S.R. Sruthi and Dr.P.R. Jayashree RT&A, No 4 (59) RAM ANALYSIS OF Er/M/1/N QUEUEING SYSTEM_Volume 15, December 2020
RAM Analysis of Er/M/1/N Phase-Type Queueing System with Working and Working-Breakdown States
S.R. Sruthi
Research Scholar, Department of Statistics,
Presidency College (Autonomous), Chennai-05. email: [email protected]
Dr.P.R. Jayashree
Assistant Professor, Department of Statistics Presidency College (Autonomous), Chennai-05. email: [email protected]
Abstract
In this paper, the Reliability, Availability and Maintainability (RAM) analysis for the finite capacity Erlangian Phase-type Queueing model is studied with regard to failure and recovery rates. The arrival process of the machines to repair is assumed to follow Erlang distribution and the service process is exponentially distributed in FCFS discipline. Apart from the multi-phases in the queueing system two different environmental states such as the working and working-breakdown states were also taken into consideration. The transient state differential-difference equations for the general case and for the special case of N=5 is obtained. The results are presented numerically and graphically along with some special metrics such as MTBF and MTTR. The sensitivity analysis is also performed to find changes in different parametric values for the model.
Keywords: Availability, Erlang distribution, Multi-phase queueing system, Maintainability, Reliability, Sensitivity Analysis.
I. Introduction
Queueing theory was developed in order to provide models to predict the behaviour of systems that aims to provide service for randomly arising demands. Any system in which arrivals place demands upon a finite capacity resource may be determined as queueing system. In order to describe the queueing of systems more effectively it is necessary to understand Erlang theory. The main assumption of the Erlang in queueing model is that the calls arrive as a Poisson process and when there is more than one inter-related Poisson process occurring in phases it is considered to be Phase-Type distribution with continuous variable. Thus, in Phase-Type theory Erlang distribution is considered to be a special case. The phase-type distribution and phase-type renewal processes were introduced by Neuts [7], who formed the substrata for the definition of the N-process and the Markov-modulated Poisson process (MMPP). Binkowski and Carragher [3] employed an Er/Ek/1/N queuing system to model the operation of a stockyard mining. Baba [2] studied GI/M/1 queue with working vacations by using the matrix analytic method and subsequently, for the queue with working vacation and vacation interruption. Plumchitchom and Thomopoulos [8]
made a study on a single-server queuing system with Erlang distributed inter-arrival and service times, Li et al. [5] studied the GI/M/1 queue such that the vacation time follows an exponential distribution.
Along with Queueing of the systems, it is also important to analyze the performance of the industrial systems by using the most important metric such as the Reliability. In order to receive effective results in the Industrial systems it is proved to analyze the Availability and Maintainability of the machines along with Reliability. Performance modelling and availability analysis are applied by many researchers on different industrial systems such as the paper plant, paint, and thermal power plant Industry etc., Singh, and Goyal, [11] developed a methodology to study the transient behaviour of repairable mechanical biscuit shaping system on a biscuit manufacturing plant for determining the availability of the system based on Markov modelling. Lin, et al. [6] made a study on reliability using both classical and Bayesian semi-parametric frameworks, they illustrated modelled a wheel- set's degradation data and analyzed to ease the calculation of system reliability during applying preventive maintenance. The differential equations have been solved using Laplace Transforms. These Laplace Transform are commonly used in the transient state to obtain the state probabilities. Aggarwal, et. al. [1] presented a model using Markov birth-death process with the concept of fuzzy reliability and availability assuming that the failure and repair rates of each subsystem as exponential distribution.
In this paper RAM analysis of the Er/M/1 finite space queueing model for different environmental states such as the Working state and the Working-Breakdown state is studied. The differential-difference equations for the model are formed and a special case of N=5 is considered. The transient equations are solved using Fourth-Order Runge Kutta numerical method. The results are shown numerically and graphically for reliability, availability and maintainability analysis for the queueing system. The Sensitivity Analysis is also carried out for the changes in different parametric values involved in the model.
