Научная статья на тему 'RELIABILITY ANALYSIS OF PARALLEL SYSTEM USING PRIORITY TO PM OVER INSPECTION'

RELIABILITY ANALYSIS OF PARALLEL SYSTEM USING PRIORITY TO PM OVER INSPECTION Текст научной статьи по специальности «Медицинские технологии»

CC BY
128
33
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
Parallel system / priority / inspection / semi-Markov / regenerative points / repair activities / profit

Аннотация научной статьи по медицинским технологиям, автор научной работы — Neetu Dabas, Reetu Rathee, Abhishek Sheoran

Reliability optimization of a system is an extant problem. By solving these problems, new methodologies are obtained that have invent new engineering technology and changes the management perspective. Aim of the reliability analysis is to study the failure mechanisms of a system and and outcomes of the analysis serve to identify design solutions and maintenance actions for preventing the failures from occurring. So, it is used to evaluate and improve the quality of products, processes, and systems. Measurement, planning, and improvement in the reliability are the things which are well do in any business but only when efforts are focused on important problems which are highlighted by monetary values, improve reliability, reduce unreliability costs, generate more profit, and get more business. To serve this purpose, present study investigates a parallel system of two identical units which is based on several assumptions like, the system is served by one serviceman who is immediately available for service when it will call. System failure rate is fix and the failure type (repairable or replaceable) is known by inspection. The failure and repair activities are stochastically independent, and their rates are exponentially distributed. Priority to PM over inspection is given in the system. Several measures of reliability effectiveness like MTSF, availability and cost-benefit analysis of the system are obtained by semi-Markov and regenerative point approach. Reliability characteristics parameters are random variables, and results are obtained in the form of graphs and tables by changing the values of these variables one by one, while keeping other variables constant at that point. From the results we conclude how to make the given system more profitable. Findings of present system model shows that when the failure rate is low then the system obtained more profit by increasing preventive maintenance rate. On the other hand, when failure rate going high then we make the system more profitable by increasing inspection rate. These insights of modelling and analysis helps the system developers and managers to make good choices of action against specified criteria that managing engineered products and industrial plants safely and reliably. This leads to more profit and making a business more growing.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «RELIABILITY ANALYSIS OF PARALLEL SYSTEM USING PRIORITY TO PM OVER INSPECTION»

RELIABILITY ANALYSIS OF PARALLEL SYSTEM USING PRIORITY TO PM OVER INSPECTION

Neetu Dabas

Department of Statistics, Amity University, Noida, Uttar Pradesh-201313 Email: [email protected]

Reetu Rathee •

School of Business, Galgtias University, Greater Noida, Uttar Pradesh-203201 Email: [email protected]

Abhishek Sheoran

Department of Statistics, Ramanujan College, University of Delhi, Delhi-110019

Email: [email protected]

Abstract

Reliability optimization of a system is an extant problem. By solving these problems, new methodologies are obtained that have invent new engineering technology and changes the management perspective. Aim of the reliability analysis is to study the failure mechanisms of a system and and outcomes of the analysis serve to identify design solutions and maintenance actions for preventing the failures from occurring. So, it is used to evaluate and improve the quality of products, processes, and systems. Measurement, planning, and improvement in the reliability are the things which are well do in any business but only when efforts are focused on important problems which are highlighted by monetary values, improve reliability, reduce unreliability costs, generate more profit, and get more business. To serve this purpose, present study investigates a parallel system of two identical units which is based on several assumptions like, the system is served by one serviceman who is immediately available for service when it will call. System failure rate is fix and the failure type (repairable or replaceable) is known by inspection. The failure and repair activities are stochastically independent, and their rates are exponentially distributed. Priority to PM over inspection is given in the system. Several measures of reliability effectiveness like MTSF, availability and cost-benefit analysis of the system are obtained by semi-Markov and regenerative point approach. Reliability characteristics parameters are random variables, and results are obtained in the form of graphs and tables by changing the values of these variables one by one, while keeping other variables constant at that point. From the results we conclude how to make the given system more profitable. Findings of present system model shows that when the failure rate is low then the system obtained more profit by increasing preventive maintenance rate. On the other hand, when failure rate going high then we make the system more profitable by increasing inspection rate. These insights of modelling and analysis helps the system developers and managers to make good choices of action against specified criteria that managing engineered products and industrial plants safely and reliably. This leads to more profit and making a business more growing.

