Научная статья на тему 'Fuzzy Linear Programming Approach for Solving Production Planning Problem'

Fuzzy Linear Programming Approach for Solving Production Planning Problem Текст научной статьи по специальности «Математика»

CC BY
225
66
i Надоели баннеры? Вы всегда можете отключить рекламу.
Область наук
Ключевые слова
Fuzzy Linear Programming / Degree of Satisfaction / Production Planning / Fuzzy PF / Vagueness

Аннотация научной статьи по математике, автор научной работы — Mahesh M. Janolkar, Kirankumar L. Bondar, Pandit U. Chopade

One of the various optimization methods that addresses optimization under uncertainty is fuzzy linear programming. This model can be used when there is ambiguity in the situation because it is not precisely specified or when the problem does not require an exact value. With fuzzy linear programming, there is a range of grey between the two extremes as opposed to binary models, where an event may only be either black or white. As a result, it broadens the range of potential applications because most scenarios involve a spectrum of values rather than a bipolar state. In this article, a new FLP-based method is developed using a single MF, called modified logistics MF. The modified MF logistics and its modifications taking into account the characteristics of the parameter are from the analysis process. This MF was tested for useful performance by modeling using FLP. The developed version of FLP provides confidence in the existing IPPP application. This approach to resolving the IPPP can get feedback from the decision maker, the implementer and the analyst. In this case, this process can be called FLP interaction. FS self-assembly for MPS problems can be developed to find satisfactory solutions. The decision maker, researcher and practitioner can apply their knowledge and experience to get the best results.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Fuzzy Linear Programming Approach for Solving Production Planning Problem»

Fuzzy Linear Programming Approach for Solving Production Planning Problem

Mahesh M. Janolkar

Department of First Year Engineering Prof Ram Meghe College of Engineering and Management Badnera-Amravati (MS India)

maheshj [email protected] Kirankumar L. Bondar

P. G. Department of Mathematics, Govt Vidarbh Institute of Science and Humanities, Amravati.

klbondar [email protected] Pandit U. Chopade

Research Supervisor, Department of Mathematics, D.S.M's Arts Commerce and Science College ,Jintur. [email protected]

Abstract

One of the various optimization methods that addresses optimization under uncertainty is fuzzy linear programming. This model can be used when there is ambiguity in the situation because it is not precisely specified or when the problem does not require an exact value. With fuzzy linear programming, there is a range of grey between the two extremes as opposed to binary models, where an event may only be either black or white. As a result, it broadens the range of potential applications because most scenarios involve a spectrum of values rather than a bipolar state. In this article, a new FLP-based method is developed using a single MF, called modified logistics MF. The modified MF logistics and its modifications taking into account the characteristics of the parameter are from the analysis process. This MF was tested for useful performance by modeling using FLP. The developed version of FLP provides confidence in the existing IPPP application. This approach to resolving the IPPP can get feedback from the decision maker, the implementer and the analyst. In this case, this process can be called FLP interaction. FS self-assembly for MPS problems can be developed to find satisfactory solutions. The decision maker, researcher and practitioner can apply their knowledge and experience to get the best results.

Keywords: Fuzzy Linear Programming, Degree of Satisfaction, Production Planning, Fuzzy PF, Vagueness.

Abbreviations

FLP : fuzzy linear programming

MF : membership function

IPPP : industrial production planning problem

FS : fuzzy system

NL : non linear

NLMF : nonlinear membership function

IP : industrial Problem

FP

MPS

LP

Fuzzy parameter mix product selection Linear Programming

1. Introduction

In previous studies a logistical MF model is developed to overcome the difficulty of using linear MF to solve complex decision making problems. However, it is expected that a new type of logistic MF based on certain NL resources can be obtained and its variability in changing the pattern of real-life problems can be explored. Such patterns of NL logistic MF are reflected in this work with its paradoxical changes in real life problems. The first step in testing such an MF system and its transformation is to apply it to a digital model that illustrates the problem of real decision making. A novel approach for fuzzy linear programming has been created recently employing a particular membership function called the modified logistic membership function. The modified logistic membership function is first developed, then an analytical technique is used to determine its adaptability to unclear parameters. Fuzzy linear programming is used to examine the usefulness of this membership function using an example to provide context. Applying FLP's established technique to actual industrial production planning problems now seems confident. The analyst, the implementer, and the decision-maker may all receive input from this method of solving the industrial production planning problem. This method can therefore be referred to as an IFLP (Interactive FLP). To discover a satisfying solution to the mix product selection problem, it is possible to create a self-organizing fuzzy system. To get the optimum result, the decision-maker, the analyst, and the implementer can pool their expertise and experience. Another study shows, for example, the benefits of MF. Their work is based on exponential LF. His demonstrated example can be accepted to test and compare our newly developed NLMF [1-3], such an attempt to compare this example with the results achieved in this work.

