Reliability and Performance Analysis of a Complex Manufacturing System with Inspection facility using
Copula Methodology
xSurabhi Sengar, 2Mangey Ram
*G.B. Pant University of Agriculture & Technology, Pantnagar, Uttarakhand. India 2Graphic Era deemed to be University, Dehradun, Uttarakhand, India [email protected], [email protected]
Abstract
This paper deals with the assessment of various reliability factors of a real-life manufacturing system having inspection facility. This multistate manufacturing system have five workstations those are connected in series configuration as: Wi, Wi, W?,, Wi, W5. Workstations W2 and W4 has the configuration 2-out-of -3: G and 1-out-of-3: F. Due to failure of the any of the workstation, whole manufacturing system can completely fail. Apart from this machine failure can also make system down. To avoid sudden failure in the system pre-emptive maintenance strategy has been adopted. This is a corrective maintenance action before a failure occurs and scheduled during off days. Risk analysis is done because of fault of W5 workstation in material quality inspection. Probability distributions like exponential time distribution is followed by all failures and general time distribution by all repairs. To study the probabilistic behavior of the system in different possible transition states, Markov process have been used. Supplementary variable technique and copula method of finding joint probability distribution have been used to obtained various reliability features such as steady state behavior of the system, reliability function, availability, Mean time to failure, sensitivity analysis and profit analysis.
Keywords: Reliability analysis, Mean time to failure, Availability, Sensitivity analysis, Risk analysis
1. Introduction
Nowadays, Due to the globalization of the market and business, a lot of problems related to manufacturing industries like delays in product delivery, machine failure, cancellation of demand, etc. are encountered by the industries daily. Therefore, reliability and availability analysis are important for the performance analysis of discrete manufacturing systems. A lot of work has been done to discuss reliability measures of manufacturing systems using different approaches [1, 3, 5, 6 and 7]. Here, a concept of making a methodical approach to analyze a failure-free system for a manufacturing industry is developed for a practical period [9].
The objective of this work is to assess the performance and risk analysis of a manufacturing system under different operating conditions. This multistate manufacturing system contains five workstations that are connected in the series configuration as Wi, W2, W3, Wi, and Ws. Workstation Wi consists of the raw material supplied by a merchant or vendor for making finished goods. At workstation W2 material provided by workstation Wi is transformed into welded usable form and small and big components are used to make the final product. Later on, these welded components
are sent to workstation W3 for the dye or tint process. Workstation W4 plays a vital role in this complex manufacturing system as the finished product assembles here only by connecting and arranging equipped components in logical order received from workstation W3. At last, before
sending the finished product to suppliers in the market, it goes through the inspection process at workstation W5 for quality inspection. On the workstations W2 and W4, three machines are involved in performing the same task connected parallelly. These workstations follow 2-out -of-3:G and 1-out-of-3:F conformations, which means that for the fully operational stage of the system in which it can achieve the required target, it is essential that at least two machines of workstation W2 and W4 are in working condition otherwise in the opposite case the system fails [2]. Along with this, Machine failure is also considered which may be major or minor. To get maximum reliability, two groups of repairmen are involved in repairing the system according to their knowledge and skills. Here, a joint probability distribution is obtained using copula methodology when both groups are involved in repairing the system at the same time [4 and 8]. After getting finished goods, product inspection is done by workstation W5. Here, any fault or ignorance in the inspection of the product can take the system into a risk state that can cause system failure. For example, if a technical fault is there in final assembled product due to wrong assembly or material use which can result in a failure after a certain period of use of the product or in certain climatic conditions, also the product have been not tested for that period or under that climatic conditions. The transition state diagram and state specification of the considered system are shown in figure-1 and table-1 respectively. The figure-1 shows positive transition intensities, and the transition probabilities for time A are proportional to the intensities, the remaining transition probabilities for time A are equal to o (A).
2. Notations
Po(t)
Denotes Probability at time t when the system is in initial state So
Pi (k, t)
Denotes the probability of system getting in breakdown state because of failure of the ith workstation at time t, also elapsed repair time considered in between k and k+D, where i= 1, 2, 3, 4, 5, M, QR, and ke [0,
Workstation 1 to Workstation 5
W1/W2/W3/ :
W4/W5
K :
Elapsed repair time, where ke [0,
The Showing Failure rate of the one machine of the Workstation 2/ 4.