Keywords: Parallel system, priority, inspection, semi-Markov, regenerative points, repair activities, profit.

1. Introduction

The objectives of any equipment or system manufactured is to design it in such a way that it achieves its goals in terms of production. A reliable equipment is the one which works satisfactorily for a given time period under given environmental conditions without any interruptions. Hence the reliability is the key point in the manufacturing/ production industries. Although ever-increasing urge of the society is making the design of system more complicated and to control the strength and effectiveness of failure of such system reliability experts frame a model which is more productive and profitable. Various researcher has done a lot of research work in the reliability theory to improve the repair techniques. Several authors such as Gupta and Agarwal [1], Dhillon and Yang [2] extensively discussed complex systems by considering various failure and repair disciplines. Ram [3] gave the summery of various reliability approaches. Parallel redundancy is highly used by the researcher to enhance the system reliability. Hitomi [4] investigates the reliability of a manufacturing system in which two machines are arranged in parallel. Termoto et al. [5] studied an optimal inspection policy for an n-unit parallel system which is checked at successive times and PM is carried out after the failure of a certain number of units at each inspection. Gupta et al. [6] analyzed a two non-identical unit parallel system. They have taken the joint distribution of lifetimes of both units as bivariate negative exponential. Malik et al. [7] considered two reliability models with two parallel units in which one is original and other is duplicate. Priority to repair of the original unit is given in model I and no priority is given in model II. Yu and Khambadkone [8] derived a parallel inverter system to analyses the reliability and cost optimization using sensitivity analysis. Rathee and Malik [9] observed a parallel system under the aspect of priority to PM over repair and replacement. Sivakumar and Jayanth [10] studied the reliability of a Mobile network system during communication. Kakkar et.al. [11] worked on the reliability and profit analysis of a parallel industrial system. Bhardwaj and Parasher [12] analyzed a cold standby system with geometric failure and repair rates. Pundir et.al. [13] studied a two non-identical units' parallel system with priority in repair to first unit. Chopra and Ram [14] investigate the reliability measures of the system, which has two dissimilar units in the parallel network under copula. Li et al. [15] developed a two similar component parallel degradation repairable system. They considered that when the repairman is on vacation then the failed component is not repaired as good as new. Dabas and Rathee [16,17] derived a parallel system with the idea of priority to preventive maintenance over replacement and inspection for repair activities. Sherbeny [18] studied the impact of some system parameters on an industrial system consisting parallel units with one repairer and optional vacations under Poisson shocks.

In this paper we consider a two identical units parallel system using priority to PM over inspection. All repair activities and inspection is done by a single serviceman. Units' failure rate is taken to be constant, and inspection is done to find the type of failure. Time taken in repair activities is distributed arbitrarily and their rates are exponentially distributed. The failure and repair activities are stochastically independent. To meet the objective of reliability evolution we derive some suitable measure like MTSF, availability and cost-benefit analysis of the system using semi-Markov and regenerative point approach. Graphs are plotted to observe the change in the behaviour of these measures with failure rate for particular cases of various rates included in the system.