The test based on good intellectual ability should be performed with the newly developed MF to demonstrate that it fits the determination. This IP should be developed by creating multiple products with high FP as well as multiple uncertainties on productivity, product demand, availability and service time. Since it integrates operations and strategies, ties operations with strategies, and is essential to enterprise resource planning and organizational integration, aggregate production planning (APP) is regarded as a crucial stage in production systems. An efficient APP should boost the quality of service offered to the clients while simultaneously minimizing production and inventory expenses. Some cost and demand characteristics can't always be accurately assessed when maintaining an application. Numerous engineering applications use fuzzy logic to manage erroneous data. This gave the problem of aggregate production planning in an environment with uncertain data a mathematical programming foundation. Fuzzy linear programming is used to solve the APP issue when background information about the APP problem is given. An example is shown to illustrate how the model works for various -cut values. A researcher used different types of PI to ensure that its approach used traditional optimization techniques. Complex real-world intelligence tools should be used to test the newly developed MF to ensure it is relevant and decision-making. To test the new MF and the problems shown above, a software platform is required. This platform not only accepts FPs, but also needs to streamline FLP to provide the necessary data for the decision maker. The software, MATLAB, and LP Toolbox are well-suited for resolving such FLP problems, mainly as well as many FPs and unnecessary restrictions. In this study, the author used MATLAB and LP Toolkit to solve the real IP problem of the MPS problem [4-6].

Mahesh M. Janolkar, Kirankumar L. Bondar, Pandit U.Chopade

FUZZY LINEAR PROGRAMMING APPROACH FOR SOLVING RT&A, No 4 (71) PRODUCTION PLANNING PROBLEM_Volume 17, December 2022

2. Methodology of MF

According to some previous studies, the trapezoidal MF will experience difficulties such as damage when resolving FLP problems. To solve the damage problem, we should use NL LF as a hyperbolic tangent with asymptotes at land 0 [7-8]. In this case, we use LF for NLMF as given by: Minimize

g (y} = T+D^

Where C and D are scalar constants and, 0 < b < 1 is FP considering DOV, where b = 0 indicates sharp. The difference is higher when you approach the same. Configuration (2.1) will be the same as shown in Figure 1 when 0 < b < 1.

The reason we use this function is that MF logistic is similar to hyperbolic tangent function in previous studies, but more flexible than hyperbolic tangent. It is also known that trapezoidal MF corresponds to LF. Therefore, LF is considered an appropriate function to demonstrate the level of unfounded objective. This work is invaluable in decision-making and implementation by decisionmaker and designer. LF, (2.1) is a non-monotonic activity, to be used as fuzzy MF. This is very important because, due to the unpredictable environment, DOV represents the acquisition of change [9-12]. We can show that MF does not increase as:

dg __ CD fie1'-

dy ""(1 + Deb) (Z2)

dg

Where c D and y are all above zero, -< 0 .Furthermore, it can be shown that (2.1) has

dy

asymptotes in g(y) = 0 and g(y) = 1 with the appropriate values of c,D [13-14]. This means

lim — = 0 and lim — = 0.

y®¥ dy y®° dy

This can be expressed as follows: From (2.2)

lim dg = -¥

y®¥ dy ¥

Therefore, using the L-hospital's rule, we obtained:

r dg CP n

lim— = —,---7 = 0 „,

y®« dy 2 (1 + DePy) (Z3)

As y ® 0 the situation is not very vague so b ® 0. From (2.2) we have:

limdg = - lim CDb2 = 0, when b® 0

y®¥ dy y®¥ (1 + D)

(2.4)

In addition to the above, LF (2.2) has a vertical tangent at y = y0. Where g (y0 ) = 0.5. This can be demonstrated by defining tangent as:

lim g ( + *) - g ( )