The following are the assumptions that are used in this model:
> The arrival of machines for repair to the queueing system is independent according to the Erlang process with a constant parameter A
> The service process is exponentially distributed with First Come First Service (FCFS) queue discipline
> When the system is in the working state (i.e., there should be at least one machine) failure occurs at the interarrival phase which is also exponentially distributed and once the failure occurs in the system the process is moved to the working-breakdown state where the it is performed at a low rate
> Whenever working-breakdown occurs in the system, it is immediately recovered in the recovery state which is also exponentially distributed. Once the system recovers it performs its activity at a normal arrival rate
> All inter-arrival times and the service times are independent of each other The following are the notations that are used in this paper:
N(t) : Total no of machines in the system at any time t
Er : Erlang distribution with r identical phases
S(t) : The environmental state at any instant of time t which is
II. Assumptions and Notations
A ^2
given by
[0, if the server is in the working environment state for Phase 1 & 2 [ 1, if the server is in the working breakdown state for Phase 1 & 2 Arrival rate
Service rate for working state
Service rate for working-breakdown state (|j! > ^2).
a : Failure rate of the queueing system
p : Recovery rate of the queueing system
The transient state-probabilities that are used in this model:
P0,0,0(t): Probability of arrival of a machine (i.e., at least one
machine) in the system Pn, i, j(t): Probability that there are (n-1) machines in the system with
i (i=0, 1, ..., r) phases and j (j=1,2) states
III. Description of the model
The RAM analysis of an Erlang phase type arrival and single server queue with finite capacity queueing system is considered. The arrival of machines to repair follows Erlang distribution with the parameter rA is used for this model. Two different service mechanisms are exponentially distributed with parameters and ^2 are considered for this model based on the environmental states namely, working and working break-down states respectively. When the system is not empty (i.e., at least one machine in the system) failure occurs in the arrival process of the system with the failure rate a. Therefore, whenever failure occurs it is immediately recovered in the recovery state with rate p. The failure and recovery rate are assumed to be exponentially distributed. The state-transition diagram for the RAM analysis of the phase type Erlang queuing model is presented in Figure 1:
Figure 1: State-Transition Diagram of Er/M/1
By using the state-transition diagram, the transient state differential-difference equations are formed for the Erlangian Phase-type queueing model with working and working-breakdown states.
WORKING STATE
dPu,0( t)
dt
dPn,1,0 (t) dt
dPN ,1,0 (t) dt
dP0,r ,0( t) dt
dPn ,r ,0( t) dt
dPN ,r ,0( t) dt
= MPn+1,1,0(t) + ^P,,1,0(t) - (rA + a)P0,1,0(t),
= rAPn-1,r,o(t) + ^^Pn+1,1,o(t) + 3P,,u(t) - (rA + m + a)Pn,1,o(t),
= rAPN-1,1,0 (t) + (3Pn,1,1(t) - (M + rA + ^1)Pn,1,0 (t),
= MP„+1,r,0(t) + ^P0,r,0(t) + rAP0,r-1,0(t) - (rA + a)P0^(t), = rAPn-1r-1,0(t) + M1Pn+1,r,0 (t) + (3Pn,r,1(t) - (rA + m + a)Pn,r,0(t), = rAPN-1,r,0 (t) + J3Pn,r,1(t) - (M + a)Pn,r,0(t),