2. Notations for System Model

л

a/b/ao

a/ß/y/e

h(t)/f(t)/r(t)/g(t)

H(t)/F(t)/R(t)/G(t)

pij pij.kr

Qij(t)/qij(t) Qijkr(t)/qijkr(t)

mij ©/©

Constant Failure Rate

Rate by which system goes for Repair / Replacement / Preventive Maintenance respectively

Repair / Replacement / Inspection / Preventive Maintenance rate respectively done by the server

pdf of the Inspection / Repair / Replacement / Preventive Maintenance time respectively

cdf of the Inspection / Repair / Replacement / Preventive Maintenance time respectively

Transition probability from state Si to state Sj Transition probability from state Si to state Sj via state Sk, Sr

Cdf/pdf of passage time from regenerative state Si to a regenerative state Sj or to a

failed state Sj without visiting any other regenerative state in (0, t]

pdf/cdf of direct transition time from regenerative state Si to a regenerative state Sj

or to a failed state Sj visiting state Sk, Sr once in (0, t]

Mean sojourn time in state Si

Contribution to mean sojourn time in state Si when the system transits directly to state Sj

Symbol for Laplace transformation/ Laplace Stieltjes Transformation Symbol for Laplace transformation/Laplace Stieltjes convolution

3. System Description and Assumptions

To evaluate the effectiveness of the present research, the numerical data is examined in order to establish essential assumptions to the system model. The Semi-markov and re-generative point process are used to provide formulations of system dependability measures such as reliability, mean time to system failure (MTSF), availability, and profit function. Numerical examples are provided to demonstrate the acquired conclusions. Results are obtained in tabular and graphical form to investigate the influence of various system features. Assumptions

• Initially both the units are in working mode

• Units are failed with constant rate

• System is served by single serviceman

• All the times associated with all events are random and independent.

• All the repair activities follow exponential distribution

Table 1: Description of the states

States Description

50 Both the units are operative

51 One unit is operative and other is failed under inspection

52 Resume for PM

53 One is working and other is failed under replacement

54 One unit is continuously under inspection from previous state and other is waiting for inspection

55 One is working and other is failed under repair

56 One unit is waiting for inspection from previous state and other is under PM

57 One unit is working and other under PM

58 One unit is continuously under replacement from previous state and other is waiting

for inspection

S9 One unit is under repair and other is continuously waiting for inspection from

previous state

510 One unit is under replacement and other is continuously waiting for inspection from previous state

511 One unit is continuously under repair from previous state and other is waiting for inspection

512 One unit is continuously under repair from previous state and other is waiting for PM

513 One unit is continuously under replacement from previous state and other is waiting for PM

514 One unit is continuously under PM from previous state and other is waiting for inspection

Figure 1: Transition State Diagram

4. Formulation and Stochastic Analysis of the Model 4.1. Transition Probabilities & Mean Sojourn Times

Steady- state transition probabilities from regenerative state i to state j are given by the formula Pij = Qij(ra) = ( qij (t)dt

P$% = ^ ' P$& = , Pi+ = bh*(A +k0), p14 = -J— (1- h*(A+a0)),

p15 = ah*(A+«o), Pi/ = (1-h*(A+a$)) , P+o = r*(A+«$), P+s = P+i.s = (1 - r*(A+«$)), Pa,i3 = P+7.1+ = (1 - r* (A +a$)),

P-4 = a ; P-,10 = b ,Pso = f *(A +«o) /P5,11 = P5i.ii = -J-" (1 - f *(A +K0)) / Ps,i2 = P57.12 = (1 - f *(A +«o))/ P70 = g*(A) , P7,14 = P71.14 = 1 - g*(A) , P11.44 = -t0 (1- h*(A +«$)) ,Pii.4,io = (1 - h*(A +a$)) , Pi,i4.6 = -tt; (1- h*(A +a$)) , Pi7.6,i+ = -J5 (1- h*(A +a$)) ,

p27 = p61 = p81 = p91 = plO,l = pll,l = pl2,7 = pl3,7 = pl4,l = 1

It is noticed that the Zj pjj = 1 for all possible values of 'i'.