C___C

lim g (y + i) - g (y) = liml + Deb+i) - 1 + Deb (2.5)

i®0 i i ®0 i

CDeb (l - eb ) o lim^-Vt---^ = —

® i (l + Deb+> )(l + Deb ) 0

So, by using L-hospital's rule:

lim g (% + i) - g (% ) = Hm_ -bCDeb(yo+i)

i®0 i i®0

i (1 + Debyo )(l + Deb y°+i) + b

( Vo +1 )- g ( Vo ) -PCDeby

-/ = lim

®0 i '®0 (l + Debyo )

To make g( y0) = 0.5 and g (0) = 1, by (2.1)

1 , L 1

y0 =~ ln I 2 + — 0 b è D

C = 1 + D

Now we use (2.7) as well as (2.8) in (2.6),

-b(2D-1) ®-¥ , when D& C ! 0

4C

(2.6)

(2.7)

(2.8)

(2.9)

This shows that the vertical tangent is y = y0.

It can also be shown that the LF has an inflection point at y = y0, such as g"(y0) = 1. Where g "(y) is the second derivative of g (y) compared to y. In addition, it can be shown that g"'(y0) = 0 at y = y0, where g "'(y) is the third derivative of g(y) compared to y [15-17]. The above argument about vertical, asymptotic, and rotational tangent leads to the conclusion that the recommended LF is variable [18-19]. An MF of this type, unlike linear work, presents real-life problems. From the above description of LF characteristics, the current MF is fully described for FLP problems in the following statistics. NLMF is quickly identified for the FLP problem in the next section.

2.1 Logistic MF

MF logistics for FLP problems are defined as:

1; y ! k

g ( y

C

-; yk! y ! yv

(2..1.1)

1 + Deb

^0; y " yk

Where g(y) is MF value of same parameter y and 0 < g(y) < 1.

The size y is considered a member of the fuzzy set associated with it; yk and yv respectively are the minimum values as well as the maximum values of FP y . C, D are variable and b > 0 determines the type of MF. The greater the benefit of this, the greater it's DOV.

Mahesh M. Janolkar, Kirankumar L. Bondar, Pandit U.Chopade

FUZZY LINEAR PROGRAMMING APPROACH FOR SOLVING RT&A, No 4 (71) PRODUCTION PLANNING PROBLEM_Volume 17, December 2022

2.2 S-Curve MF

S-curve MF is a special case of LF with certain values of C, D and. These principles will be identified. This LF as given by (2.1.1) is expressed as MF in S form by some studies [20-21]. Here, we define the S-curve MF as follows:

1; y ! yb

0.9999; y = yb

q( y )=

-^b- ; yb ! y ! yc (2.Z1)

1 + Deb

0.001; y = yc

0; y " yc

Where 0 is the MF level. (2.2.1) is similar to (2.1.1) except that MF is adjusted to 0.001 < 0(y) < 0.999. This size is chosen because in the manufacturing process it is not always necessary 100% of the required material. At the same time, the operating capacity will not be below 0%. So there is a gap

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

b c

between y and y with 0.001 < 0 (y) < 0.999. This concept of near (y) is used in this article to

solve the output processing problem of the nonlinear MPS problem. We rotate the y-axis as yb = 0

and yc = 1 to find the values of C, D and p. A study has made such an increase in its scientific work [22]. The values of C, D and p are derived from (2.2.1) as:

C = 0.999(1 + D) (2.2.2)

c = 0.001 (Z23)

1 + Deb

By using (2.2.2) into (2.2.3) we have:

1 + Deb

Rearranging (2.2.4) we have:

0.999(1 + D) = 0001 (2.2.4)

1 ( 0 998 ö (2.2.5)

ß = ln—!— l^i + 0.999 1 V '

0.001 è D

Since C and b are based on D, we need another condition to obtain the values of C, D, b. Let,

b c

yo = lj+L ,q(yo) = 0.5

= 0.5 (2.Z6)

1 + De2

and hence:

b = 2ln|2C-11 (2.2'7)

D

By using (2.2.2) and (2.2.5) into (2.2.7) we have:

, f2(0.999)(1 + D)-1 ö , 1 (0.998 ö (2.2.8)

2ln -i-^-'-— = ln-1-+ 0.999

0.001 è D

D

v

By solving (2.2.8):

(0.998 + 1.998D )2 = D (998 + 999D ) By solving (2.2.9):

-994.011992 ±yj988059.8402 + 3964.127776 (2.2.10)

(2.2.9)

D = ■

1990.015992

Since D has to be positive, (2.2.10) gives C = 0.001 and from (2.2.2) and (2.2.5), C = 1 and b = 14.120 respectively.