Wm
Pw it)
Machine failure rate
Showing the probability of 2-out -of-3: G state of workstation 2 i.e. system is in fully operational mode even after one machine of workstation 2 is failed and rest two are in working condition
PlA (t)
Showing the probability of 2-out -of-3: G state of workstation 4 i.e. system is in fully operational mode even after one machine of workstation 4 is failed and rest two are in working condition
The General failure rate of ith workstation, where i= 1, 2, 3, M, 4, 5.
f(k )
gQ
Showing repair rate of ith workstation between the time interval (k, k+D), where i= 1, 2, 3, 4, 5, M, QR, and ke [0, +<~)
Showing risk rate or the factor which indicates the level of risk taken into consideration which can lead the system into the risk stage
Pi, W (k, t) : Shows the probability of the failed state of the system due to failure of the ith workstation from the state S2 when one machine of workstation W2 is not working. Elapsed repair time for the ith subsystem lies between (k, k+D), where i=1, 3, 4 and ke [0, +<*>)
Pi, A (k, t) : Shows the probability of the failed state of the system due to failure of the ith workstation from the state S2 when one machine of workstation 4 is not working. Elapsed repair time for the ith subsystem lies between (k, k+D), where i= 1, 2, 3 and ke [0, +<~).
PQR(q, t)
Shows the probability at time t when the system is in the risk due to ignorance in inspection at the workstation 5
Ki, K2
Profit and service cost per unit time respectively
and 2 , according to Gumbel- Hougaard copula methodology the
joint probability distribution is given by
u — e Also, consider 1
fM = exP
rq +
[logfM (r )]ej1/e.
2.1. Assumptions
For reliability analysis of this manufacturing system, the following assumptions are taken into
consideration.
■ All the workstations are fully operational at t=0.
■ Failures follow exponential time distribution and are statistically independent while repairs follow arbitrary time distributions.
■ Repaired workstations are assumed like in good working conditions.
■ Workstations 2 and 4 follow 2-out-of-3: G and 1-out-of-3: F conformation.
■ It is also considered that the manufacturing system can fail due to any mechanical failure that may be major or minor or both at the same time. Here joint probability distribution is used to solve these failures using the copula methodology [6]. The whole system can also fail due to machine failures that may be either major or minor or both.
2.2. State specification
Table -1 shows the state specification of the transition diagram-1
Table 1: State specification table
States Description System State
S0 The system is in the fully operational stage. G
S1 The system is in the failed state due to the failure of the Fr
workstation Wi.
S2 The system is in a working state when workstation W2 is G
in 2-out-of-3: G configuration.
S3 Due to the failure of workstation W3, the whole system is Fr
in the failed state.
S4 The system is in a working state when workstation W4 is G
in 2-out-of-3: G configuration.
S5 Due to machine failure, the whole system is in a Fr
breakdown condition.
S6 System is working at high risk due to negligence of the Rs
workstation W5.
S7 The system is in inoperable condition from the risk state Fr
i.e. S6 due to ignorance in the inspection. The system is in inoperable condition from the state S2 as
S8 workstation Wi is unable to work due to some vendor issues. Fr
S9 The system is in inoperable condition from the state S2 Fr
due to the failure of workstation W4.
S10 The system is in the failed state from the state S2 because Fr
workstation W2 follows 1-out-of-3: F configuration.
S11 The system is inoperable due to the not functioning of Fr
workstation W3.
S12 The system is in inoperable condition from the state S4 Fr
due to the failure of workstation Wi.
S13 The system is inoperable from the state S4 due to the Fr
failure of the workstation W2.
S14 The system is inoperable from the state S4 due to the Fr
failure of the workstation W3.