Further mean sojourn times (mO is the expected time taken by the system in a particular state before transiting to any other state. If Ti is the sojourn time in state 'i' ,then

m = E(t) = JO# P(T > t) dt = Zj mjj and my = ^^ |s = 0. Expressions for Mi are given as

2A + aO A + aO A + aO

Ms = ^ (1 - f*(A+«o), M7 = ' (1- g*(A))

1 A b 1 a

A+aO A+aO p y a

M3 = @ , M. = M7 = A

4.2. Reliability & Mean Time to System Failure (MTSF)

Let cdf of first transition time from the state Si to the state in which failure occur is represented by 0;(t) . We take absorbing state as the failed state. So, the expressions for Oj(t) from which MTSF of discussed system is obtained as

O (t) = Zi,j Qij (t) © Oj (t) + Zi,k Qik (t) (1)

Where i is the operating state from which transition takes place to j (operating & regenerative state) and k (failed state).

If we take LST of above relation (1) and solved them for O$*(s), we have

R*(s) = (2)

By taking Inverse Laplace transform of (2), we get system reliability. And MTSF is obtained as: MTSF = lim l"°"(s) = F

s^O S D

Where, N = Mo + MiPoi + M+PoiPi+ + MsPoiPis and D = 1 - PolPl+P+o - PoiPisPso

4.3. Analysis of Availability

Let Ai(t) be the probability of the system availability at an instant 't' given that system goes to regenerative state Si at t = 0. So the expressions for Ai(t) as

Ai(t) = Mi(t) + Ziij qi]n) (t)©Aj(t) (3)

Where i is regenerative state from which transition takes place to j (successive regenerative state) through n transitions.

Mi7(t) be the probability of the system in up state Si up to the time 't' without visiting to any other regenerative state.

MO(t) = e"(2'+K°)t , Ml(t) = e_('+K° )lH(t), M3(t) = e"('+K° )lR(t), Ms(t) = e"('+K° )tF(t) , M7(t) = e"(It)G(t)

Now, if we use LT of (3) and solved it for A$(s).We get the result for steady state availability as AoK) = Sim sA$(s)= (4)

S^O D%

Where

Nl = MoX + (Ml + M+Pl+ + MsPis)Y + M7Z and

Dl = (Mo + M&Po2)x + (Ml + M+Pl3 + M.Pis + M/Pl6)Y + m7z

4.4. Busy Period Analysis for Server

Let BJ(t),BR(t),BRp(t),BR(t)be the probability of busy period of server during inspection, repair, replacement and PM at instant 't' with the given condition that the system go to regenerative state Si at t=0. The expressions for B/(t), BR(t), BRp(t), B?(t) are as follows: Bj(t) = W(t) + Zy qg0 (t)©B J(t) , BR(t) = W!(t) + Zy q(n) (t)©BR(t)

BRp(t) = Wi(t) + Z i,j q(n) (t)©BRp(t) , BR(t) = Wi(t) + Z y q(n) (t)©BR(t) (5)

Where i is regenerative state from which transition takes place to j (successive regenerative state) through n transitions.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Wi(t) be the probability of server busyness at state Si due to repair activities at time t without making any transition to any other regenerative state or returning to the same via one or more non regenerative state. Here,

W%(t) = e-('+Ko)tFT(F) + (Ae-('+K°)t©1)ii(tf)

Ws(t) = e_('+Ko)tF(tlt) + (Ae"('+Ko)t©1)F(1t) + («0 e-('+K°)t©1)Fr(^

W3(t) = e"('+Ko)t]Rt(tf) + (Ae"('+Ko)t©i)]Rt(tf)+ («$ e-('+Ko)t©i)K(tf) W2(t) = G(t) = W6(t),W7(t) = e-(')tGi(tO + (Ae-(')t©1)Gi(tO

Take LT of (5) and solving it for B$* (s), BR*(s), BRp (s), BR (s) .The busy time in inspection, repair,

replacement and PM for server is given by

B$ («0 = lino sB$(s) = F& , BR(«) = lino sBR* (s) = Fa

BRp(«) = lim sBRp* (s) = F± , BR(«) = limsBR* (s) = F)

0 V J s^0 0 V J D^ 0V J s^o 0 W Di

Here,

N2 = W%(0)Y,N3 = W5*(0)p15Y,N4 = W+*(0)pi+Y and

Ns = W2*(0)p02X + W6*(0)pi6Y + W7*(0)Z and D1 is mentioned above.

