Научная статья на тему 'Reliability and Sensitivity Analysis of Two Non-Identical Unit Standby System Subject to Pre-operation Random Inspection of Standby Unit'

Reliability and Sensitivity Analysis of Two Non-Identical Unit Standby System Subject to Pre-operation Random Inspection of Standby Unit Текст научной статьи по специальности «Медицинские технологии»

CC BY
156
36
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
Reliability / Pre-operation random inspection / Cost-benefit analysis / Bounds / Sensitivity analysis

Аннотация научной статьи по медицинским технологиям, автор научной работы — Amit Manocha, Anil Kumar Taneja, Gulshan Lal Taneja

This paper examines the stochastic behavior of standby redundant system having two non-identical units. The system comprised of main unit and non-identical cold standby unit. When the main unit collapses, standby unit is exposed to operable conditions. Due to long-time and non-use of standby unit, though with small chances, it is observed that standby unit gets corrupt and becomes inoperable even in standby mode. Further, it demands repair/maintenance to make it worth-operating. Henceforth, it is considered to perform random inspection of standby unit to ensure that whether it is in operable condition or not. Inspection as well as repair both the tasks are performed by single repair facility. semi-Markov and regenerative processes are applied to derive expressions for the system performance indices. Profit function and bounds (upper/lower) for various costs involved are evaluated. Numerical study has been performed to illustrate the behavior of model developed. Sensitivity and relative sensitivity analysis has also been done for MTSF and steady-state availability.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Reliability and Sensitivity Analysis of Two Non-Identical Unit Standby System Subject to Pre-operation Random Inspection of Standby Unit»

Reliability and Sensitivity Analysis of Two Non-Identical Unit Standby System Subject to Pre-operation Random Inspection of Standby Unit

Amit Manocha •

Department of Applied Sciences, TITS Bhiwani, Haryana, India amitmanocha80@yahoo.com

Anil Kumar Taneja* •

Department of Mathematics, Galgotias University, Greater Noida, UP, India

draniltanejagu@gmail.com Gulshan Lal Taneja

Department of Mathematics, Maharshi Dayanand University, Rohtak, Haryana, India

drgtaneja@gmail.com

Corresponding Author Abstract

This paper examines the stochastic behavior of standby redundant system having two non-identical units. The system comprised of main unit and non-identical cold standby unit. When the main unit collapses, standby unit is exposed to operable conditions. Due to long-time and non-use of standby unit, though with small chances, it is observed that standby unit gets corrupt and becomes inoperable even in standby mode. Further, it demands repair/maintenance to make it worth-operating. Henceforth, it is considered to perform random inspection of standby unit to ensure that whether it is in operable condition or not. Inspection as well as repair both the tasks are performed by single repair facility. semi-Markov and regenerative processes are applied to derive expressions for the system performance indices. Profit function and bounds (upper/lower) for various costs involved are evaluated. Numerical study has been performed to illustrate the behavior of model developed. Sensitivity and relative sensitivity analysis has also been done for MTSF and steady-state availability.

Keywords: Reliability, Pre-operation random inspection, Cost-benefit analysis, Bounds, Sensitivity analysis

1. Introduction

Technological advances in recent decades have paved the way for numerous complicated and sophisticated systems. The ever increasing tech savvy inclination of consumers urges industries to introduce automation in their industrial process. Therefore, the need of hour is reduction in failures, availability and improvement in operational capacity of such systems. Redundancy is technique by which a system can be made highly reliable. Standby redundant systems have been used at a large scale in automation industry especially in computer and network, telecommunication and power systems. The two unit standby system and the various issues

arising during the usage of such systems like switch over and activation time of standby unit, imperfect switching, random change of standby unit etc. have been addressed very extensively by several researchers. A standby system with switching device for activating standby unit and repaired failed unit for operations was investigated by Singh and Singh [1]. Mokaddis et al. [2] analyzed reliability models for standby system. Different working modes of the operative unit were taken into account. The perfect or imperfect switching of standby unit by assuming arbitrary distributions for failure and repair times were also studied.

