RELIABILITY MODELLING OF UTENSILS MANUFACTURING SYSTEM WITH TEMPERATURE DEPENDENT MAINTENANCE
Manisha Gaba •
Department of Mathematics, Maharshi Dayanand University, Rohtak, Haryana, India
Dalip Singh •
Department of Mathematics, Maharshi Dayanand University, Rohtak, Haryana, India
Sheetal •
Department of Mathematics, Maharshi Dayanand University, Rohtak, Haryana, India
Kajal Sachdeva* •
Department of Mathematics, Maharshi Dayanand University, Rohtak, Haryana, India
Corresponding Author Abstract
In this paper, a stochastic model for utensils manufacturing system with preventive maintenance (PM) is analysed in detail. The operation is affected by variation in the temperature dependent maintenance. The entire manufacturing process of utensils goes through four subsystems viz., Circle cutting subsystem 1, Pressing subsystem 2, Spinning subsystem 3 and Polishing & Packing 4. The system has series structure of all the subsystems. The system is put under PM on the winter time and after PM it operates as new. The PM time distributions are considered as arbitrary and the time to failure as well as repair of each subsystem follows a negative exponential distribution. All random variables are statistically independent. Several measures for evaluating the effectiveness of a system, including mean time to system failure (MTSF), system availability (in summer and winter), busy period of repairman and expected number of repairs (in summer and winter) are derived using a regenerative point technique and Markov process. The system is also analysed for particular values of the parameters.
Keywords: Utensils Manufacturing System; MTSF; Availability; Regenerative Point Technique, and Preventive Maintenance (PM).
1. Introduction
Over the years researchers have made significant contribution to the reliability field. With the advent of advanced technological system, the expectations of the people have increased extremely for the use of flawless system at least for considerably period. To cater the demand
and expectation of the people, researcher have developed various stochastic models considering the aspects of different repair and obtaining performance affecting measures which include Teng et al. [1], Yusuf and Yusuf [2], Manocha and Taneja [3], Gupta et al. [4], Fagge et al. [5], Rajesh et al. [6], Kumar and Malik [7], Rajesh and Taneja [8], Jain and Malik [9], Rahbi et al. [10], Sheetal and Taneja [11,12], Sachdeva et al. [13], Rizwan et al. [14,15]. Singh and Mahajan [16] studied reliability of utensils manufacturing plant-a case study. Kumar and Kumar [17] studied mathematical modelling of stainless-steel utensils manufacturing plant using fuzzy reliability. This research investigated several failure modes in order to increase system reliability. There may be instances where the system's operation is impacted by temperature-dependent maintenance. Thus, the objective of this paper is to make a contribution in this regard because none of the research described above examined the impact of temperature-dependent maintenance on the operation of the system.
Despite playing a significant part in our daily lives, the manufacturing facility for utensils with preventative maintenance has not yet been covered. With this in mind, the present study took into account four subsystems of the manufacturing facility for utensils, with constant rates of subsystem failure and repair, and it covered stochastic modelling of the facility for utensils with preventive maintenance using the regenerative point technique and Markov process. As a result, PM of the unit is required after a certain amount of time to increase reliability and availability. Also, an effort was made to discuss the plant's availability in relation to various failure and repair rates.
The system needs to be maintained since low temperature harm the quality of utensils. By employing lubrications, replacement of a nut, screw, or other component of the system, cleaning, or other techniques to create high-quality utensils, the system is made operational as quickly as feasible. Preventive maintenance can therefore be used to increase system reliability and availability. It's also interesting to note that there hasn't been much work documented in the reliability literature so far on reliability modelling of the utensil manufacturing facility subject to preventive maintenance. Utensils plant can have a variety of parts but mainly the plant consists for four subsystems like cutting system, pressing system, spinning system and polishing and packing system. In winter there is low temperature spinning system goes in reduced capacity because of breakdown of rubber plate which is used in dye.
The mean time to system failure (MTSF), availability (in summer and winter), busy period analysis of repairman for repair (in summer and winter), expected number of visits of the repairman for repair (in summer and winter), and expected number of visits of the repairman for preventive maintenance are a few of the several ways that system efficacy can be measured that are obtained. Further the profit incurred to the system is obtained. Graphical representations of various intriguing system efficacy behaviours have been produced.