2.3 MF of the TC of the Matrix Sfci The MF for the TC is given by:

1.000; bkl ! % 0.9999; bkl = bbkl B

^bkl

1 + De è bkl -bkl

-y ; bbkl < bkl ! K

(2.3.1)

0.001; bki = bckl 0.000; bki " K

Where 0bklis the degree of adhesion of TC bkl. bkl and bckl are individually very low and very high

for bkl TCs.

2.4 Fuzzy TC of the Matrix bh.

7 *

The MF for bkl is given by

^bkl

B

b

bkl-bi bkl-bkl

1 + De

By rearranging exponential term, we have the following:

b

1

D

r

C

èqbki

1

By taking log on the both sides we have:

ß

è bkl — bkl 0

= lni

D

(

C

-1

è ^bkl 0

Hence we have:

bki = bb +

œ bc - bb ö i œ c ö ki ki

ß

ln —

D

■-1

è ßbkl 0

Since bM is the fuzzy TC in (2.4.1), It is denoted by b*. Therefore

= bb +

œ bc - bb ö i œ c ö uki uki - 1 ^

b

ln

D

— 1

è ^bkl 0

(2.4.1)

(2.4.2)

e

3. A New Mathematical Model for FLP Problem

Let

8

Max£ diyi

i=i

Subject to:

29

S b

kl

k=i e=6

; y £ ck

(3.1)

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

where yl >0;l = 1,2,,4,5,6,7,8

and (3.1) dl is a numerical target, bu \e=e is TCs, yl is the decision change and ck is the default

hardware change. (2.4.2) and (3.1) combine to form FLP and (3.2). Also,

o

Max2 diyi

l=1

Subject to:

29

S b

k=1

+

klkl

b

ln-

D

q-i

è ^bkl 0

; y£ ck

(3.2)

where yl > 0; l =1,2,, 4,5,6,7,8 ; 0 !0dl ;0ck !l ; 0 ! b!

¥

4. Account on Fuzzy MPS Problem

There are 8 products that can be made by mixing 8 different components and using 9 different configurations. There are also 10 restrictions of the marketing department such as MPS, the requirements of the main product line, as well as the minimum and maximum scope of demand for each product. All the requirements in these circumstances are unclear. It is important to use some DOS to get the maximum benefit from using FLP integration.

4.1 Calculation of w*

Using the LP method, we will be able to address the above-mentioned FLP types as well as the solution of the nonlinear size for the constraints and objective functions that can be achieved. The results obtained in Tables 4.1 and 4.2 are summarized. From Table 4.1 we can see that the values increase the performance. Some previous studies compared this idea as appropriate to represent DOS to describe OF as PF [23-24]. His counsel is becoming more real. PF has a value of 319939 to 0.999. We describe this as 99.9% DOS. As a result, a w * of 207963 has 0.1% DOS. The possible solution is at 0 = 0.5 (i.e. 50% DOS) with a value of w * as 247000.

Table 4.1: OS with S-curve MF for 0 = 14.120.

DOS (9) Optimum Values (w*)

0.001000 207963

0.022502 216398

0.121470 224527

0.142474 225177

0.224478 225592

0.283608 230332

0.348042 232317

0.414188 234535

0.456242 245439

0.510467 247826

0.524670 268147

0.542077 273526

0.558422 288537

0.778327 291170

0.783527 292077

0.838137 303324

0.859673 305543

0.914147 307862

0.925365 314989

0.935917 319187

0.999000 319939

Table 4.2: Distribution of w* against 6 and fi

w* DOV (|3)

DOS (0) 17 13 9 5 1

0.001 195324 195453 196602 196801 197807

0.250 240136 244800 274791 281523 315592

0.500 267608 287858 289857 295578 316135

0.750 266755 292940 306754 312935 318880

0.999 316185 317208 318635 318733 318931

4.2 Objective Values of Various ft

Table 4.1 shows the variability of OV w * compared to DOS 0 for the value of DOV b = 14.120. It will be useful for the decision-maker to see such differences for a number of principles. Membership value in the analysis above represents DOS and w * is PF. We can conclude that as the DOV increases, the value of the individual increases. This event actually happens with real life problems in an unpredictable environment.