Considering the activation time of standby unit, economic study of two-unit standby system was performed by Gupta et al. [3]. El-Said and El-Sherbeny [4] investigated profitability function for standby system, wherein the operative and standby unit interchanged randomly. Parashar and Taneja [5] analyzed stochastically hot standby PLC system. The study was carried out by collecting real data from various industries. Imperfect switching of standby unit as well as repairman patience time was studied by Rashad et al. [6]. A standby system with different failure types was discussed by Mahmoud and Mosherf [7].The preventive maintenance of online unit was also done when its operative time reaches to time t, subject to the availability of standby unit. Mathew et al. [8] analyzed two-unit working in parallel configuration casting plant system. Different kinds of failures were taken into the consideration. Jain and Rani [9] used Markov process to obtain availability characteristics for the standby system having switching failure and reboot delay. Manocha and Taneja [10] discussed two stages of repair for standby system. Jia et al. [11] compared perfect and imperfect switching policies for standby system. Barak et al. [12] investigated standby system, in which inspection of failed standby unit was conducted to confirm its reparability status. Wang et al. [13] investigated a warm standby system. The failures due to hardware and human errors were considered in their study and priority in use was given to main unit. Profit analysis was not done by the authors. El-Sherbeny et al. [14] discussed the idea of change between active unit and standby unit after random amount of time. Eventually, it can be concluded that certain technical issues that affect operational capacity of the system needs to be addressed as a prerequisite for standby units. Keeping this in view, the present article examines a two non-identical unit cold standby system, wherein standby unit may be inspected randomly to see as to whether it is worth useable or not. Sensitivity analysis with regard to MTSF and availability has also been done.The present paper is organised as follows.

System description and assumptions made to carry out the analysis are given in Section 2.Notations, different states and method used in the study are cited in Section 3, 4 and 5 respectively.In Section 6 stochastic model for the system (as defined in Section 2) is developed. Explicit expressions for different performance denoting characteristics of the system, profit and sensitivity function are derived in Section 7, 8 and 9 respectively. Numerical discussions are made in Section 10. Concluding remarks are stated in Section 11.

2. System Description and Assumptions

Proposed system consists of operative main unit and non-identical cold standby unit. Whenever, main unit get fail, the standby unit starts working and main unit goes for repair. There is a possibility that due to long-time non-use of standby unit in non-operative mode, it may be degraded and may become inoperable. The standby unit is inspected randomly to check either it can be made operable or it is inoperable due to degradation. Immediately the inoperable standby unit goes under repair/maintenance of the repairman. The repair process follows the first-come-first served (FCFS) rule. A single repair facility is considered for the system which takes cares of repair as well as inspection related activities. We use regenerative and semi-Markov process to obtain the various performance indicating characteristics of the system like Reliability, MTSF, point wise and transient availability, expected number of visits and time taken by repairman for repairing/inspecting the units. Finally these measures are used to formulate the profit and sensitivity function.The life time distribution of both the units is taken as exponential, whereas other time distribution are considered general. After each repair, unit is supposed to works like new one. The random variables used in developing stochastic model are independent.

3. Nomenclature

The notations for various rates/probabilities/pdf/states are:

A/a: failure rate of main/standby unit

p/q: probability of operable/inoperable standby unit

pi/qi: probability of operable/inoperable standby unit after random inspection WiF/Wh: P[repairman is engaged in regenerative state i for repair/inspection at instant t

without switching to any other state] ®/ ©: symbol of Stieljes/ Laplace convolution. E0: Initial state of system

g(t)(G(t))/gi(t)(Gi(t)): pdf (cdf) of repair time of main / standby unit h(t)(H(t))/i(t)(I(t)): pdf (cdf) of time to/ time of inspection of standby unit

qij(0(^(0)/Qij(t)(Q\k'(t)): pdf/cdf of transition time from regenerative state i to j (or via

non-regenerative state k). Refer [5] for rest of the nomenclature used in the study

4. State of the System

The various states of the system at certain time point are described as:

State 0:(Mo,S) State 3:(Mr, So) State 6:(Mwr,Sr)

State 1:( Mo, Si ) State 4:(Mwr, SI) State7:( MR, Swr )