2. System Description, Notations and Assumptions
Utensils manufacturing plants are widely used to produce various kinds of utensils. Utensils plant can have a variety of parts but mainly the plant consists of four subsystems like cutting system, pressing system, spinning system and polishing and packing system. Manufacturing of utensils entails the press or spin forming of metal, which frequently involves complex geometries with straight sides and as well as curves of various radii. Below is a list of every system and notation needed for the mathematical formulation.
2.1. Description of the System
Sub-system MC (Circle Cutting Machine)
As needed, sheets are cut into circular shapes. Sub-system MP (Pressing Machine)
The circle that was cut using a circular saw is now being sent to a pressing machine. Here, it is
pressed using various dies in accordance with the size and shape of various types of kitchenware. Due to their shallow depth, some products, including as plates and bojanthal are ready for polishing right away. Sub-system MS (Spinning Machine)
According to their dies, the product created by pressing is sent for spinning. Some goods don't require further annealing before polishing, but others require it because of their deeper shapes. To eliminate contaminants, these items must be subjected to acid cleaning (Acid is a combination of Sulphuric and nitric acid). Sub-system MD (Polishing & Packing)
The final process has produced a product that is polished-ready. This stage involves packing and polishing the final product.
2.2. Notations
m (t), M1(t) M2(t), M2(t) W1(t), W1(t) W2(t), W(t)
®1, ®2, ®3, ®4 b1, b2, b3,, b4 MC, MP, MS
Mcur, Mpur , Msur, Msur
MS
MDPM
©
©
qij pj
mij Hi ft (t)
AS0, AW0 BS0, BW0
VS0, VW0 PM0
probability and cumulative density functions by which the system go for preventive maintenance probability and cumulative density functions for completion of preventive maintenance time probability and cumulative density functions for changing the summer to winter season probability and cumulative density functions for changing the winter to summer season rate of failure for subsystem MC, MP, MS, Mj rate of repair for subsystem MC, MP, MS, Mj subsystem MC, MP, MS operative subsystem MC, MP, MS, Mj under repair subsystem MS in reduced state subsystem MD under preventive maintenance Laplace Stieltjes Convolution Laplace Convolution
probability density function of the first passage time from
regenerative state i to regenerative state j
steady state transition probability from state i to state j
the unconditional mean time taken to transit to any regenerative
state i from the epoch of entry into regenerative state j
mean sojourn time in the regenerative state i before transiting
to any other state
cumulative distribution function (c.d.f.) of the first passage time from a regenerative state i to a failed state availability in summer, winter
busy period of the repairman due to repair in summer, winter
expected number of visits of repairman for repair during summer, winter expected number of visits of the repairman for preventive maintenance
2.3. Assumptions
• The failure and repair rates are independent and exponential in general.
• None of the sub-systems are experiencing simultaneous failures.
Subsystem MD has never failed.
The repaired system works just like the new system.
Subsystems are only repaired when they are in reduced or failed state.
3. Analysis of Model
In Fig. 1, the system model's possible transition diagram is shown.
Regenerate Point
Figure 1: State Transition Diagram
3.1. Description of the Model and Transition Probabilities 3.1.1 Description of the model
Various states of the model for the system consisting four subsystems with season wise (summer and winter) and the state transition diagram is displayed in above Fig. 1. States 0, 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12 of the state transition diagram are regeneration points and hence these states are regenerative states for the model. States 0 and 1 are the states four subsystem work and so represents operative state during summer and winter respectively. States 2 and 5 are the states where the sub-system MC go in failed states during summer and winter respectively so represents failed state. States 3 and 6 are the states where sub-system Mp go in failed states during summer and winter respectively so represents failed state. States 4 and 11 are the states
where sub-system MS go in failed states during summer and winter respectively so represents failed state. State 8 is the state where sub-system MS go in reduced capacity during winter so represents reduced state. States 9 and 10 are the states where sub-system MC and sub-system Mp go in failed states respectively so represents failed state also in those states sub-system Ms is in reduced capacity. States 7 and 12 are the states where sub-system MD under preventive maintenance. Also, in the state 7 the sub-system MS work in full capacity, in the state 12 the sub-system MS work in reduced capacity.