The ideal solution in a nonlinear environment is 6 = 0.5 . Thus, the results for 50% of the DOS (0 = 0.5) for 3 £ b £ 19 and the corresponding values for w * are shown in Table 4.2. We can see in Table 4.2 that for 6 = 0.5 and for that increase, w * decreases. We can conclude that when DOV and TC conversion increase, w * decreases for a single DOS. The data in Table 4.2 are the result of IFLP analysis for (3.1). This information is very useful for the decision maker to make a definite decision about its implementation after the dissertation [25-27].

4.3 Distribution of w* against 9 and ft

The relationship between w *, 0 is provided in Table 4.2. This table is very useful for the decision maker to find out the value and any benefits offered in DOS 0. From Table 4.2 we can see that OV does not depend on DOV and DOS. It cannot be concluded that for the higher value of DOS, the value of value will be higher. This is not true. But at 99.9% DOS, the profit margin will be the highest even at the highest DOV costs. From the diagonal values in Table 4.2, we can conclude that the VO increases at a lower value (0.001 <0< 0.250). Then the w * value is reduced to 0.500 <6 < 0.750 . Finally, the value of w * increases by 0.750 <6 < 1. These results indicate that the correct resolution (DOS) does not guarantee high value (OV). This means that a person will be satisfied with some DOS when it comes to decision making and the environment.

5. Conclusion and Future Work

The industrial application of FLP interaction is analyzed by modified S-curve MF using real-time data collected from chocolate manufacturers. The problem of non-compliant MPS has been

Mahesh M. Janolkar, Kirankumar L. Bondar, Pandit U.Chopade

FUZZY LINEAR PROGRAMMING APPROACH FOR SOLVING RT&A, No 4 (71) PRODUCTION PLANNING PROBLEM_Volume 17, December 2022

described. Eight cases were identified that could be based on non-FP in the FP system. The

required size of each is listed. Value and quality were calculated using the FLP method. Because

there are so many decisions to make, the tools to define the solution and the high level of

profitability and high DOS are outlined. It should be borne in mind that higher profits will not

necessarily lead to higher DOS. FS self-assembly for MPS problems can be developed to find

satisfactory solutions. The decision maker, researcher and practitioner can apply their knowledge

and experience to get the best results.

References

[1] Das SK, Mandal T, Edalatpanah S. A new approach for solving fully fuzzy linear fractional programming problems using the multi-objective linear programming. RAIRO-operations research. 2017;51(1):285-97.

[2] Ebrahimnejad A. Fuzzy linear programming approach for solving transportation problems with interval-valued trapezoidal fuzzy numbers. Sadhana. 2016;41(3):299-316.

[3] Azadeh A, Raoofi Z, Zarrin M. A multi-objective fuzzy linear programming model for optimization of natural gas supply chain through a greenhouse gas reduction approach. Journal of Natural Gas Science and Engineering. 2015;26:702-10.

[4] Das SK, Mandal T, Edalatpanah S. A mathematical model for solving fully fuzzy linear programming problem with trapezoidal fuzzy numbers. Applied Intelligence. 2017;46(3):509-19.

[5] Zaidan A, Atiya B, Bakar MA, Zaidan B. A new hybrid algorithm of simulated annealing and simplex downhill for solving multiple-objective aggregate production planning on fuzzy environment. Neural computing and applications. 2019;31(6):1823-34.

[6] Chandrawat RK, Kumar R, Garg B, Dhiman G, Kumar S, editors. An analysis of modeling and optimization production cost through fuzzy linear programming problem with symmetric and right angle triangular fuzzy number. Proceedings of Sixth International Conference on Soft Computing for Problem Solving; 2017: Springer.

[7] Gholamian N, Mahdavi I, Tavakkoli-Moghaddam R. Multi-objective multi-product multisite aggregate production planning in a supply chain under uncertainty: fuzzy multi-objective optimisation. International Journal of Computer Integrated Manufacturing. 2016;29(2):149-65.

[8] Tirkolaee EB, Goli A, Weber G-W, editors. Multi-objective aggregate production planning model considering overtime and outsourcing options under fuzzy seasonal demand. International Scientific-Technical Conference Manufacturing; 2019: Springer.

[9] Su T-S, Lin Y-F. Fuzzy multi-objective procurement/production planning decision problems for recoverable manufacturing systems. Journal of Manufacturing Systems. 2015;37:396-408.

