Научная статья на тему 'BENEFITS AND CHALLENGES ENCOUNTERED IN UTILIZATION BUILDING INFORMATION MODELLING IN CONSTRUCTION PROJECTS'

BENEFITS AND CHALLENGES ENCOUNTERED IN UTILIZATION BUILDING INFORMATION MODELLING IN CONSTRUCTION PROJECTS Текст научной статьи по специальности «Строительство и архитектура»

CC BY
171
33
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
Project construction / structural modelling / BIM / Structural detailing / строительство проекта / структурное моделирование / BIM / структурная детализация

Аннотация научной статьи по строительству и архитектуре, автор научной работы — Avali Ali, Ahmed Hamza Ahmed Hussein, Mugham Taher Adel Taher, Abdulvahid Balig Mohammed Hazaa, Al-Buriahi Ammar Sultan Abdulghaffar

Building Information Modelling (BIM) has become a well-known established extensive collaborative process and an important area of development in architecture, engineering, and construction (AEC) and has expanded beyond all disciplines. The use of BIM in construction projects can arguably improve the quality of information needed to make important design decisions to assess the impact of a building on the environment. The analysis, design and infrastructure of buildings are formulated with BIM-based designs. The BIM method fits well with delivery systems for integrated projects. This analysis aims to show the relevance of the roles of BIM and the project manager in construction projects. It insists on the importance of proper knowledge and experience of project managers to achieve success with BIM. The paper discusses the implementation of BIM, static design, and the inherent challenges of trying to estimate benefits in a purely quantitative way. Through the application of BIM technology to dynamic enquiries and the statistical study of construction schedules, design, resources, and costs, these three implementations are considered proven, as BIM can facilitate the understanding of project implementation and progress.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

ПРЕИМУЩЕСТВА И ПРОБЛЕМЫ, ВОЗНИКАЮЩИЕ ПРИ ИСПОЛЬЗОВАНИИ ИНФОРМАЦИОННОГО МОДЕЛИРОВАНИЯ ЗДАНИЙ В СТРОИТЕЛЬНЫХ ПРОЕКТАХ

Информационное моделирование зданий (BIM) стало хорошо известным устоявшимся обширным процессом сотрудничества и важной областью развития в области архитектуры, инженерии и строительства (AEC) и вышло за рамки всех дисциплин. Использование BIM в строительных проектах, возможно, может повысить качество информации, необходимой для принятия важных проектных решений для оценки воздействия здания на окружающую среду. Анализ, проектирование и инфраструктура зданий разрабатываются с использованием BIM-технологий. Метод BIM хорошо сочетается с системами доставки для интегрированных проектов. Этот анализ направлен на то, чтобы показать актуальность ролей BIM и руководителя проекта в строительных проектах. Он настаивает на важности надлежащих знаний и опыта руководителей проектов для достижения успеха с BIM. В статье обсуждается внедрение BIM, статического проектирования и присущие ему проблемы, связанные с попытками оценить преимущества чисто количественным способом. Благодаря применению технологии BIM для динамических запросов и статистического изучения графиков строительства, проектирования, ресурсов и затрат, эти три реализации считаются доказанными, поскольку BIM может облегчить понимание реализации и прогресса проекта.

Текст научной работы на тему «BENEFITS AND CHALLENGES ENCOUNTERED IN UTILIZATION BUILDING INFORMATION MODELLING IN CONSTRUCTION PROJECTS»

- TexHuuecKue HayKU -

BENEFITS AND CHALLENGES ENCOUNTERED IN UTILIZATION BUILDING INFORMATION MODELLING IN CONSTRUCTION PROJECTS

Avali AH1, Master's Student

Ahmed Hamza Ahmed Hussein2, Master's Student

Mugham Taher Adel Taher1, Master's Student

Abdulvahid Balig Mohammed Hazaa1, Master's Student

Al-Buriahi Ammar Sultan Abdulghaffar1, Master's Student

Mohammed Mohammed Ahmed Saleh3, Master's Student

1Russian Peoples' Friendship University

2 Peter the Great St. Petersburg Polytechnic University

3Moscow State University of Civil Engineering

13 (Russia, Moscow)

2 (Russia, St. Petersburg)

DOI:10.24412/2500-1000-2021-11-3-26-30

Abstract. Building Information Modelling (BIM) has become a well-known established extensive collaborative process and an important area of development in architecture, engineering, and construction (AEC) and has expanded beyond all disciplines. The use of BIM in construction projects can arguably improve the quality of information needed to make important design decisions to assess the impact of a building on the environment. The analysis, design and infrastructure of buildings are formulated with BIM-based designs. The BIM method fits well with delivery systems for integrated projects. This analysis aims to show the relevance of the roles of BIM and the project manager in construction projects. It insists on the importance of proper knowledge and experience of project managers to achieve success with BIM. The paper discusses the implementation of BIM, static design, and the inherent challenges of trying to estimate benefits in a purely quantitative way. Through the application of BIM technology to dynamic enquiries and the statistical study of construction schedules, design, resources, and costs, these three implementations are considered proven, as BIM can facilitate the understanding ofproject implementation and progress.