3.1.2 State Transition Probabilities
In Fig. 1, the system's transition diagram is depicted, indicating the various states of the system. Expressions for qij(t) (for all required combinations of i and j) are found based on the state transition diagram, and same are provided below:
qoi (t) = e-(ai +a2+a3 )twi (t) qos (t) = a2 e-(ai+a2+a3 )tW1 (t) qio (t) = e-(ai +a2 )tFio(t) q16 (t) = a2 e-(ai +a2+a3 )tFi (t) qi8 (t) = e-(ai +a2+a3 )tFi8 (t) q30 (t) = b2e-b2t qsi (t) = bie-bi q7i (t) = m2(t)
q89 (t) = ai e-(ai +a2+a3 )tG8(t) qs,ii(t) = a4 e-(ai+a2+a4 )tG8 (t) q98 (t) = bie-bit qii,i(t) = b4 e-b4 *
where
G8 (t) = Mi (t)G2(t) G8,i2 (t) = mi (t)G2 (t)_ Fi7(t) =_mi (t)Gi (t)w(t) Fi (t) = Mi(t)Gi (t)W2 (t)
qo2(t) = qo4(t) =
qis(t) =
qi7(t) = q2o(t) = q4o(t) =
q6i(t) = q8i(t) = qs,io(t)
q8,i2(t) qio,8(t) qi2,8(t)
ai e-(ai+a2+a3 )tWi (t)
a3 e-(ai+a2+a3 )tw (t) ai e-(ai+a2)tFi(t)
a3 e-(ai+a2+a3 )tFi7(t)
bie-bit
b3e-b3t
b2e-b2t
e-(ai+a2+a4 )tG8,i (t)
= a2e-(ai+a2+a3)'tG8 (t) = e-(ai+a2+a4)tG8,i2 (t) = b2 e-b2f = m2 (t)
G8,i(t) =_Mi (t)g2(t) Fio (t) = Mi(t)Gi (t)w2(t) Fi8 (t) = Mi(t)gi (t)W2 (t)
Transition probabilities pj(t) from state i to state j can be calculated by taking Laplace transform of above obtained values of qij(t) and then using the following mathematical relationship between
pij and qij(s) Pij = lims^o ql (s)
values of for all required combinations of i and j are obtained and the same are given as follows:
P01 = w\ («1 + «2 + «3) P02 = (g1 +g3) I1 - wi (a1 + «2 + «3)]
P03 = («1+«2+«3) 11 - W1 («1 + «2 + «3P04 = J«1+2+«r) [1 - W1(«! + «2 + «3)]
P10 = Fio(«1 + «2) P15 = «1 («1 + «2)
P16 = «2 F* («1 + «2) P17 = F17 («1 + «2)
P18 = F18 («1 + «2) P71 = m2 (0)
P81 = 08^1 + «2 + «4 ) P89 = «1G8 («1 + «2 + «4 )
P8,10 = «2 G8 («1 + «2 + «4) P8,11 = «4 G8 («1 + «2 + «4)
P8,12 = G8,12 («1 + «2 + «4 ) P12,8 = m*2 (0)
p20 = p30 = p40 = p51 = p61 = p98 = p10,8 = p11,1 = 1
We may verify that
p01 + p02 + p03 + p04 = 1
p10 + p15 + p16 + p17 + p18 = 1
p81 + p89 + p8,10 + p8,11 + p8,12 = 1
p20 = p30 = p40 = p51 = p61 = p71 = p98 = p10,8 = p11,1 = p12,8 = 1
3.1.3 Mean Sojourn time (^)
If Ti denotes the stay time of the system in state i, then using the following mathematical relationship between ^ and Ti m = f0°° P[Ti > t]dt
values of ^ for all required values of i are found, and the same are provided as:
U0 = f0°° e-(ai+a2+a3)fWT(t)dt m = fo°° e-(ai+a2)tT1 (t) U2 = Us = U9 = bl
U3 = U6 = U10 =
= °_
U7 = U12 = /0°° M2(t)dt V11 = Ti
The unconditional mean time (m^) which the system under consideration takes to move to state j where counting of the time starts as soon as it enters into state i can be obtained using the following mathematical relationship between m^ and qj (t)
mij = f° tqij(t)dt,
values of for all required combinations of i and j thus obtained and given as follows:
U0 = m01 + m02 + m03 + m04 m = mw + m15 + m16 + m17 + mw
U2 = m20 = 111 U3 = m30 = ^
U4 = m40 = y3 U5 = ms1 = f°
U6 = m61 = U7 = m71 = f0°° tm2(t)dt
U8 = m81 + ms9 + m8,10 + m8,n + m8,12 U9 = m98 = 1
U10 = m10,8 = f° U11 = m11,1 = b;
U12 = m12,8 = /0°° tm2(t)dt
4. SysTEm PERfORmANCE Measures
4.1. Mean Time to System Failure
We retain failed states as absorbing states in order to calculate the system's MTSF. Using recursive
