing lines. Line - exit to the AHC from cells 3 and 15 (see Fig.1).

• An OCP is installed on the line under consideration at MV1 (next to the "2nd step-up" substation). We consider the maximum load /opermax according to the rated power of the connected transformers to the outgoing line for MV1 (see Fig. 1). Determine the operating current for MV1 by the expression (5):

12 • 2 5

I o c =1-- • 46. 7 = 164. 8 A,

o . c 0 . 85

where

S ^nom .t

850

I = _J_=_

OPermaX S •Unom V3 10.5

= 46.7 A.

Relay operating current by expression (6):

1-164.8

I

r.oper

10

= 16.4 A.

For the installation, we select an electromagnetic microprocessor relay of the PC40/20 type with an operating current of 17 A.

Checking the protection sensitivity by expression (7):

_ 2017

"sens _- _ 11.8 .

17 -10

We get ksens > 1.5, i.e. protection is quite sensitive to short-circuit current at the beginning of the coverage area (at point K15).

The operation of networks with a voltage of 10 kV of outgoing lines from DSS-10 showed that in the section of the outgoing line at the AHC, when short-circuit currents of 10-12 kA flow, the cable insert at the beginning of the specified line fails very often. This leads to the blackout of a large number of consumers, including the village of Kazreti, which is powered by this line [1, 5, 11]. The reason is the large value of the flowing short-circuit current and the long time of the relay protection acting on the current interruption [6, 10, 15]. To reduce the damage to the cable insert and increase the reliability of power supply to consumers, it would be advisable to divide the specified line into two parallel ones. To do this, you will need to operate separately cells 3 and 15 of the 10 kV substation "Promploschadka", install 11 supports and lay 450 m of wires with a cross-section of A-50.

The short-circuit current limitation can be achieved by installing a reactor of the RB-10-630-0.25 type. This will increase the reliability of the oil circuit breakers during shutdown, the calculated values of the resistance of the short-circuit scheme and currents after the installation of the RB-10-630-0.25 type reactor are given in Table 2.

Table 2

Active and inductive resistances for calculating short-circuit currents and currents three- and two-phase short circuits of the line outgoing from cells 3 and 15 at the AHC taking into account the resistance of the linear reactor

Short-circuit point. rres, Ohm xres, Ohm Zres, Ohm -lsc(2), A

Ki - 0.758 0.758 8378 7255

K2 0.0180 0.7704 0.7706 8241 7137

K3 0.068 0.7768 0.7797 8145 7053

K4 0.256 0.8008 0.844 7524 6516

K5 0.35 0.8148 0.8867 7162 6202

K6 0.734 0.8628 1.1327 5606 4856

K7 1.033 0.9148 1.3798 4602 3986

K8 0.9916 0.9076 1.3442 4724 4091

K9 0.67 0.8548 1.086 5847 5064

K10 0.697 0.8628 1.1091 5726 4959

K11 0.798 0.8708 1.1811 5377 4657

K12 0.986 0.8948 1.3314 4770 4130

K13 1.6576 0.9448 1.8992 3343 2896

K14 1.6576 0.94 1.9055 3333 2886

K15 2.5776 1.1 2.8025 2266 1963

From Table 2 it follows that the installation of the reactor will significantly reduce short-circuit currents and increase the reliability of the power supply system of MMPP. Therefore, it seems appropriate to submit an application for the preparation of this reactor. However, in the absence of the possibility of installing the reactor at the present time, it is proposed to increase the speed of the existing OCP, which has a time delay. For this purpose, it is recommended to install a current cut-off on the feeder outgoing to the AHC.

Let us determine the sensitivity coefficient for OCP on the MVi oil circuit breaker after the possible installation of the reactor (taking into account the calculated short-circuit currents in Table 3) according to the expression (7):

t = 1963 =11 c

en( 10 • 17 .

It is obvious that after the installation of the reactor, the sensitivity of the protection remains very high and, therefore, will work quite well.

• We calculate OCP on the oil switch MBcdss at the beginning of the outgoing line to the AHC (cell 3 or 15). Similarly to the previous calculation, we consider that the maximum operating current will correspond to the current In = Inom.max = 300 A.

Determine the operating current of the overcurrent protection by the expression (5):

1.2 • 2.5 0.85

The relay operating current will be equal to the formula (6):

_ 1 • 1058 c \

I r oner — — 17.6 A.

p 60

The installation accepts a relay of the PC40/20 type for a current value of 20 A with Ir.oper = 18 A. Let us determine the sensitivity coefficient before installing the reactor by the expression (7):

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Io.c ='.__' • 300 = 1058A.

3085 _

ksens =-= 2.86 .

18 • 60

After installing the reactor

2896 „ _

k(en( —-= 268.