S15 The system is inoperable from the state S4 due to the Fr
failure of the workstation W4.
f a
'fa
IV-(u, t) S io
Fvw(x. t) i
Ss
PvaOM) Su
Ppa(V: t) S14
V* ■*—:— ».0
c stae
= Failed state. = Operational state. f j =Risk
Figure 1: Transition State diagram
3. Formulation of the mathematical model
Following integro- differential equations which satisfying the model are obtained after probabilistic considerations and limiting process:
d_ dt
+ WiA + Viw +¥v +¥M +Wp + g Q
00 00 P (t) = jVv (x) PV (X t yt + JVp pp( y,t )dy +
¥ ¥ ¥
\fM (r)PM (r, t)dg + (q)PQ (q, t)dq + \fA (g)PA (g, t)dg +
d d / / \ ft + & + (x)
d + _d_ dt dy
—+—+fp (y)
(u) Pw (u, t )du + jf (H)Pq (h, t )dh 0
Py (X t) = 0
Pp (y, t) = 0
(1) (2)
¥
¥
5 5
--1---h exp
5t 5r
rq +
d ^ A / N
ft + iq + + >«" (q)
5 5 J .n
-T + -ZT + fQ (h) dt dh
{[logf (r )]}qj1/q ^ (q, t) = o
Pq (h, t) = o
Pm (r, t) = 0
d_ dt
+ y A +Vw +¥y + ¥m +Wp + YQ
CO
P\w (t) = \fv (xp (Xt)dx
+
¥ ¥ + \$A (g W (g, t )dg + \fp (y)^ (J, t )dy
+
)
5 5 J. r A
.a?+ & + *(^
T- + —+ fA (g)
OT OTg
a a —+—
at ay
— + — + fp (y)
5 5 f ^
— + — + fW (u)
5t 5u
(x, i) = 0 Paw (g, i) = 0 Ppw (y, t) = 0
Pw (u, t) = 0
d_ dt
+ y A +Vw +¥y + ¥m +Wp + YQ
P
CO
,(t) = JfV (X)PVA (x t )dx
+
CO CO
jVp (y)PPA (y, tyfy + \fW (u)PWA («> t)du
+
wMt)
d d J. r \
J,+ ax+f (x)_
d d J. / N
— + — + fp (y)
dt dy p
0 o / / \
— + — + 0W (u)
ot ou
d d J. / N
— ^ + fA (g)
01 dg
PvA (x, t) = 0 Pp A (y, t) = 0
(u, t) = 0 Pa (g, t) = 0
3.1 Boundary conditions
Pv (0, t) = ^>o(t)
Pp (0, f) = ypP0(t)
Pm (0, t) = yMP0(t)
(4)
(5)
(6)
(7)
(8)
(9) (10) (11)
(12)
(13)
(14)
(15)
(16)
(17)
(18) (19)
Pqr (0, t) = 7q [P0(t) + PA (t) + Pw (t)] (20)
PQ (0, t ) = ¥QPQR (t ) (2D
Pvw (0, t) = yvPw (t) (22) PAW (0, t ) = yAPw (t ) Ppw (0, t ) = ypPw (t ) Pw (0, t ) = ywPw (t )
(23)
(24)
(25)
pVA (a o=WvpA (t ) (26)
(0, i ) = ^ (i ) (27)
PWA (0, t) = WwPA (t) (28)
P (0 0 = ^4 (0 (29)
3.2 Initial Condition
^o(0) !, otherwise zero. (30)
After solving equations (1) to (16), using initial and boundary conditions by taking Laplace transform, one can obtain following up and down probabilities of the system.