Keywords: Project construction, structural modelling, BIM, Structural detailing.

Introduction

In the construction industry, there are various issues related to construction costs, low-carbon emissions, green buildings, sustainable buildings, social responsibility, natural ecology, and well-being. Building Information Modelling (BIM) is one way to change the way projects are maintained, designed, and constructed. The BIM Handbook [1] defines BIM as computer-aided modelling technology for the purpose of managing building project information, focusing on building information, models, production, communication, and analysis. The National Building Information Modeling Project (NBIMS) committee has defined BIM as a digital representation of physical and functional features. It helps in the sharing of a knowledge resource about a facility, forming a reliable source of solutions during its life-

time from the outset. This scoping document defines sustainable design as design processes and methods that promote sustainable lifestyles throughout the built environment based on the triple bottom line method. The BIM construction environment defines the environmental, social, and economic health of a place. Achieving this requires a common understanding between several stakeholders. Moving from an isolated and static understanding of building performance in terms of design discourse to a broad and dynamic discourse that encourages an understanding of the life-cycle impacts of the building on people's lives and business success will include and maintain stakeholder commitment [2].

With the current legislation defining minimum requirements for sustainability, project teams inevitably perceive this as complementary to the main objectives and budget. Sus-

- TexHuuecKue HayKU -

tainability proposal is given in a meaningful commentary as "new concepts and tools that are integrative and synthetic, non-disciplinary and analytical and that energetically create synergies rather than just summation" [3].

The purpose of this paper is to provide an overview of the BIM concept, usage, benefits, risks, and related issues in the AEC industry.

As shown in Figure 1, BIM consists of a three-dimensional project model integrating design, planning, construction, and operation

[4]. The idea of BIM originated from the methodology of object-oriented parametric modelling [5]. The term -parametric defines a procedure by which an assembly is automatically tuned to preserve a previously discovered relationship [6]. The main difference between traditional 3D BIM and CAD technology is that the latter labels the building with independent 3D views such as facades, plans and sections, whereas the former does not label in this way.

Figure 1. A Schematic representation of BIM model [4]

BIM can be considered as a virtual process in which all functions are combined and organised. Today, BIM is perceived only as an

advertisement for software companies. BIM can be taken as software and as an integrated method, which is shown in Figure 2 [7].

Drawing / CAD I BIM

2D I I > 3D/4D/5D/Xd Status quo Change of thinking

Necessity of printing ' | > Electronic communication Manual Work Automated

Analogous processing i -> Digital processing

Slow work Fast work

Disconnected part ' j > Fully integrated

Figure 2. Process of transitions CAD vs. BIM [7]

On the other hand, BIM applications are practiced in industries such as construction, information technology, and software and hardware. When considering BIM, a 3D model is often considered a fake. It should be noted that BIM is essentially a data package. It includes all information about the construction, design, management, and renovation of

buildings. A 3D model is one of several possible ways to describe this information.

Recently, the concept of Integrated Project Delivery (IPD) has become a natural complement to BIM. In the USA [8], IPD has become the preferred project delivery system for all major BIM-related projects. Figure 3 shows the difference between the 'traditional' and 'BIM' process.

- TexHuuecKue HayKU -

Relational Database Active Access, Construction

(Design, Documents, Data) Shanng S Data Use 8 Operation

Figure 3. Difference between —traditional! process and —BIM process [8]

There are some specific aspects of BIM that helps in their effective implementation in project management. These attributes, developed progressively can be explained as follows:

• Constructability

• Investigation

• Quantity take-off

Construction makes up a significant part of all projects [9]. These can range from commercial projects to small mega mixed-use residential projects. The management of construction projects requires an understanding of modern management knowledge of the various construction procedures. Because of changes in organisational procedures, technology and new methods, the construction management process is different [10]. Construction project management refers to the sequence of activities to define the work process in the life cycle. Like the Project Management Body of Knowledge (PMBOK), the manager deals with project management planning, cost, quality, time, contract administration, risk, and safety management. The manager is also the liaison body between investors, designers, owners, engineers, professional team, and administrative staff. Usually, construction project management shares common and shared features of common projects. Consequently, the rules and approaches needed to manage common projects can be applied to this type of project.