WORKING - BREAKDOWN STATE
dPo,1,1 (t)
dt
dPn,1,1 (t) dt
dPN ,1,1 (t) dt dP0,r ,1( t) dt dPn ,, ,1( t) dt
dPN ,r ,1( t) dt
= M2P,1,1(t) + aP0,1,0 (t) - (rA + /)P0,1,1(t),
= rAPn-1,r,1(t) + M2Pn+1,r-1,1(t) + aPn,1,0(t) - (rA + M2 + (3)P„M(t), = rAPN-1,r,1(t) + aPN,1,1 (t) - (M2 + rA + /)Pn,u(t), = M2P,+1,r,1(t) + aP0,r,0(t) + rAP0,r-1,1 (t) - (rA + /)P0,1,1(t), = rAPn-1,r,1(t) + M2Pn+1,r,1(t) + aPn r,0(t) - (rA + M2 + 3)Pn,r,1(t), = rAPN-1,r,1(t) + aPN,r,0(t) - (M2 + 3)Pn,r,1(t),
n=0 n > 1 n=N n=0 n > 1 n=N
n=0 n > 1 n=N n=0 n > 1 n=N
(3.1)
(3.2)
(3.3)
(3.4)
(3.5)
(3.6)
(3.7)
(3.8)
(3.9)
(3.10)
(3.11)
(3.12)
without loss of generality the initial state conditions are given by P0,0,0(0) = 0, Pn,i, J (0) = 0, Vn = 1,2,..., N; i=1,2; j=0,1 The system reliability at time t is calculated as follows:
N 2 1
R(t)=Y Y Y
n = 0 i=1 J=0
(3.13)
The system Availability at time t is calculated by considering all the working states is as follows:
" n,i,J
A(t)=YYYP
n=0!=1 J=0 (3.14)
The system Maintainability at time t is calculated by considering working-breakdown state which is calculated as follows:
N 2
M (t)=Y Y Ypn,t,j
n=0 *=1 J=1 (3.15)
Apart from the RAM, the special metrics such as MTBF (Mean time between failures) and MTTR (Mean Time till Recovery) are also calculated as follows:
MTBF = — a
MTTR = —
3
N 2
IV. Special case
The differential-difference equations for N=5 is formed for the transient state of the Reliability model for the Erlangian Phase-type queueing system. The equations for the working and working-breakdown states are given below:
WORKING STATE
dPo, i, o( t )
= mP, i,o(t) + J3PoXi(t) - (2 A + a)Po,i,o(t)
= 2APo,2,o(t) + MiP>,i,o(t) + PP,i,i(t) - (2A + m + a)Pi i o(t),
= 2AP,2,o(t) + MP,,i,o(t) + PP>,i,i(t) - (2A + Mi + a)P21o(t),
= 2AP,,2,o(t) + M P4, i ,o(t) + PP3,i , i (t) - (2A + Mi + a)P3 i ,o(t), = 2AP,,2,o(t) + PP4, i , i(t) - (2A + Mi + a)P4, i ,o(t), = m Pi ,2,o(t ) + PPo,2, i (t ) + 2APo, i ,o(t ) - (2 A + a) Poao(t )
= M P2,2,o(t) + PP,2, i (t) + 2AP , i ,o(t) - (2A + Mi + a)P ,2,o(t),
= 2AP2, i ,o + MiP»,2,o(t) + PP2,2, i (t) - (2A + M + a)P2,2,o(t), = 2AP3, i ,o + MP4,2,o(t) + PP>,2, i(t) - (2A + M + a)P3,2,o(t), = 2AP4, i ,o(t) + P4,2, i (t) - (M + a)P4,2,o(t),
dt dPi , ! ,o( t ) dt dP2, ! ,o( t ) dt dpi, ! ,o( t ) dt dP4, ! ,o( t ) dt
dPo,2,o(t ) dt dPi ,2,o ( t ) dt
dP,,2,o( t ) dt dPi,2,o( t ) dt
dP4,2,o( t ) dt
WORKING - BREAKDOWN STATE
dPo, ! , t ) dt dPx , ! , ! ( t ) dt dP2, ! , ! ( t ) dt d!\! , ! (t) dt dP4, ! , ! ( t ) dt dPo,2,! (t) dt dPx ,2, ! ( t ) dt dP2,2, ! (t) dt dPi,2, ! ( t )
dt
= M2P , i , i (t) + aPo, i ,o(t) - (2 A + P)Po, i , i (t),
= 2APo,2, i (t) + M2P2, i , i (t) + aP , i ,o(t) - (2A + M2 + P)Pi, i , i (t),
= 2AP ,2, i (t) + M2P3, i , i (t) + aP2, i ,o(t) - (2A + M2 + P)P2, i , i (t),
= 2AP2 2, i (t) + M2P4, i , i (t) + aP,,i ,o(t) - (2A + M2 + P)P3, i , i (t),
= 2AP3 2, i (t) + aP4, i ,o(t) - (M2 + 2A + P)P4, i , i (t), = M2P ,2, i (t) + aPo,2,o(t) + 2APo, i , i (t) - (2A + P)Po,2, i (t), = M2P2,2, i (t) + aPi,2,o(t) + 2APo, i , i (t) - (2A + M2 + P)P ,2, i (t),
= 2AP , i , i (t) +M2P3,2,i (t) +aP2,2,o(t) - (2A + M2 +P)P2,2,i (t), = 2AP2, i , i (t) + M2P4,2, i (t) + aP3,2,o(t) - (2A + M2 + P)P3,2, i (t),
dP.