State 2:(Mr, Swr) State 5:(Mo, Sr) State 8:(Mwr, SR)

where,

Mo: main unit is operative

S: standby unit

Si: standby unit is under inspection

Mr: main unit is under repair

Swr: standby unit is inline to get repaired

So: standby unit is operative

Mwr : main unit is waiting for repair

Si : Inspection of standby unit is continued from last state

Sr: repair of standby unit is in progress

MR: repair of main unit is in progress from last state

SR: repair of standby unit is in progress from last state

5. Material and Methods

The time point at which system conditions are no longer relevant to system situation before to that time point are referred to as regenerative point, and the corresponding state is known to it as regenerative state otherwise non-regenerative state. In the model being discussed, when the repair/inspection is considered from previous state, the state is non-regenerative. The repair/inspection time distribution has been taken arbitrary; whereas the state where operation is continued from the previous state is the regenerative state as the failure time has been considered to follow exponential distribution which has the memory less property. Therefore the process is not purely Markov and hence semi-Markov (Branson and Shah[15]) process and regenerative process (Srinivasan and Gopalan [16]) have been used.

6. Stochastic Model

The transition between various states as described in Section 4 are shown in Fig.1. The state space is £=(0,1,2,3,4,5,6,7,8), where Q=( 2,6,7,8) and <= (4) are failure and down state space respectively. By definition of regenerative process and assumptions made the sets w=(0,1,2,3,5,6) and w=(4,7,8) represents set of regenerative and non-regenerative states respectively. The transition densities

Figure 1: State transition diagram

from state i to j (or via k) are:

q01(t) = e-Mh(t), q02(t) = Aqe-MH (t), q03(t = Ape-MH (t)

qw(t) = P1 e-Mi(t), №(t) = p1(Ae-xt©1)i(t), q15(t) = qx e-Mi(t)

q16)(t) = q1 (\e-M ©1)i(t), q25(t) = g(t), q30(t) = e-atg(t)

q37(t) = ae-atG(t), q%(t) = (ae-at ©1)g(t), q 50 (t = e-Mg1 (t)

q{S(t) = (\e-xt©1)g! (t), q58(t) = Ae-xtG1 (t), q63(t = g1 (t)

Mean sojourn time (u) in state i € w is

U0 U3

Further, defining and

e- H(t)dt, ui = j e- I(t)dt, U2

G(t)dt

e- G(t)dt, u5 = e-MG1 (t)dt, u6 = G1(t)dt Jo Jo

TO

mij = E(qij (t)) = J tqj (t)dt mf= E(qf(t)) = [ tqf(t)dt

(1)

(2)

(3)

TO

TO

TO

0

TO

TO

TO

(5)

we have,

moi + mo2 + mo3 = yo, mw + mi5 + m^ + m^ = Ki(say)

m25 = y2, m3o + m37 = y3

, (7)

m3o + m35 = y2, m5o + m58 = y5

, (8)

m5o + m53 = y6, m63 = y6

7. System Performability Measures

7.1. System Reliability

If mfi(t) represents the cdf of time, taken by the system to transit from state i, i € w to a failed state, then from transition diagram we have

mfo(t) = Qo1 (t)®mf1 (t) + Qo3(t)®mf3 (t) + Qo2 (t) (6)

mf1 (t) = Q1o(t)® mfo(t) + Q1t)(t)®mf3(t) + Q15(t)®mf5(t) + Q14)(t) (7)

mf3 (t) = Q3o(t)®mfo (t) + Q37M (8)

mf5 (t) = Q5o(t)®mfo (t) + Q5»(t) (9)

Making use of Laplace-Stieljes transformation for eqns. (6)-(9),the expressions obtained for mfo* (s), reliability{R(t)} of the system and MTSF (mean time to system failure) are

mfo* (s) = L(s)/D(s) (1o)

R(t) = L-1 {1 - mf0**(s)/s} (11)

p TO

MTSF = R(t)dt = L/D (12)

o

where

L(s) = Q01 (sMQ^** (s)Q37 (s) + Q15 (s)Q58 (s) + Q^** (s)} + Q03(s)Q37 (s) + Q02(s) (13)

D(s) = 1 - Q0*(s){Q10(s) + Q143)**(s)Q30(s) + Q«(s)Q5o*(s)} - Q03(s)Q3*o(s) (14)

L = yo + po1 K1 + (po1 pg + po3 )y3 + po1 p15y5 (15)

D = 1 - po1 p10 - po1 p143 p30 - po1 p15p50 - po3p30 (16)