relations for fa(t) can be obtained and the same are given as:
Mt) = Q01 (t) © fa(t) + Q02(t) + Q03(t) + Q04(t)
Mt) = Q10(t) © fo(t) + Q15(t) + Q16(t) + Q17(t) + Q18(t) © Mt)
Mt) = Q71 (t) © Mt)
Mt) = Q81 (t) © Mt) + Q89(t) + Q8,10(t) + Q8,11 (t) + Q8,12(t) © fan(t) $12(t) = Q12fi(t) © $8 (t)
By solving these relations for * (s) using the Laplace Stieltjes transformation of these relations, we get
c (s) = NB,
where
N(s) = q8,12 (s)q12,8(s)[(q02 (s) + q*03(s) + q04 (s))(q*17(s)q*71(s) -1) - q01 (s)(qh(s) + q16(s))] + (q02(s) + q03 (s) + q04(s))(1 - q18(s)q'81 (s)) + qi7(s)q71 (s)) + q'01(s)(q'1s (s) + q16(s)) + q*01 (s)q*18(s)(q*89 (s) + q8,10 (s) + q8,n(s))
D(s) = 1 + q01(s)q10(s)q*8/U(s)q*12$(s) - q01(s)q10(s)qi7(s)q71(s)q8,12(s)qi2,8(s) - qi7(s)q71(s) - q18 (s)q*81(s) - q8,12(s)q*12,8(s)
Using above calculated value of fa** (s) , MTSF can be obtained when the system under consideration starts from the state 0 and the same is given as follows:
To = lims^o = N,
where
N = Ц0 [(1 - Pl7 )(1 - p8,12 ) - Pl8 Psi] - Fl Vol P8,12 + F8 Pol Pl8 + F7 [p 18 P8,12 + (1 - P8,u) Pl7 ] D = (1 - P8,12)(l - P01 Pl0 - Pl7) - Pl8P81
4.2. Availabilities in Summer and Winter
During Summer
To determine the availability in summer AS0(t) of the system, recursive relations thus obtained using probabilistic arguments, are given as:
AS0(t) = M0 (t) + q01(t)©AS1(t) + q02(t)©AS2 (t) + q03 (t)©AS3 (t) + q04 (t)©AS4(t)
AS1(t) = q10 (t)©AS0 (t) + q15 (t)©AS5 (t) + qu(t)©AS6(t) + qu(t)©AS7 (t) + q18 (t)©AS8 (t)
AS2(t) = q20 (t)©AS0 (t)
AS3(t) = q30 (t)©AS0 (t)
AS4(t) = q40 (t)©AS0 (t)
AS5(t) = q51 (t)©AS1 (t)
AS6(t) = q61 (t)©AS1 (t)
AS7(t) = q71 (t)©AS1 (t)
AS8(t) = q81 (t)©AS1 (t)+ q89(t)© AS,(t) + qs,10 (t)©AS 10 (t) + q8,u(t)© ASn(t) + q8,12(t)© ASu(t) AS9(t) = q98 (t)©AS8 (t)
AS10(t) = q10,8(t)©AS8(t) AS11(t) = q11,1(t)©AS1(t) AS12(t) = q12,8(t)©AS8(t) where,
M0(t) = e-(a1+a2+a3)tW1 (t)
By solving these relations for AS0 (s) using the Laplace transform of these relations, we get
A C* (s) = N1(s)
AS0(s) = D1(s) where,
N1(s) = M0 (s)[1 - q18 (s)q*11,1(s)q*8,u(s) - q1s (s)q51(s) - qie (s)q*61(s) - q*17(s)q*71(s) - q18 (s)q81(s) - q'89(s)q'98(s) - q8,10(s)q10,8(s) - q8,12(s)q12,8(s) + №5(s)q51(s) + q1e(s)q61(s) + q17 (s)q71(s))(q89 (s)q98(s) + q8,10(s)q10,8(s) + q8,12 (s)q12,8(s))]
D1(s) = [q02 (s)q20(s) + q03 (s)q30 (s) + q04 (s)q40 (s)][qi5(s)q51(s) + qi6 (s)q61(s) + q17 (s)q71(s)
+q18 (s)q*81 (s)+q*89 (s)q*98(s)+q8,10 (s)qi0,8(s)+q8,12 (s)q12,8(s) - 1] + (q*01(s)q*w (s)+q15 (s)qh(s) + q16 (s)q61(s) + q*17 (s)q71(s))(q89 (s)q98(s) + q8,10 (s)q10,8 ~(s) + q8,12(s)q12,8(s) -1) + q18(s) qh,1 (s)q*8,u (s)(q*02(s)q*20 (s) + q*03(s)q*30 (s) + q04 (s)q40(s) -1) + (q*02(s)q*20 (s) + q03 (s)q30(s) + q04 (s)q*40(s))(q*15 (s)qh(s) + q1e (s)q61(s) + q17 (s)q71 (s))(q89 (s)q*98(s) + q8,10 (s)q*10,8(s)
+ q8,12(s)q*12,8(s))
Using above calculated value of AS0 (s) availability in summer can be obtained in steady-state and the same is given as follows: AS0 = lims^0 sAS0 (s) = N where,
N1 = U0 p10 (p81 + p8,11)
D1 = (U0 + U2 p02 + U3 p03 + U4 p04) p10 (p81 + p8,11) + (^1 + U5 p15 + U6 p16 + ^17) p01( p81 + p8,11) + (U8 + U9 p89 + U10 p8,10 + U12 p8,12) p01 p18
During Winter
Similarly, steady-state availability during winter are given as follows:
AW0 = lims^0 sAW0 (s) = N