P0(s) = — 0 K (s)
P (s) - Bs)
(s) K (s)
PA (s) = ^
1A K (s)
(31)
(32)
(33)
Pv (s) = TT, Jv (s)
K(s) (34)
PP(s) = (s)
K(s) (35)
PM(s) = y-JM (s)
K(s) (36)
Pqr (s) = 1 + + A^QR <s)
PQ(S) = g^) f1 + A(S) + B{S)']Jqr (S)Jq (s)
^ O = ^BT Jv (s)
K(s) (39)
(37)
(38)
PW (s)=yBr Jp (s)
K (s)
PW (s) = '-Kv J A (s)
K (s)
P W = ^TTT (s)
K (s)
PA(s) = ^ Jv (s)
K (s)
pp: (s)=y^si jp (s)
PA K(s) P
PA (s) = yAS jw (s)
K (s)
P (s) = ^^ J A (s) K (s)
where,
K(s) = s + yv +yM + y p +ylA +ylw + Yq-¥vSv (s)-ypSp (s)-yMSu (s) -
YqSQR (s) - [YQSQR (s) + yASA(s))jyCL - ¡YQSQR (s) + WWSW(s)]— -
C1 c2
¥qYqsq (s)
1 + + ¥ia
C C 1 2
JQR (S)
J t (s) = 1 (s), for i = V, P, M, QR, Q, A, W
JQR (s) =
s
1 - Sqr (s)
S +
Wq
A(s) = B(s) =
WlA
C
Vw
C
(51) _ _ _
C1 = s + ¥v + ¥m + ¥p + ¥a + ¥w + gq ~¥vsv(s)-¥psp(s)-¥wsw(s) C = 5 + ¥y +¥m +¥P +¥A + ¥W + YQ-¥V~SV (s)-¥PSP (s)-¥ASA (s)
(40)
(41)
(42)
(43)
(44)
(45)
(46)
(47)
(48)
(49)
(50)
(52)
(53)
S,
(j) = 0)exp[-f (j)djd, for i = V,P,M,QR,Q, A,W& j = x,y,r,q,h,g,u.
(54)
(55)
fM = exPp + [logfM (r)]ef
Also,
P up (s) + P down (s) —
s
(56)
To study the steady-state behavior of the system using Abel's lemma we have
lim sf(s) = lim f(t) = f(say)
s®0 t
Pup(s) = P0(s) + Pw (s) + PiA (s)
Po =
1
P =
1 1W
Pa =
K (0)
B(0)
K'(0)
A(0)
K(0)
where,
K(0) =
dk (s
ds
T = -Si (0)= A(0) =
Mean time to repair the ith failure
V1A
m=
Vm + Va + 7e
VlW
Vm + Va + Yq
1
LmJQR (s) = — mqr
—Q (As s tends to 0)
SfC/) = f f j + f
(57)
(58)
(59)
(60)
(61) (62)
(63)
(64)
(65)
(66)
For a non-repairable system, the Laplace transform of the reliability when all repair rates of the system are zero, then from equation (31), we have
R(s) =
1
s + y +yp +WiA +Wiw +Wm + YQ where R(s) is the Laplace transform of the reliability function. The reliability of the transit system is obtained as:
R(t) = exp[-( Vy + Vm + Vp + Via + Viw + Yq) *t]
The mean time to failure of the system is given by,
0
V
- /• ¥
MTTF = LimR(s) = j R(t)dt
MTTF =
1
Wy + Wm + Wp + Wia + Wiw + Yq
(68)
Availability of the system is given by,
Pup(s) = P0(s) + Pw (s) + PiA (s)
Pup (s) = -— [1 + B(s) + A(s)] K (s)
1 +
Pup (5) =
.016 5 + .055
5 + .054
Taking inverse Laplace transforms, we have
Pup(t) = -16.e (-0™000i) +17 e-0540000000t)
(69)
Sensitivity analysis is performed for monitoring changes in reliability and MTTF of the system with
respect to workstations W1, W3, and risk factor . we obtain
dR(t) +yP +ylA +yW + yM + }*t}
^ ■ = -te
dyv
dR(t) SR(t)
Also, we can get ^yp and .
d
-MTTF = —
1
dyv
yv +yp +yu +yiw +yM + gQ)2
Also, ^MTTF1 dy and dMTTF / dge.
The profit function of the considered manufacturing system is given by
G(t) = K -¡p (t)dt - K2t
where, K1 and K2 are revenue and repair costs per unit time, respectively. Also
G(t) = K fe
(-(Vv +Vp+ VlA+ VlW +Vm+7q )t)
+
via + viw
(70)
(71)
(-(Vv+Vp +Vl A+Viw+Vm+7q )t)
Via +Viw Via + Viw -Vw -Va
VlA +VlW -VW -VA.