4.5. Expected Number of Visits by The Server

Consider Ii(t), Ri(t), Rpi(t) ,Pmi(t) as the expected number of visits make by the server for inspection, repair, replacement and PM in (0, t] .We have the following recursive relations for I!(t) R!(t) Rp!(t) Pm!(t) are

Ii(t) = Zi,j Q(n) (t)@ (C + Ij (t)) , Ri(t) = Zi,j Q(n) (t)@ (C + Rj (t))

RPi(t) = Zi,j Q(n) (t)@ (C + Rpj (t)) , Pmi(t) = Zi,j Q(n) (t)@ (C + Pmj (t)) (6)

Where i is regenerative state from which transition takes place to j (successive regenerative state) through n transitions and and C = 1 server does the job afresh at j, otherwise C = 0. Take LST of (6) and solving it for I** (s), RJ,* (s), Rp0* (s), Pm0* (s).The expected number of inspections, repairs, replacements and PM by the server is given by (per unit time)

u«) = lirn si**(s) = d* , R0(«) = lim sR0*(s) = F+

RP0(«) = simsRp**(s) = FT , Pm0(«) = simsPm**(s) = F-Where,

N/ = (1 - Pi6)Y, N7 = (Pii.49 + Pis)Y, N8 = (Pii.4,10 + Pi+)Y, N4 = P02X + pi6Y + Z and Di is already mentioned. Here X, Y & Z are

X = Pi+P+0 + Pi5P50 + P70(Pi+P37.i3 + PisP57.i2) , Y = (1 - P0&P70) and Z = pi3 + pi5 — pi3p3i.8 — pi5p5i.ii — p0ipi3p30 — p0ipi5p50

4.6. Profit Analysis

In steady state the profit function of the system model can be obtained as P = k$A$ - klB$ - k&B0R - k3B0Rp - k-BM™ - k.Io - k/Ro - k7RPo - k8Pm$ Here,

P = Profit function of system model fcO = Revenue Per unit up - time of the system fcl , fc2, fc3, fc4 = Cost Per unit time of the server when it is busy in

insPection, rePair, rePlacement, Preventive maintenance fc5 , fc6 , fc7 , fc8 = Cost Per unit time for insPection, rePair, rePlacement, Preventive maintenance

5. Analytical Study of the Model

To make the study more practical we draw the results in the form of tables and graphs. Tables 1, 2, 3 and figures 2, 3, 4 show the behaviour of MTSF, availability and profit with respect to failure rate for different values of the given parameters by assuming that the rate of repair activities follow exponential distribution. Table 1 and figure 2 talks about the values of MTSF goes decreasing when failure rate increases. If we increase the values of repair rate (a=4.1), replacement rate (|3=5) and inspection rate (y=3) one by one and keep all other parameters fix we find that the MTSF is increases. But if we increase ao=3.1 (rate by which system goes for PM) the MTSF is decreases. Table 2 and figure 3 shows the effect of various parameters on availability with respect the failure rate and we observe that the availability of the system decreases with increase in the failure rate. Similarly if we increase a, |3,y and 0 (rate by which system do preventive maintenance) then the availability is also increases but availability decreases when we increase in ao. From table 3 and figure 4 we conclude about the profit of the system. We see that if values of a, [, y and 0 increases then the profit is also increases but if we increase ao then the profit goes decline.