where,
D1 already defined and
N2 = U1P01 ( P81 + p8,11 )
4.3. Busy Period Analysis Busy period of the repairman due to repair in summer
Similarly, steady-state Busy period of the repairman due to repair in summer are given as follows:
BS0 = lims^0 sBS0 (s) = N-
where,
D1 already defined and
N3 = (U2 P02 + V3 P03 + V4 p04 ) pw( p81 + P8,n) During Winter
Similarly, steady-state Busy period of the repairman due to repair in winter are given as follows:
BW0 = lims^0 sBW0* (s) = N
where,
D1 already defined and
N4 = p01 [ p18 (V9 P89 + m P8,10 + m P811) + (^5 P15 + ^6 P16 )(P81 + P8,u)]
4.4. Expected Number of Visits of the Repairman for Repair During summer
Similarly, steady-state number of visits of the repairman during summer are given as follows:
VS0 = lims^0 sVS0 (s) = § where,
D1 already defined and
N5 = P10(1 - P01)(p81 + P8,n) During Winter
Similarly, steady-state number of visits of the repairman during winter are given as follows:
VW0 = lims^0 sVW0 (s) = §
where,
D1 already defined and
N6 = P01P18(1 - P81 - P8,12) + P01 (1 - P10 - P17 - P18)(P81 + P8,U)
4.5. Expected Number of Visits of the Repairman for Preventive Maintenance
Similarly, steady-state number of visits of the repairman for preventive maintenance are given as follows:
PM0 = lims^0 sPM0 (s) = N where,
D1 already defined and
N7 = p01 P17 ( P81 + p8,11) + P01P18 P8,12
5. Cost-Benefit Analysis
Profit of the system under consideration can be obtained by subtracting the costs due to repair, per visit charges of the repairman for repair in summer and winter and per visit charges of the repairman for preventive maintenance. The same can expressed in terms of the various performance measures obtained through the model developed in this given as follows: Profit = CS0AS0 + CW0AS0 - CS1BS0 - CW1BW0 - CS2VS0 - CW2VW0 - C3PM0 where,
CSo : revenue during summer, per unit uptime
CW0 : revenue during winter, per unit uptime
CS1 : revenue during summer per unit time for repair
CW1 : revenue during winter per unit time for repair
CS2 : Cost per visit during summer for repair
CW2 : Cost per visit during winter for repair
C3 : Cost per visit for preventive maintenance
6. Numerical Interpretation
To obtain various numerical outcomes, the following specific case is used:
wi(t) mi (t) gi (t) U0 = U2 = U4 = U6 = U8 = U10 = U12 = p02 = P04 = P15 = P17 = P81 = P8,10 : P8,12 P20 =
= ae at
= ye-7t
= Ae—At 1
«1+«2+«3+a 1 b1 1 b3 1 b2
_1_
«1+«2+«4+u+y
112
S
«1
«1 +«2+«3+a
«3
«1 +«2+«3+a «1
«1 +«2+«3 + Y+P «3
«1 +«2+«3+Y+P u
«1 +«2+«4+y+u _ «2
«1 +«2+«4+y+u = y
«1 +«2+«4+y+u P30 = P40 = P51
W2(t) m2(t) g2 (t) U1 =
U3 = U5 = U7 = U9 = U11 = P01 =
P03 =
P10 = P16 = P18 =
P89 = P8,11 =
= pe-P
= Se-St
Ue
—y.t 1
«1+«2+«3+p+y h
11 S 1 b1 1 b4
_a_
«1 +«2+«3+a «2
«1 +«2+«3+a
p
«1 +«2+«3+y+p «2
«1 +«2+«3+y+p y
«1 +«2+«3+y+p «1
«1 +«2+«4+y+u
_ _«4_
" «1+«2+«4+y+u
P61 = P71 = P98 = P10,8 = P11,1 = P12,8 = 1
where