18 • 60

Thus, the overcurrent protection will be sensitive both before and after the installation of the reactor.

• Let's calculate the current cutoff actuation on the line outgoing to the AHC from cell 3 or 15 for MBcdss. The calculation is carried out according to the formula (8). Before installing the reactor:

Io.c.cc = kbeg1s(c3c)(sc13)max = 13 3563 = 4631.9 A

T — 1 o.c.cc 46319 — 77 9 A Ir.oper.cc -—- — //.2 A.

«ct 60

It is accepted for installation of a relay of the PC40/100 type with Ir.oper = 80 A. The sensitivity coefficient is determined by the expression (7):

, 1((c2c)((c1) 10826 k(en( —--—- —-— 2.26.

(en( Ir.oper«ct 80 • 60

Current cutoff is sensitive because ksens > 2.

a he, kA

12 -10 -T 8.0 -6.0 -

2.0

Isc, kA

43)= 12501 A

£) = 10826 A

;(2)

/(3)

- p)

l(3) > loper

/all

—\-1-40.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5

/, km

0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5.

Fig.5. Graphical definition of the current cut off working area: a - /Pper - working area with two-phase short closure (73.8 % /all); /Oper - working area with three-phase short circuit (81.2 % /all); b - lOp^ - 54,4 %-/ali; loper - 65.8 %-/all; /dz - current cut off dead zone

L km

After installing the reactor:

Io.c.cc = ^beg^scc(sc 13)max = 1-3 • 3343 = 4345.9 A;

I 4345 9

Ir.oper.cc = — = = 72.43 A.

n

ct

60

Accepted for installation of a relay type PC40/100 with Is.c = 75 A. The sensitivity coefficient is determined by the expression (7):

^ _ IscC(sci) _ 7255 y

SenS Ir.opernct 75 •60 .

The efficiency of the current cutoff after the installation of the reactor decreased to a value of ksens = 1.7. However, in accordance with the PUE for current cutoffs without time delay,

DZ

DZ

b

installed on the lines and performing the functions of additional protections, the sensitivity coefficient should be about 1.2 for a short circuit at the protection installation site in the most favorable mode according to the sensitivity condition.

The efficiency of the current cutoff for the line under consideration is determined graphically for two modes: before the installation of the reactor (Fig.5, a); after installing the reactor (Fig.5, b).

Figure 5 shows that the minimum value of the current cutoff working zone is 54 % of the length of the entire line, i.e. the cutoff is effective in both cases (with and without a reactor).

The response time of the protections on the line under consideration is indicated in Fig. 1 and in Table 3 of the construction of the selectivity map, where the protection settings are indicated for the primary and secondary current Is.c u Ir.oper.

Table 3

Selectivity map of relay protection when power consumers are supplied from 10 kV radial lines

Protection Protection type Current relaytype

Outgoingline installation place kcx ^■q.C., A ntt 1r.oper, A k ksens t, s Note

MV1 OCP CR-40/20 1 170 50/5 17 11.8 0

OCP CR-40/20 1 1080 300/5 18 2.8 0,6

From cells 3, 15 to AHC MVcdss 4800 80 2.26 Beforeinstallation

CC CR-40/100 1 4500 300/5 75 1.7 0 reactor Afterinstallingthereactor

From cell 14 output N 2 MV2 OCP CR-40/50 1 520 100/5 26 6.5 0 loper.max = 146.2 A

to CMM MVcmm OCP CR-40/50 1 760 100/5 38 13.7 0,6 loper.max = 215.5 A

From cell 4, output N 1 to ZHZB MV2 MVzhzb OCP OCP CC CR-40/50 CR-40/20 CR-40/100 1 1 1 520 900 6000 100/5 300/5 300/5 26 15 100 6.5 5.6 1.78 0 0,6 0 loper.max = 146.2 A

From cell 15 input to TSS-9 MV2 MV1 MVCDSS OCP OCP OCP CRM CRV CR-40/20 1 1 1 480 750 1020 150/5 150/5 300/5 16 25 17 3.6 2.9 7.8 0 0,6 1,1

Output from the 3rd cell of KRUN 10 kV MVkrun OCP CR-40/50 1 720 150/5 24 3.5 0 loper.max = 218.8A

For all other substations of the MPP, similar calculations were performed using the above method.

Conclusion

1. To reduce the amount of damage to the cable insert on the line outgoing to the AHC, and to increase the reliability of power supply to consumers, it is advisable to divide the power of the existing 10 kV line into two parallel ones by laying a second line. To do this, you will need to use cells 3 and 15 separately, install 11 supports and lay 450 m of wires with a cross section of A-50.