7.2. System Availability

Let Wj(t)= P[system is in operative state i,i € w, instead of transferring either to any state j, j € w or to itself via state k, k € w], Then

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Wo (t) = e-MH (t) (17)

W1(t) = e-MI (t) (18)

W3 (t) = e-atG(t) (19)

W5 (t) = e-MG1(t) (20)

Defining AVi(t)=P[system is operative at instant t | E0 = i, i € w]. Referring to contentions of regenerative process and from transition state diagram, the availabilities AVi(t) satisfies the relations

AVo (t) = Wo(t) + qo1©AV1 (t) + qo2©AV2 (t) + qo3©AV3 (t) (21)

AVi (t) = Wi (t) + qio©AVo (t) + q$ ©AV3 (t) + q£ ©AV6(t) + qis©AV5 (t) (22)

AV2 (t) = q25© AV5 (t) (23)

AVz(t) = W3(t) + q30© AVo(t) + q$)©AV5(t) (24)

AV5(t) = W5(t) + q50© AVo(t) + q®©AV3(t) (25)

AV6 (t) = q63© AV3 (t) (26) Using Laplace transformation and method of determinants for eqns. (21)-(26), we obtain

AVq (s) = Li(s)/Di(s) (27)

The system's transient and steady-state availability are

AVo (t) = L-1{Li(s)/Di (s)} (28)

AVm = lim AVo(t) = limsAVo*(s) = Li/Di (29)

t^M s^o

where,

Li(s) = {i - q3f(s)q5l) *(s)}{Wo* (s) + qoi (s)W* (s)} + ^ (s^*^ (s) + q*o3(s)

+ q*oi (s)q((3 *(s)}№ (s) + q£ *(s)W* (s)} + ^ (s)qi5 (s) (3o)

+ qo2 (s)q25(s)}{q53) *(s)Wi (s) + W| (s)}

Di(s) = {i - q3f(s)q5f (s)}{i - qoi(s)q*w(s)} - qo2(sfe(s)q5o(s) - qoi(s)qh(s)q*5o(s) - q'3o(s)Wo3(s) + q'o3(s)qS* (s)q5o(s) + qoi (s)q($ * (s) + qoi(s)qi5 (s)q(S* (s) (3i) + q*oi(s)q*25(sWS*(s)}- q*oi(s)q!6* (s)q*63(s){q3o(s) + q£*(s)q5o(s)} Li = (i - p35)P{S)(Vo + poim) + {poi(pU + pi6 + pi5p583)) + po3 + po2p53}V3 + {poi(pi3p375)

+ pi? p35) + po3p375) + pi5 ) + po2p25 }^5

(32)

Di = (i - p375)ps3))(Fo + poiKi + poim) + (i - poipio - poipi5p5o - po2p5o)m + {(i - poipio)p35) + po2p3o + poipi5p5o + pi^)(i - p35)p583))}^6

(33)

Employing the same procedure as discussed in Sub-section 7.2, other performability measures of the system are as follows:

7.3. Busy Period Analysis 7.3.1 Expected Time for Repairing the Failed Unit

Let Bi(t)=P[repairman is engaged in repair at instant t | Eo = i, i € wj.The expected time taken by repairman in repairing the failed unit is

Bm = lim Bo(t) = limsBo*(s) = lims{L2(s)/Di(s)} = L2/Di (34)

t^M s^o s^o v '

where,

Li(s) = {i - q{£*(s)q53*(s)}{q*oi(s)qi6*(s)W**F(s) + qo2(s)W*F(s)} + q*oi(s)ql5(s)q{S*(s)

+ {qo3 (s) + qoi (s)qi4)*(s)q63 (s) + q*oi(s)q{£ *(s)}W (s) + q<S*(s)W*F (s)} (35)

53

+ qo2 (s)qh (s){q(S*(s)WtF (s) + W*f (s)}

L2 = poi{(pi3 + pu)(P2 + p35) V6 ) + pi5 p53) + (i - p35) pS)^6 } + po2{(i - p^ p^K

+ p583) + H6} + po3(m + p375) F6)

7.3.2 Expected Time for Inspection of the Standby Unit

Letting I (t) =P[repairman remains involved in inspection at time t | E0 = i, i £ wj.The expected time for which standby unit is under inspection, in steady-state is