CHALLENGES

The current review [11] shows that if project team members do not believe in the importance and benefits of BIM for construction projects, satisfactory results will not be obtained. [12] shows that the main areas of investment in BIM include hardware, software,

and BIM workflow for collaborative interior design. [13] states that the problems of BIM can be divided into the following categories:

• technical challenges,

• skills and training challenges

• legal procedural challenges and

• economy which can obstruct the firms from upgradation of their available systems to a system which is BIM oriented.

Certain almost tangible advantages in the construction industry are the availability of information, productivity, and improved decision-making capabilities. Intangible benefits include competitive advantages, market access and better risk management. Challenges of elusive consideration include calculations in monetary terms. These studies are measurable and instinctive. Moreover, these benefits stem from business procedures and objectives. There is no self-explanatory expression to support the goals of the system. The lack of formal methodologies or procedures for creating a BIM business case leads to unequal speculation and incorrect evaluation. Approaches to evaluating information systems have been proposed. But most of them are prescriptive and reactive, depending on perception values.

BENEFITS AND ADVANTAGES OF BIM

Various construction project management sources recognize certain BIM advantages which are indicated as follows [14]

• Better performance and quality of the project

• Improved productivity

• Reduction of wastages

• Faster delivery

• New opportunities for revenue and business Low construction cost

- Технические науки -

If BIM is seen as a centralised source, it BIM is very often portrayed in the design and can allow those involved in the construction construction process, although the whole life industry to obtain the same version of the da- cycle should be in the preview of the BIM ta. Consequently, the communication risk of implementation. The application of building project managers can be reduced. The analy- information modelling reduces interoperabil-sis of feasibility and design solutions leads to ity and integration problems for facilities improved building quality and performance. management. This is the key to achieving the benefits of CONCLUSION

BIM in the pre-construction phase. During Studies show both advantages and disad-transitions, further automatic low-level vantages of BIM. The project recommends changes and accurate design of visualisations the BIM application to construction managers are required. There are various BIM tools that with a note on the challenges of using BIM have been created to address sustainability tools. BIM can be a decision-making tool, issues in construction procedures from the even though it is a technical tool. This view is beginning of design to facility management the result of a detailed description of BIM. In [15]. These technologies can help to achieve construction projects, the similarity between the results defined by sustainable assessment the role of the project manager and BIM re-methods. The mechanistic approach needed to quires a clear understanding of BIM concepts. get credit cannot be stopped and can lead to To this end, BIM should be included in the deny the humanistic benefits and develop- construction curriculum. A brief explanation ment benefits that BIM can bring in terms of of project management should be given to stakeholder dialogue, shared understanding, academics who intend to take up positions in and internalisation of values in sustainability. project management as their profession.

References

1. Chuck Eastman, Paul Teicholz, Rafael Sacks and Kathleen Liston, BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors, Second Edition, Wiley, USA, 2011, pp. 1-648.

2. Umit Isikdag, Building Information Models: An Introduction, Enhanced Building Information Models, 2015, pp. 1-12, http://dx.doi.org/10.1007/978-3-319-21825-0_1.

3. Umit Isikdag, The Future of Building Information Modeling: BIM 2.0, Enhanced Building Information Models, 2015, pp. 13-24, http://dx.doi.org/10.1007/978-3-319-21825-0_2.

4. Willem Kymmell, Building Information Modeling: Planning and Managing Projects with 4D CAD and Simulations, McGraw-Hill Construction Series, USA, 2008.

5. Salman Azhar, Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry, Leadership and Management in Engineering, Vol. 11, No. 3, 2011, pp. 241-252, http://dx.doi.org/10.1061/(ASCE)LM. 1943-5630.0000127.

6. Ahmad Jrade and Farzad Jalaei, Integrating Building Information Modeling with Sustainability to Design Building Projects at the Conceptual Stage, Building Simulation, 2013, Vol. 6, No. 4, pp. 429-444, http://dx.doi.org/10.1007/s12273-013- 0120-0.

7. Jan Fridrich and Karel Kubecka, BIM -The Process of Modern Civil Engineering in Higher Education, Procedia-Social and Behavioural Sciences, Vol. 141, 2014, pp. 763-767, http://dx.doi.org/10.1016Zj.sbspro.2014 .05.134.