«1 = 0.235, «2 = 0.0381, «3 = 0.01589, «4 = 0.02673, b1 = 0.887, b2 = 0.793, b3 = 0.821, b4 = 0.896, a = 0.615, p = 0.83, A = 0.034, y = 0.00937, S = 0.870, u = 0.875, CS0 = 15000, CS1 = 1500, CW0 = 15000, CW1 = 1600, CS2 = 1450, CW2 = 1550, C3 = 1400. Various graphs have been plotted but all the graphs have not been shown here to use minimum space and to avoid repetition of similar interpretations. However, the users of such systems may plot graph of their interest as per the requirement and may take important decision regarding profitability of the system. Regarding the availability and nature of MTSF, various rates have been depicted as shown in Fig. 2 ,3, 4 and 5 which reveal that MTSF, Availability and profit decreases as failure rates increases. However, their values go in the direction S and b2. Some of the plotted graphs are shown as follows:
The MTSF behaviour for different values of p is shown in Fig. 2. MTSF decreases as the failure rate value («2) rises. Higher values of p correspond to higher values in it.
SYSTEM WITH TEMPERATURE DEPENDENT MAINTENANCE Volume 18, December 2023
0.01 0.02 0.03 0.04 005 0.06 0.07 0.08 0.09
Failure Rate (a2)
p=o.i3 —^3=0.33 —^3=0.53
Figure 2: MTSF versus Failure Rate (a2) for different values of (ft)
The availability behaviour in the summer for various repair rate values (b2) is displayed in Fig. 3. As the failure rate (a2) rises, summer availability decreases. Additionally, it has been noted that when b2 values rise, so does availability.
0.15
0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.1
Failure rate (aj
—^b2=0.493 —^b2=0.693 —^b2=0.893
Figure 3: Availability in Summer versus Failure rate («2) for different values of Repair rate (b2 )
The way that profit acts in relation to revenue in the summer (CSq) for various values of the cost paid for repair in the summer (CSi) is shown in Fig. 4. As revenue values rise in the summer (CSq), profit rises as well. Additionally, it has been seen that as (CS1 ) values rise, the profit falls.
2000 1500 1000 500
w p
e£ o
-500 -1000
—^CS1=5500 —^CS1=6000 —^CS1=6500
Figure 4: Profit versus Revenue in Summer (CSo) for different values of cost paid for paid in Summer (CSj)
Fig. 5 illustrates the behaviour of profit in relation to revenue during the winter (CWo) for various costs (C3) associated with preventive maintenance. With an increase in winter revenue values (CWo), profit rises. Additionally, it has been seen that as C3 values rise, the profit falls.
600 400
200 0
S 200 £
-400 -600 -800 -1000
—^C3=5000 —^C3=6000 —m—rp, 7000
Figure 5: Profit versus Revenue in Winter (CWo) for different values of cost (C3) paid for paid for Preventive Maintenance
Values of parameters taken and cut-off points obtained from the above figures are tabulated
as follows:
Fig Varied Parameters Condition Interpretation
4 CSi = 5500 CSi = 6000 CS1 = 6500 CS0> 11700.3105 CS0> 13059.0062 CS0> 14417.1842 System is profitable System is profitable System is profitable
5 CW1 =5000 CW1 =6000 CW1 =7000 CW0>15261.2412 CW0>16863.2744 CW0>18465.3067 System is profitable System is profitable System is profitable
7. CONClUSiON
In the current study, a reliability model is developed using a system for producing utensils. The findings for a specific situation demonstrate the relevance of research since cut-off points may be used to set lower and upper limits for a variety of factors. For instance, setting a product's pricing so that the system is profitable depends on the cut-off point for revenue per unit uptime. The cut-off points facilitate many crucial judgments for the profits according to revenue.