Im = lim Io(t) = limsI0*(s) = lims{L3(s)/D1(s)} = L3/D1 (37)

t^w s^0 s^0 v '

where,

L3 (s) = q0i(s){i - q35)* (s)q{S* (s)№i (s) (38)

L3 = P0i{1 - p35P(S}Ki (39)

7.4. Expected Number of Visits by the Repairman

If M(t) denotes the expected number of visits by repairman in the time interval (0,t] then NVi(t)= E{M(t) | E0 = i, i £ o>}. In steady-state, the number of visits are

NVm = lim NV0(t) = limsNV0"(s) = lims{L4(s)/D1 (s)} = L4/D1 (40)

t^-w s^0 s^0 v '

where,

L4(s) = {Q01 (s) + Q03 (s) + Q03 (s)}{1 - Q3?" (s)Q^** (s)} (41)

L4 = (1 - pgP®) (42)

D^^(s) and D1 are specified in eqns. (31) and (33) respectively. Now, derived indexes are used to perform cost-benefit analysis in the succeeding section.

8. Cost-Benefit Analysis

As we know, the profit for any manufacturing system is the difference of expected revenue and expected recurring cost.Utilizing eqns.(29), (34), (37) and (40), the profit function for the defined system, in steady-state, is

Pm = (R0AVm) - (CbBm + CIIm + CVVm) (43)

where,R0=Revenue generated per unit time

CB/CI = Recurring cost per unit time for repairing/inspecting the units CV = Recurring cost at per visit of repairman

For the system to be profitable, the eq.(43) is used to obtain the bounds for revenue/cost(s), which are shown in Table 1.

Table 1: Bounds for revenue and various cost(s)

Revenue/Cost Bound Value

Ro Lower (CbBm+CIIm+CvVœ )/AVoo

Cb Upper (Ro AV«, -CiIœ -CvVoo )/B«,

Ci Upper (Ro AVM-CbBm—CvV»)/I«,

Cv Upper (Ro AV«,—CbBœ—CiIœ)/Voo

9. Sensitivity and Relative Sensitivity Analysis

Sensitivity analysis is performed to find out how the variation in incoming variable affects the specific outgoing variable under certain specific conditions. Since, there is significance difference between the values of incoming variables, so to compare their effects on outgoing variables, relative sensitivity function is used. Relative sensitivity function is defined as percentage change that results from the percentage change in one of the variable. The sensitivity and relative sensitivity functions for MTSF and availability (AVM) are formulated as:

d MTSF

nk = „ (44)

k

Sk = n(—) (45) d AVm

Pk = (46) k

Tk = Pk (^) (47)

where k = A, a, fi, 7, 9.

10. Results and Discussion

In this section numerical analysis is done to illustrate the developed stochastic model.Input/Output variables are specified in the subsections 10.1 and 10.2 respectively for further discussions.

10.1. Input Variables

The repair time of main/standby unit, time to inspection and time for inspection of standby unit

are supposed to be exponential with parameters fi,fi1,9 and 7 respectively. Then

G(t) = 1 - exp(-fit),G1 (t) = 1 - exp(-fi11), H(t) = 1 - exp(-dt) and I(t) = 1 - exp(-yt).

Time (t) and various rates/cost(s) are our input variables and their values are taken as:

A = 0.001, a = 0.008, p = 0.98, q = 0.02, p1 = 0.95, q1 = 0.05, = 0.85,7 = 10, fi = 0.65,9 = 0.004

R0 = 40, CB = 5000, CI = 2000, CV = 2000.

10.2. Output Variables

Measures including reliability, MTSF, availability, profit and sensitivity functions are output

variables as obtained in sections 7, 8 and 9 respectively. Variations in output variables caused by changes in input variables have been investigated and are discussed in the following subsections.

