
Похожие статьи
- A New Ranking in Hexagonal Fuzzy number by Centroid of Centroids and Application in Fuzzy Critical Path2021 / S. Adilakshmi, Dr. N. Ravi Shankar
- Application of the hot-spot evaluation method for monitoring of data center network2018 / Babkin Oleg Vyacheslavovich, Varlamov Aleksandr Aleksandrovich, Gorshunov Roman Aleksandrovich, Dos Evgenii Vladimirovich, Kropachev Artemii Vasilyevich, Zuev Denis Olegovich

Похожие статьи
- Estimation of input financial and economic parameters of an investment project based on a fuzzy set approach2018 / Kotsyuba Oleksiy S.
- UNCERTAINTY MODELING USING INTUITIONISTIC FUZZY NUMBERS2021 / Milovanovic Vladimir R., Aleksic Aleksandar V., Sokolovic Vlada S., Milenkov Marjan A.
Похожие статьи
- Coding and reconstruction of bit series with Takagi-Sugeno recurrent models2004 / Alexander Sokolov, Sergey Chervenko
- SELECTING MADIUN-DOLOPO TRACE ROUTE WITH THE FUZZY AHP (ANALYTIC HIERARCHY PROCESS) METHOD2021 / Astuti Septiana Widi, Kurniawan Muhammad Adib, Aghastya Adya
Похожие статьи
- A NOVEL TRANSPORTATION APPROACH TO SOLVING TYPE 2 TRIANGULAR INTUITIONISTIC FUZZY TRANSPORTATION PROBLEMS2021 / Indira Singuluri, N. Ravishankar
- MODEL FOR SELECTING A ROUTE FOR THE TRANSPORT OF HAZARDOUS MATERIALS USING A FUZZY LOGIC SYSTEM2021 / Milosevic Teodora D., Pamucar Dragan S., Chatterjee Prasenjit