(-(Vv+Vp+Va +Vw +Vm+gQ )t)dt — K t
4. Results and discussion
To check more concrete behavior of the system, Numerical computation of reliability, availability, and profit function is done concerning time by keeping other parameter fixed and also MTTF of the system for different failure rates.
Figure 2 shows the movement of reliability with respect to time. It reveals that due to ignorance of the workstation Ws in inspection, the reliability decreases with the passage of time. Figure 3 shows a rapid decrease in MTTF with an increment in Workstation Wi, W3, and machine failure rate. It is also observed that in some instances MTTF is almost the same with respect to these three failure rates. Also, as the risk rate increases, the MTTF of the system decreases smoothly shown in figure 4. Figure 5 gives an idea about the availability of the system that decreases constantly as time increases.
Sensitivity analysis of system reliability is done for different workstations failure rates as shown in figures 6, 7, 8, and 9. Here we observe that the system has almost same sensitivity for Wi workstation failure and risk rate, although machine failure and workstation W2 come next in magnitude.
Finally, Figure 10 shows that the cost of the system increases in general with time.
1,2
1
0,8 0,6
0,4
0,2
0 =h
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
time
Figure 2: Reliability Vs Time
25
20
15
Ph
H H
10
0 =h
0,001 0,002 0,003 0,004 0,005 0,006 0,007 0,008 0,009
W1/W3/M Failure
0,01
Figure 3: MTTF Vs workstation Wi, workstation Wj and Machine failure
0,01 0,02 0,03 0,04 0,05 0,06 0,07 0,08 0,09 0,1
Risk Rate
Figure 4: MTTF Vs Risk Rate
1,2 1 0,8 0,6 0,4 0,2
0
10
Figure 5: Availability Vs Time 505
0)
3-2
fH
•a
o
15-5
SH u
-7
Time
Figure 6: Sensitivity of system reliability with respect to workstation Wi failure.
Time
Figure 7: Sensitivity of system reliability with respect to workstation Wi failure.
-600
Figure 8: Sensitivity for MTTF with respect to Xl= ^v, X2= V p . (X=X1=X2)( ^v= V p=.001, .002 ....01)
Risk Rate
Figure 9: Sensitivity for MTTF with respect to X= ( =.01,. 02,.. .,.1)
60
50
40
1 30 U
20 10
Figure 10: Cost Vs Time
5. Conclusion
In this work, the operational behavior of a k-out of-n configuration system is discussed including risk factor using mathematical modelling technique. Also, a comparative analysis of reliability, availability, MTTF, risk, sensitivity, and profit function are done with time for different workstations. The proposed technique has an advantage of analyzing reliability of a complex manufacturing system in a more flexible way.
The study may help a manufacturing industry in:
a. Handling resources and suppliers
b. Planning of production strategies and maintenance policies
c. Decision making.
References
[1] Chandrashekar, P. (1996). Reliability analysis of a complex one Plant system. Opsearch, 33(3): 167-173.
[2] Chung, W. K. (1988). A K-out-of-n: G redundant system with dependent failure rate and common cause failures. Microelectron and Reliability U.K., 28: 201-203.
[3] Mangey, R., Singh, S.B. (2010). Analysis of a complex system with common causes failure and two types of repair facilities with different distributions in failure. International Journal of Reliability and safety,4(4): 381-392.
[4] Nelson, R.B. An introduction to Copulas, New York, Springer, 1999.
[5] Sengar, S. and Singh, S.B. (2012). Operational behavior and reliability measurers of a viscose staple fibre plant including deliberate failures. International journal of reliability and applications,13 (1): 1-17.
[6] Sengar, S. (2016), Sensitivity analysis of a fibre plant unit due to deliberate failure. IJIERE, 3 (4): 13-22.
[7] Sengar, S. (2020). Sensitivity analysis of a complex manufacturing system with the application of wait in line theory. Reliability: theory & applications, 4(59): 27-34.
[8] Sengar, S., Mangay, R., & Yigit, K. (2021). Stochastic analysis of complex redundant system having problem of waiting line in repair using copula methodology. Reliability: theory & applications, 16:383-391.
[9] Sengar S. Reliability analysis and cost optimization in manufacturing systems, System reliability Engineering, Walter de-Gruyter publication, 2021