10.3. Trend of Reliability{R(t)} w.r.t. time(t) for varying A

Taking the other parameter constant, as mentioned in subsection 10.1, the mathematical expressions for reliability {R(t)} of the system for varied A are as follows: For A = 0.001

R(t) = 0.991602 + 2.14908 x 10-10e-1a001f - 3.11 x 10-7e-a85122f - 1.81 x 10-5e-a658973t

+ 0.00841596e-a00382477f (48)

For A = 0.002

R(t) = 0.983342 + 4.29906 x 10-10e-1°.°02f - 6.23 x 10-7e-a852221f - 3.6 x 10-5e-a659946f

(49)

+ 0.016695e-a00385044f ( )

For A = 0.003

R(t) = 0.975214 + 6.4499 x 10-10e + 0.0248404e-a00387604t

10„-10.003f

— 9.37 x 10 e

70.853222t

— 5.4 x 10-5e

5^-0.660919f

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

(50)

Fig.2 shows the trends of system reliability {R(t)} for varied (t, A). Clearly, it goes down with the rise in the values of variables t and A respectively.

Figure 2: Reliability {R(t)} w.r.t time (t)

10.4. Trend of MTSF and Availability (AVx) for varying rates

The numerical values of MTSF and availability (AVx) are obtained for (A, ft) and (d, 7) respectively. The other parameters are kept fixed as assumed in subsection 10.1. The results are tabulated as in Table 2 and 3 respectively. It is noted that,

(i) MTSF decreases as A increases. However, it increases as ft increases.

(ii) Availability (AVM) increases with the increase in both the parameters d as well as 7.

Table 2: MTSF w.r.t. A for varied ft

A MTSF

ft=0.55 ft=0.65 ft=0.75

0.0010 29215.21 31146.55 32740.61

0.0011 26563.96 28319.28 29768.06

0.0012 24354.58 25963.23 27290.93

0.0013 22485.11 23969.64 25194.91

0.0014 20882.71 22260.85 23398.31

0.0015 19493.96 20779.90 21841.26

0.0016 18278.80 19484.07 20478.85

Table 3: AVM w.r.t. 9 for varied 7

9 AVm

7=3 7=5 7=10

0.0020 0.9999343 0.9999346 0.9999348

0.0024 0.9999354 0.9999358 0.9999360

0.0028 0.9999364 0.9999369 0.9999371

0.0032 0.9999372 0.9999377 0.9999380

0.0036 0.9999379 0.9999384 0.9999387

0.0040 0.9999384 0.9999390 0.9999394

10.5. Trend of Profit function (PM) for varying rates/costs

The trend of profit function (PM) with respect to R0 for varied fi and CB for varied R0 is revealed by Fig.3 and Fig.4 respectively.Evidently,

(i)With the increase in R0 and fi, PM increases.

(ii)With the increase in CB, PM decreases but increasing trend of PM is observed with increase in

R0.

Ro

Figure 3: PM versus R0 for varied fi

cB

Figure 4: PM versus Cb for varied R0

Bearing economic viability of the system in mind, the bounds obtained for Ro and Cb are

shown in Table 4.

Table 4: Bounds for revenue/cost

Revenue/Cost Varied Bounds For

Parameter Profitability^ > 0)

ß=0.55 R0>54.69

Ro ß=0.65 R0>51.90

ß=0.75 R0>49.86

R0=30 CB<2202.7

Cb R0=40 CB<3479.5

R0=50 CB<4756.8

10.6. Numerical calculations for sensitivity analysis

Using the values of incoming variables (as considered in subsection 10.1) Table 5 and 6 represents the values of sensitivity and relative sensitivity functions (defined in section 9) for MTSF and AV. respectively.

Table 5: Sensitivity and Relative sensitivity of MTSF w.r.t. different rates

Variable MTSF

(k) nk=№ 4 = nk ( mTsf )

A a ß ßi Y 9 -8174507 -685533 8710.824 129.51 0.567 -28955 -1.048 -0.352 0.363 0.007 0.0004 -0.0074

Table 6: Sensitivity and Relative sensitivity of availability (AV.) w.r.t. different rates

Variable Availability (AV.)

(k) n, = dA™. Pk = dk Tk = pk(At)

A a ß ßi Y 9 0.0012 -0.0056 0.0002 -0.0001 2.71 x 10-8 0.0014 2.4 x 10-6 -4.5 x 10-5 1.4 x 10-4 -1.06 x 10-4 1.4 x 10-7 5.6 x 10-6

Considering the absolute values of defined functions, Table 5 and Table 6 reveals that the MTSF is more sensitive with respect to failure rate of main unit A whereas AV. is impacted more by failure rate of standby unit a. However, the order of incoming variables in which they influence the MTSF and AV.. is: MTSF: A > a > 9 > $ > $1 > j. AV. : $ > $1 > a > 9 > A > y.