2. The limitation of the short-circuit current can be achieved by setting the RB-10-630-0.25 type. This will increase the reliability of the oil circuit breakers when disconnecting short-circuit currents (the calculated values of the circuit resistances and short-circuit currents before and after the installation of the RB-10-630-0.25 type reactor are given in Tables 1 and 2).

3. It is recommended to install a current cut-off on the line outgoing to the AHC, the expediency of the installation of which has been shown by calculations. This will reduce the likelihood of damage to the cable insert. The data on the currents of the OCP and CC setting are given on the selectivity map (Table 3).

4. It is recommended to set the minimum operating time of relay protection on outgoing lines.

5. On the outgoing line from cell 14, output N 2 to the CMM at the installation site MB2 to install current transformers 150/5 on In = 150 A instead of the existing 100/5, since loper.max 146.2 A.

At the MBcmm installation site it is necessary to replace the existing current transformers with №rr = 100/5 to TT with ftTT = 250/5, as /oper.max = 215.5 A.

6. It is necessary to install a current transformer with n-i = 250/5, as Ioper.max _ 218.8 A, on the outgoing line "output from the 3rd cell of KRUN-10 kV" instead of the existing current transformers with n-ir = 150/5.

7. The solution to the problem of constructing an effective relay protection at a MPP in this work consists in the development of a method for calculating short-circuit currents in PSS for the conditions of enterprises in mountainous areas with the calculation for a specific MPP. The developed methodology and the results obtained can be used at similar enterprises.

REFERENCES

1. Abramovich B.N. Uninterruptible power supply system for mining industry enterprises. Journal of Mining Institute. 2018. Vol. 229, p. 31-40. DOI: 10.25515/PMI.2018.1.31

2. Klyuev R.V., Bosikov I.I., Gavrina O.A., Krysanov K.S. Analysis of the state of insulation of electrical equipment of mining and metallurgical companies. News of the Tula states university-sciences of earth. 2020. Vol. 2, p. 201-215 (in Russian).

3. Golik V.I., Razorenov Yu.I., Karginov K.G. Mining industry - the basis for sustainable development of north Ossetia-Alania. Sustainable development of mountain territories. 2017. Vol. 9. N 2(32), p. 163-172. DOI: 10.21177/1998-4502-2017-9- 2-163-171 (in Russian).

4. Klyuev R.V., Bosikov I.I., Mayer A.V., Gavrina O.A. Comprehensive analysis of the effective technologies application to increase sustainable development of the natural-technical system. Sustainable Development of Mountain Territories. 2020. Vol. 12. N 2(44), p. 283-290. DOI: 10.21177/1998-4502-2020-12-2-283-290 (in Russian).

5. Vasilev B.Yu., Shpenst V.A., Kalashnikov O.V., Ulyanov G.N. Providing energy decoupling of electric drive and electric grids for industrial electrical installations. Journal of Mining Institute. 2018. Vol. 229, p. 41-49. DOI: 10.25515/PMI.2018.1.41

6. Pirog S., Shklyarskiy Y.E., Skamyin A.N. Non-linear Electrical Load Location Identification. Journal of Mining Institute. 2019. Vol. 237, p. 317-321. DOI: 10.31897/PMI.2019.3.317

7. Galachieva S.V., Sokolov A.A., Sokolova O.A., Makhosheva S.A. Estimation system of sustainable development of regional national-economic complexes of mountain territories. Sustainable development of mountain territories. 2018. Vol. 10. N 3(37), p. 329-335. DOI: 10.21177/1998-4502-2018-10- 3-329-335 (in Russian).

8. Rui L., Nan P., Zhi Y., Zare F. A novel single-phase-to-earth fault location method for distribution network based on zero-sequence components distribution characteristics. International Journal of Electrical Power & Energy Systems. 2018. Vol. 102, p. 11-22. DOI: 10.1016/j.ijepes.2018.04.015

9. Ahmed E.S. Parameter less earth fault locator algorithm based on transient surges resulting from single-pole breaker opening. Ain Shams Engineering Journal. 2018. Vol. 9. Iss. 4, p. 2609-2616. DOI: 10.1016/j.asej.2017.08.002

10. Kazanin O., Sidorenko A., Koteleva N., Belova D. An assessment of the impact of longwall panel width on the height of complete groundwater drainage in underground thick coal seam mining. Test Engineering and Management. 2020. Vol. 83, p. 5568-5572.