Figure 2: MTSF VS Failure Rate

Table 2: MTSF w.r.t various parameters

Failure rate a=2.1,ß=2,a=0.6,b=0.4,y =1.3,a0=3 a= 4.1 ß=5 Y= 3 a0= 3.1 a= 0.4, b= 0.6

0.1 0.33274 0.33275 0.33275 0.33279 0.32204 0.33274

0.2 0.33113 0.33119 0.33119 0.33130 0.32056 0.33113

0.3 0.32875 0.32887 0.32886 0.32908 0.31838 0.32875

0.4 0.32577 0.32596 0.32594 0.32627 0.31563 0.32577

0.5 0.32235 0.32260 0.32258 0.32302 0.31247 0.32234

0.6 0.31859 0.31890 0.31887 0.31943 0.30899 0.31858

0.7 0.31458 0.31495 0.31492 0.31558 0.30527 0.31457

0.8 0.31040 0.31082 0.31079 0.31153 0.30138 0.31039

0.9 0.30610 0.30657 0.30653 0.30736 0.29737 0.30609

Figure 3: Availability VS Failure Rate Table 3: Availability w.r.t various parameters

Failure Rate a=2.1,ß=2,a=0. 6,b=0.4,y=1.3, aO=3,0=1.4 a=4.1 ß=5 a=0.4,b=0. 6 Y=3 a0=3.1 e=2

0.1 0.53052 0.53208 0.53170 0.53043 0.55323 0.52682 0.57425

0.2 0.48233 0.48528 0.48462 0.48218 0.51847 0.47809 0.53218

0.3 0.44435 0.44852 0.44764 0.44414 0.48875 0.43990 0.49653

0.4 0.44435 0.41859 0.41754 0.41312 0.46298 0.40888 0.46580

0.5 0.38741 0.41859 0.39237 0.38714 0.44036 0.38300 0.43895

0.6 0.36524 0.37219 0.37087 0.36494 0.42031 0.36094 0.41524

0.7 0.34599 0.35362 0.35221 0.34567 0.40238 0.34183 0.39411

0.8 0.34599 0.33727 0.33578 0.32871 0.38622 0.32505 0.37514

0.9 0.34599 0.33727 0.32115 0.31363 0.37156 0.31014 0.35799

Profit VS Failure Rate

• o=2.1,p=2.a=0-6.b=0.4,v=1-3.a0=3,8=1^i «00=3.1 «a=4-1 «|3=5 •a=0.4.b=0.6 *y=3 »9=2

S.OK

Failure Rate Figure 4: Profit VS Failure Rate

Table 4: Profit w.r.t various parameters

ailure Rate a=2.1,ß=2,a=0.6 ,b=0.4,y=1.3,a0 =3,0=1.4 a=4.1 ß=5 a=0.4,b=0. 6 Y=3 a0=3.1 0=2

0.1 7271.45 7307.88 7308.10 7256.59 7596.16 7216.20 7800.53

0.2 6382.77 6445.78 6446.11 6357.37 6877.03 6321.97 6980.11

0.3 5684.64 5767.44 5767.80 5651.40 6265.67 5622.79 6297.90

0.4 5117.12 5214.77 5215.12 5077.84 5738.43 5056.42 5719.43

0.5 4643.64 4752.40 4752.75 4599.59 5278.18 4585.18 5221.28

0.6 4240.52 4357.50 4357.87 4192.61 4872.23 4184.81 4786.85

0.7 3891.68 4014.63 4015.04 3840.60 4510.94 3838.93 4404.02

0.8 3585.81 3712.90 3713.39 3532.09 4186.87 3536.04 4063.65

0.9 3314.65 3444.43 3445.03 3258.70 3894.18 3267.80 3758.75

6. Practical Implication

Redundancy is a useful method of increasing reliability and optimizing the balance between operation effectiveness and expenditure. Arranging elements of the system in parallel provide alternative paths of operation. The parallel structure in the reliability engineering is widely used in many industrial systems such as power generation systems, pump systems, production systems and computing systems. One of the examples is in the commercial boiler market. Packaged boilers installed in multiple boiler cascade systems offer long-term energy savings and reliability. L. Vorsteveld [19] gives that the preferred control scheme is parallel cascading, and it leads to high turn down ratio.