11. Conclusion

This article proposes a probabilistic model for two non-identical units' standby system in which standby unit may be inspected randomly to ensure its operability. Various performability indices are derived. Keeping the cost factor in mind, bounds (lower/upper) for various costs are obtained to account for economic and budgetary constraints. The numerical study has been carried out for exponential case. Sensitivity analysis is performed for MTSF and steady-state availability of the system. The developed model is quite lucrative for any commercial/industrial establishment using such systems, in their production and operational commitments.

Funding

This research received no specific grant.

Disclosure statement The authors declare that they have no conflict of interest.

References

[1] Singh, S.K. and Singh, R.P. (1989). Two unit standby system with imperfect switching device and maximum activation time. Microelectronics Reliability, 29(5): 717-720.

[2] Mokaddis, G.S., Labib, S.W. and El-Said, KH.M. (1994). Two models for two-dissimilar-unit standby redundant system with three types of repair facilities and perfect or imperfect switch. Microelectronics Reliability, 34(7): 1239-1247.

[3] Gupta, R., Tyagi, V. and Tyagi, P. (1997). Cost-benefit analysis of a two-unit standby system with post-repair,activation time and correlated failures and repairs. Journal of Quality in Maintenance Engineering, 3(1): 55-63.

[4] El-Said, K.M. and El-Sherbeny, M.S. (2005). Profit analysis of a two unit cold standby system with preventive maintenance and random change in units. Journal of Mathematics and Statistics, 1(1): 71-91.

[5] Parashar, B. and Taneja, G. (2007). Reliability and profit evaluation of a PLC hot standby system based on a master- slave concept and two types of repair facilities. IEEE Transactions on Reliability, 56(3): 534-539.

[6] Rashad, A.M., El-Sherbeny, M.S. and Hussien, Z.M. (2009). Cost analysis of a two-unit cold standby system with imperfect switch, patience time and two type of repair. Journal of the Egyptian Mathematical Society, 17(1): 65-81.

[7] Mahmoud, M.A.W. and Moshref, M.E. (2010). On a two-unit cold standby system considering hardware, human error failures and preventive maintenance. Mathematical and Computer Modelling, 51: 736-245.

[8] Mathews, A.G., Rizwan, S.M., Majumdar, M., Ramchandarann, K.P. and Taneja, G. (2011). Reliability analysis of identical two unit parallel CC plant system operative with full installed capacity. International Journal of Performability Engineering, 7(2): 179-187.

[9] Jain, M. and Rani, S. (2013). Availability analysis for repairable system with warm standby, switching failure and reboot delay. International Journal of Mathematics in Operational Research, 5(1): 19-39.

[10] Manocha, A. and Taneja, G. (2015). Stochastic analysis of a two-unit cold standby system with arbitrary distribution for life, repair and waiting times. International Journal of Performability Engineering, 11(3): 293-299.

[11] Jia, X., Chen, H., Cheng, Z. and Guo, B. (2016). A comparison between two switching policies for two-unit standby system. Reliability Engineering and System Safety, 148: 109-118.

[12] Barak, M.S., Yadav, D. and Kumari, S. (2018). Stochastic analysis of a two-unit system with standby and server failure subject to inspection. Life Cycle Reliability and Safety Engineering, 7:23-32.

[13] Wang, J., Xie, N. and Yang, N. (2019). Reliability analysis of a two dissimilar unit warm standby repairable system with priority in use. Communications in Statistics- Theory and Methods, 50(4): 792-814.

[14] El-Sherbeny, M.S. (2017). Stochastic behavior of a two-unit cold standby redundant system under poisson shocks. Arabian Journal for Science and Engineering, 42: 3043-3053.

[15] Branson, M.H. and Shah, B. (1971). Reliability analysis of systems comprised of units with arbitrary repair time distributions. IEEE Transactions on Reliability, 20(4): 217-223.

[16] Srinivasan, S.K. and Gopalan, M.N. (1973). Probabilistic analysis of a two-unit system with a warm standby and a single repair facility. Operations Research, 21(3): 748-754.

i Надоели баннеры? Вы всегда можете отключить рекламу.