FUNdiNg
The first author delightedly acknowledges the University Grants Commission (UGC), New Delhi, India for providing financial support.
DiSClOSURE STATEmENT The authors declare that they have no conflict of interest.
REfERENCES
[1] Teng, X., Pham, H. and Jeske, D.R., (2006). Reliability modeling of hardware and software interactions, and its applications. IEEE Transactions on Reliability, 55(4): 571-577.
[2] Yusuf, B. and Yusuf, I., (2013). Evaluation of some reliability characteristics of a system under three types of failures with repair-replacement at failure. American Journal of Operational Research, 3(3): 83-91.
[3] Manocha, A. and Taneja, G.,(2015). Stochastic analysis of a two-unit cold standby system with arbitrary distribution for life, repair and waiting times. International Journal of Performability Engineering, 11(3): 293-299.
[4] Gupta, P., Lal, A.K., Sharma, R.K. and Singh, J., (2016). Numerical analysis of reliability and availability of the serial processes in butter oil processing plant. International Journal of Quality and Reliability Management, 22(3): 303-316.
[5] Fagge, N. J., Yusuf, I. and Ali, U. A., (2017). Availability evaluation of repairable system requiring two types of supporting device for operations. International Journal of Applied Mathematical Research, 6 (1): 14-19.
[6] Rajesh, Taneja, G. and Jagdish, P., (2018). Reliability of a gas turbine system with change in weather and optimisation of electricity price when working in single cycle. Int. J. Agricult. Stat. Sci., 14(1): 119-128.
[7] Kumar, A. and Malik, S. C., (2014). Stochastic modeling of a concrete mixture plant with preventive maintenance. An International Journal of Applications and Applied Mathematics,09(1): 13-27.
[8] Rajesh, Sangal, P. K., Himani and Taneja, G.,(2020). Reliability and profit analysis of a gas turbine system with optimisation of electricity price of single cycle for different cut-off points. Int. J. Agricult. Stat. Sci., 16(1): 2143-2150.
[9] Jain, P., Pawar, D. and Malik, S.C., (2022). Profit analysis of A 1- out Of 2 unit system with a standby unit and arrival time of server. Int. J. Agricult. Stat. Sci.,18(1): 29-33.
[10] Rahbi, Y., Rizwan, S. M., Alkali, B. M., Cowell, A. and Taneja, G., (2018). Reliability analysis of rodding anode plant in an aluminum industry with multiple repairmen. Advances and Applications in Statistics, 53(5): 569-597.
[11] Sheetal, Singh, D. and Taneja, G., (2019). A reliability model for a system with temperature-dependent working and time-dependent payment for major fault. Journal of Advance Research in Dynamical & Control system, 11(01): 1189-1196.
[12] Sheetal, Taneja, G. and Singh, D., (2018). Reliability and profit analysis of a system with effect of temperature on operation. International Journal of Applied Engineering Research, 13 (7): 4865-4870.
[13] Sachdeva, K., Taneja, G., and Manocha, A., (2022). Sensitivity and economic analysis of an insured system with extended conditional warranty. Reliability: Theory & Applications,315-327.
[14] Rizwan, S. M., Sachdeva, K., Alagiriswamy, S. and Al Rahbi, Y., (2023). Performability and Sensitivity Analysis of the Three Pumps of a Desalination Water Pumping Station. International Journal of Engineering Trends and Technology, 51(2): 283-292.
[15] Rizwan, S. M., Sachdeva, K., Al Balushi, N., Al Rashdi, S., and Taj, S. Z., (2023) Reliability and Sensitivity Analysis of Membrane Biofilm Fuel Cell. International Journal of Engineering Trends and Technology, 71(3): 73-80.
[16] Singh, J., and Mahajan, P., (1999). Reliability of utensils manufacturing plant-a case study. Opsearch, 13(24): 260-269.
[17] Kumar, K. and Kumar, P., (2010). Mathematical modelling and analysis of stainless-steel utensils manufacturing plant using fuzzy reliability. International Journal ofEngineering Science and Technology, 2(6): 2370-2376.