Figure 5: Parallel Boiler Cascade System

References

[1] Gupta, P.P., and Agarwal, S.C. (1984). A parallel redundant complex system with two types of failure under preemptive-repeat repair discipline. Microelectronics Reliability, 24(3): 395-399.

[2] Dhillon, B.S. and Yang, N. (1992). Stochastic analysis of standby systems with common-cause failures and human errors. Microelectronics Reliability, 32(12):1699-1712.

[3] Ram, M. (2013). On System Reliability Approaches: A Brief Survey. International Journal of System Assurance Engineering and Management, 4(2):101-117.

[4] Hitomi, K., Nakajima, M. and Takahashi, N. (1979). Reliability analysis of parallel manufacturing systems with two machines. Journal of Manufacturing Science and Engineering, 101(3):250-255.

[5] Teramoto, K., Nakagawa, T. and Motoori, M. (1990). Optimal inspection policy for a parallel redundant system. Microelectronics Reliability, 30(1):151-155.

[6] Gupta, R., Kishan, R. and Kumar, P. (1999). A two-non-identical-unit parallel system with correlated lifetimes. International Journal of Systems Science, 30(10):1123-1129.

[7] Malik, S.C., Bhardwaj, R.K. and Grewal, A.S. (2010). Probabilistic analysis of a system of two nonidentical parallel units with priority to repair subject to inspection. Journal of Reliability and Statistical Studies, 3(1):1-11.

[8] Yu, X. and Khambadkone, A.M. (2012). Reliability analysis and cost optimization of parallel-inverter system. IEEE Transaction on Industrial Electronics, 59(10):3881-3889.

[9] Rathee, R. and Malik,S.C. (2013). A parallel system with priority to preventive maintenance subject to maximum operation and repair times. American Journal of Mathematics and Statistics, 3(6):436-444.

[10] Shivkumar, M. and Jayanth, M.K. (2014). Reliability analysis of link stability in secured routing protocols for MANETs. Engineering Journal, 18(1):65-76.

[11] Kakkar, M.K., Chitkara, A.K. and Bhatti, J. (2015). Reliability analysis of two-unit parallel repairable industrial system. Decision Science Letters, 4(4):525-536.

[12] Bhardwaj, N. and Parasher, B. (2017). Stochastic analysis of two identical cold standby units with geometric failure and repair rates. Mathematical Journal of Interdisciplinary Sciences, 5:131-142.

[13] Pundir, P.S., Patawa, R. and Gupta, P.K. (2018). Stochastic outlook of two non-identical unit parallel system with priority in repair. Cogent Mathematics & Statistics,5(1):1-18.

[14] Chopra, G. and Ram, M. (2019). Reliability measures of two dissimilar unit parallel system using gumbel-hougaard family copula. International Journal of Mathematical, Engineering and Management Sciences, 4(1):116-130.

[15] YangLing, L., GenQi, X. and Hao, C. (2021). Analysis of two components parallel repairable degenerate system with vacation. AIMS Mathematics, 10:10602-10619.

[16] Dabas, N. and Rathee, R. (2022). Parallel system reliability analysis with priority and inspection using semi-Markov approach. Reliability: Theory and Applications, 17(2):56-66.

[17] Dabas, N. and Rathee, R. (2022). Reliability analysis of parallel system using inspection for repair activities. International Journal of Agricultural Statistical Sciences, 18(2):899-906.

[18] El-Sherbeny, M.S. and Hussien, Z.M. (2022). Reliability analysis of a two nonidentical unit parallel system with optional vacations under poison shocks. Mathematical Problems in Engineering. https://doi.org/10.1155/2022/2488182.

[19] Lou,V. (2021). Higher turndown ratios, parallel cascading are keys to efficiency. https://www.pmmag.com/articles/103686,.

i Надоели баннеры? Вы всегда можете отключить рекламу.