[10] Ghanbari R, Ghorbani-Moghadam K, Mahdavi-Amiri N, De Baets B. Fuzzy linear programming problems: models and solutions. Soft Computing. 2020;24(13):10043-73.

[11] Gholamian N, Mahdavi I, Tavakkoli-Moghaddam R, Mahdavi-Amiri N. Comprehensive fuzzy multi-objective multi-product multi-site aggregate production planning decisions in a supply chain under uncertainty. Applied Soft Computing. 2015;37:585-607.

[12] Chakrabortty RK, Hasin MAA, Sarker RA, Essam DL. A possibilistic environment based particle swarm optimization for aggregate production planning. Computers & Industrial Engineering. 2015;88:366-77.

[13] Baykasoglu A, Subulan K. An analysis of fully fuzzy linear programming with fuzzy decision variables through logistics network design problem. Knowledge-Based Systems. 2015;90:165-84.

[14] Khemiri R, Elbedoui-Maktouf K, Grabot B, Zouari B. A fuzzy multi-criteria decision-making approach for managing performance and risk in integrated procurement-production planning. International Journal of Production Research. 2017;55(18):5305-29.

[15] Sakhaii M, Tavakkoli-Moghaddam R, Bagheri M, Vatani B. A robust optimization

Mahesh M. Janolkar, Kirankumar L. Bondar, Pandit U.Chopade

FUZZY LINEAR PROGRAMMING APPROACH FOR SOLVING RT&A, No 4 (71) PRODUCTION PLANNING PROBLEM_Volume 17, December 2022

approach for an integrated dynamic cellular manufacturing system and production planning with

unreliable machines. Applied mathematical modelling. 2016;40(1):169-91.

[16] Tan R, Aviso KB, Cayamanda CD, Chiu AS, Promentilla MAB, Ubando AT, et al. A fuzzy linear programming enterprise input-output model for optimal crisis operations in industrial complexes. International Journal of Production Economics. 2016;181:410-8.

[17] Singh SK, Yadav SP. Modeling and optimization of multi objective non-linear programming problem in intuitionistic fuzzy environment. Applied mathematical modelling. 2015;39(16):4617-29.

[18] Ezzati R, Khorram E, Enayati R. A new algorithm to solve fully fuzzy linear programming problems using the MOLP problem. Applied mathematical modelling. 2015;39(12):3183-93.

[19] Khakdaman M, Wong KY, Zohoori B, Tiwari MK, Merkert R. Tactical production planning in a hybrid Make-to-Stock-Make-to-Order environment under supply, process and demand uncertainties: a robust optimization model. International Journal of Production Research. 2015;53(5):1358-86.

[20] Rani D, Gulati T, Garg H. Multi-objective non-linear programming problem in intuitionistic fuzzy environment: Optimistic and pessimistic view point. Expert Systems with Applications. 2016;64:228-38.

[21] Wu Y-K, Liu C-C, Lur Y-Y. Pareto-optimal solution for multiple objective linear programming problems with fuzzy goals. Fuzzy optimization and decision making. 2015;14(1):43-55.

[22] Nasseri S, Yazdani A, Darvishi Salokolaei D. A primal simplex algorithm for solving linear programming problem with grey cost coefficients. Journal of New Researches in Mathematics. 2016;1(4):115-35.

[23] Alavidoost M, Babazadeh H, Sayyari S. An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem. Applied Soft Computing. 2016;40:221-35.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

[24] Ebrahimnejad A. An improved approach for solving fuzzy transportation problem with triangular fuzzy numbers. Journal of intelligent & fuzzy systems. 2015;29(2):963-74.

[25] Ebrahimnejad A. A duality approach for solving bounded linear programming problems with fuzzy variables based on ranking functions and its application in bounded transportation problems. International Journal of Systems Science. 2015;46(11):2048-60.

[26] Modarres M, Izadpanahi E. Aggregate production planning by focusing on energy saving: A robust optimization approach. Journal of cleaner production. 2016;133:1074-85.

[27] Wan S-P, Wang F, Lin L-L, Dong J-Y. An intuitionistic fuzzy linear programming method for logistics outsourcing provider selection. Knowledge-Based Systems 2015;82:80-94.

i Надоели баннеры? Вы всегда можете отключить рекламу.