11. Shklyarskiy Y., Skamyin A., Vladimirov I., Gazizov F. Distortion load identification based on the application of compensating devices. Energies. 2020. Vol. 13. Iss. 6. N 1430. DOI: 10.3390/en13061430

12. Vázquez E., Zamora-Mendez A., Arrieta Paternina M. et al. Dynamic phasor-driven digital distance relays protection. Electric Power Systems Research. 2020. Vol. 184. N 106316. DOI: 10.1016/j.epsr.2020.106316

13. Eissa M. Developing Busbar protection with new differential characteristics to solve the breakpoint settings of digital commercial relays. International Journal of Electrical Power & Energy Systems. 2018. Vol. 98, p. 1-10. DOI: 10.1016/j.ijepes.2017.11.006

14. Klyuev R., Bosikov I., Gavrina O., Madaeva M., Sokolov A. Improving the energy efficiency of technological equipment at mining enterprises. Advances in Intelligent Systems and Computing: International Scientific Conference Energy Management of Municipal Facilities and Sustainable Energy Technologies (EMMFT'19), 10-13 December 2019, Voronezh, Russia. Springer, 2021. Vol. 1258, p. 262-271. DOI: 10.1007/978-3-030-57450-5_24

15. Litvinenko V.S. Digital Economy as a Factor in the Technological Development of the Mineral Sector. Natural Resources Research. 2020. Vol. 29, p. 1521-1541. DOI: 10.1007/s11053-019-09568-4

16. Momesso A., Bernardes W., Asada E. Fuzzy adaptive setting for time-current-voltage based overcurrent relays in distribution systems. International Journal of Electrical Power & Energy Systems. 2019. Vol. 108, p. 135-144. DOI: 10.1016/j.ijepes.2018.12.035

17. Petrov Yu.S., SokolovA.A. Increase of effective management of technological processes of the mountain enterprise on the basis of the analysis of information on technogenic cycles. 2nd International Conference on Industrial Engineering, Applications and Manufacturing (ICIEAM), 19-20 May 2016, Chelyabinsk, Russia. IEEE, 2016, p. 1-5. DOI: 10.1109/ICIEAM.2016.7911691

18. Xiao D., He T., Xiao R., Du X. Segment location for single-phase-to-ground fault in neutral non-effectively grounded system based on distributed electric-field measurement. Electric Power Systems Research. 2020. Vol. 184. Iss. 4, p. 106321. DOI: 10.1016/j.epsr.2020.106321

19. Sudhakar P., Malaji S., Sarvesh B. Reducing the impact of DG on distribution networks protection with reverse power relay. Materials Today: Proceedings. 2018. Vol. 5. Iss. 1. Part 1, p. 51-57. DOI: 10.1016/j.matpr.2017.11.052

20. Zhukovskiy Yu.L., Korolev N.A., Babanova I.S., Boikov A.V. The probability estimate of the defects of the asynchronous motors based on the complex method of diagnostics. Innovations and prospects of development of mining machinery and electrical engineering, 23-24 March 2017, Saint Petersburg, Russia. IOP Conference Series: Earth and Environmental Science, 2017. Vol. 87. Iss. 3. N 032055. DOI: 10.1088/1755-1315/87/3/032055

21. Bikic K.C., Gazdovic M., Kelemen F., Lojpur A. Transferred Voltages due to Single Phase Earth Fault on Power Transformers. ProcediaEngineering. 2017. Vol. 202, p. 305-311. DOI: 10.1016/j.proeng.2017.09.718

22. Ukil A., Yeap Y., Satpathi K. Power systems frequency estimation using amplitude tracking square wave for low-end protective relays. Measurement. 2019. Vol. 141, p. 70-84. DOI: 10.1016/j.measurement.2019.03.068

23. Zhukovskiy Y., Koteleva N. Diagnostics and evaluation of the residual life of an induction motor according to energy parameters. Journal of Physics: Conference Series. Mechanical Science and Technology Update (MSTU-2018), 27-28 February 2018, Omsk, Russia. IOP, 2018. Vol. 1050. N 012106. DOI: 10.1088/1742-6596/1050/1/012106

Authors: Roman V. Klyuev, Doctor of Engineering Sciences, Professor, kluev-roman@rambler.ru, https://orcid.org/0000-0003-3777-7203 (Moscow Polytechnic University, Moscow, Russia), Igor I. Bosikov, Candidate of Engineering Sciences, Associate Professor, igor.boss.777@mail.ru, https://orcid.org/0000-0001-8930-4112 (North Caucasian Mining and Metallurgical Institute (State Technological University), Vladikavkaz, Russia), Oksana A. Gavrina, Candidate of Engineering Sciences, Associate Professor, Gavrina-Oksana@yandex.ru, https://orcid.org/0000-0002-9712-9075 (North Caucasian Mining and Metallurgical Institute (State Technological University), Vladikavkaz, Russia).

The authors declare no conflict of interests.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

The paper was received on 5 October, 2020.

The paper was accepted for publication on 23 March, 2021.

i Надоели баннеры? Вы всегда можете отключить рекламу.