8. Salman Azhar, Malik Khalfan and Tayyab Maqsood, Building Information Modeling (BIM): Now and Beyond, Construction Economics and Building, Vol. 12, No. 4, 2012, pp. 1528, http://dx.doi.org/10.5130/ajceb.v12i4.3 032.

9. Atul Porwal and Kasun N.Hewage, Building Information Modeling (BIM) Partnering Framework for Public Construction Projects, Automation in Construction, Vol. 31, 2013, pp. 204-214, http://dx.doi.org/10.1016/j. autcon.201 2.12.004

10. Xiangyu Wang and Heap-Yih Chong, Setting New Trends of Integrated Building Information Modeling (BIM) for Construction Industry, Construction Innovation, Vol. 15, No. 1, 2015, pp. 2-6, http://dx.doi.org/10.1108/CI-10-2014- 0049.

11. Shady Attia, Mohamed Hamdy, William O'Brien and Salvatore Carlucci, Assessing Gaps and Needs for Integrating Building Performance Optimization Tools in Net Zero Energy Build-

- Технические науки -

ings Design, Energy and Buildings, Vol. 60, 2013, pp. 110-124, http://dx.doi.Org/10.1016/j.enbuild.201 3.01.016.

12. Christoph Merschbrock and Bjorn Erik Munkvold, Effective Digital Collaboration in the Construction Industry - A Case Study of BIM Deployment in a Hospital Construction Project, Computers in Industry, Vol. 73, 2015, pp. 1-7, http://dx.doi.org/10.1016/j.compind.20 15.07.003.

13. Ammar Dakhil and Mustafa Alshawi, Client's Role in Building Disaster Management through Building Information Modeling, Procedia Economics and Finance, Vol. 18, 2014, pp. 47-54, http://dx.doi.org/10.1016/S2212- 5671(14)00912-5.

14. Youngsoo Jung and Mihee Joo, Building Information Modeling (BIM) a Framework for Practical Implementation, Automation in Construction, Vol. 20, No. 2, 2011, pp. 126-133, http://dx.doi.org/10.1016Zj.autcon.201 0.09.010.

15. Agnese Travaglini, Mladen Radujkovic and Mauro Mancini, Building Information Modeling (BIM) and Project Management: a Stakeholders Perspective, Organization, Technology & Management in Construction: An International Journal, Vol.6, No.2, 2014.

ПРЕИМУЩЕСТВА И ПРОБЛЕМЫ, ВОЗНИКАЮЩИЕ ПРИ ИСПОЛЬЗОВАНИИ ИНФОРМАЦИОННОГО МОДЕЛИРОВАНИЯ ЗДАНИЙ В СТРОИТЕЛЬНЫХ

ПРОЕКТАХ

Авали Али1, магистрант

Ахмед Хамза Ахмед Хуссейн2, магистрант

Мугам Тахер Адель Тахер1, магистрант

Абдулвахид Балиг Мухаммед Хазаа1, магистрант

Аль-Буриахи Аммар Султан Абдулгаффар1, магистрант

Мохаммед Мохаммед Ахмед Салех3, магистрант

Российский университет дружбы народов

2Санкт-Петербургский политехнический университет Петра Великого 3Московский государственный строительный университет 1,3(Россия, г. Москва) 2(Россия, г. Санкт-Петербург)

Аннотация. Информационное моделирование зданий (BIM) стало хорошо известным устоявшимся обширным процессом сотрудничества и важной областью развития в области архитектуры, инженерии и строительства (AEC) и вышло за рамки всех дисциплин. Использование BIM в строительных проектах, возможно, может повысить качество информации, необходимой для принятия важных проектных решений для оценки воздействия здания на окружающую среду. Анализ, проектирование и инфраструктура зданий разрабатываются с использованием BIM-технологий. Метод BIM хорошо сочетается с системами доставки для интегрированных проектов. Этот анализ направлен на то, чтобы показать актуальность ролей BIM и руководителя проекта в строительных проектах. Он настаивает на важности надлежащих знаний и опыта руководителей проектов для достижения успеха с BIM. В статье обсуждается внедрение BIM, статического проектирования и присущие ему проблемы, связанные с попытками оценить преимущества чисто количественным способом. Благодаря применению технологии BIM для динамических запросов и статистического изучения графиков строительства, проектирования, ресурсов и затрат, эти три реализации считаются доказанными, поскольку BIMможет облегчить понимание реализации и прогресса проекта.

Ключевые слова: строительство проекта, структурное моделирование, BIM, структурная детализация.

i Надоели баннеры? Вы всегда можете отключить рекламу.