dt
■ = 2AP3, i , i (t) + aP4,2,o(t) - (M2 + P)P4,2, i (t),
(3.1.1)
(3.1.2)
(3.1.3)
(3.1.4)
(3.1.5)
(3.1.6)
(3.1.7)
(3.1.8)
(3.1.9) (3.i.i o)
(3.1.11)
(3.1.12)
(3.1.13) (3.i . i4)
(3.1.15)
(3.1.16) (3.i.i 7) (3.i.i 8) (3.i.i9) (3.i.2Q)
V. Numerical illustration
The transient behaviour of the Reliability, Availability and Maintainability for the Erlangian Phase-Type queueing model of N=5, has been analyzed and are solved by using Fourth-Order Runge-Kutta numerical method. Assuming the time range from t=0 to t=200 (in hours) and the parametric values as A=0.6, ^1=1.0, ^2=0.7, a=0.05, p=0.03, the values of Pn(t), the transient
probabilities are obtained by solving the system of equations 3.1.1- 3.1.20.
Figure 2 shows the probability distribution, Pn(t), time-dependent total system size for the queueing system. The probability curves are displayed to understand the distribution trend of the system probabilities over the specified time interval.
Figure 2
Figure 3, represents the Reliability of the system of the Erlangian Phase-Type queueing model. It is found out that as time increases the reliability of the system decreases. The reliability of the system is found out to be 38% after 200 hours. Figure 4, shows the Availability of the system and it is found out that as time increases the availability of the system decreases. Figure 5, depicts the maintainability of the system of the Erlangian Phase-Type queueing model. It is seen that as time increases the maintainability of the system increases. It is found out that the Maintainability of the system is 62% after 200 hours. The values of MTBF (Mean Time Between Failures) and MTTR (Mean Time till Repair) for the Erlangian Phase-Type Queueing system are found to be 20 hours/failure and 33 hours/recovery.
Figure 3
Figure 4
Figure 5
VI. Sensitivity analysis
For different parametric values sensitivity analysis has been carried out for RAM model for the Erlangian Phase-Type queueing model. Figures 6,7 and 8 shows the Reliability, Availability and Maintainability for different sets of Failure rates (0.05,0.06,0.07). By keeping other parameters constant, it is observed that as the failure rate value increases Reliability and Availability of the system decreases, whereas Maintainability of the system increases.
RELIABILITY AVAILABILITY
Figure 6 Figure 7
S.R. Sruthi and Dr.P.R. Jayashree RT&A, No 4 (59) RAM ANALYSIS OF Er/M/1/N QUEUEING SYSTEM_Volume 15, December 2020
MAINTAINABILITY
0 50 100 150 200
Time
Figure 8
Figures 9 and 10 illustrates Reliability and Maintainability of the system for different Recovery rates (0.03,0.04,0.05) by keeping the other parameters constant. It can be seen from the graph that as the recovery rate value increases the Reliability of the system increases whereas Maintainability decreases.
RELIABILITY MAINTAINABILIW
10 i
0.6
0 50 100 150 200 0 50 100 150 200
Time Time
Figure 9 Figure 10
Table 1, represents the changes in the Reliability, Availability and Maintainability of the system for different values of arrival rates and failure rates by keeping the other parameters constant. It is found out that as the failure rate value increases keeping the arrival rate constant Reliability and Availability of the system decreases whereas the Maintainability of the system increases. It is also found that after 100 hours the Reliability, Availability and Maintainability of the system becomes constant.
Table 1: Sensitivity Analysis for the change of Arrival (0.1,0.2,0.3) and Failure (0.03,0.04,0.05) rate
values
ARRIVAL RATE Vs FAILURE RATE
TIME A=0.1 A=0.2 A=0.3
R(t) M(t) A(t) R(t) M(t) A(t) R(t) M(t) A(t)
a1=0.03 0.4014 0.5986 0.3012 0.4116 0.6004 0.3112 0.4218 0.6115 0.3213
40 a1=0.04 0.3083 0.6917 0.2019 0.3185 0.7019 0.2120 0.3287 0.7121 0.2221
a1=0.05 0.2423 0.7577 0.1353 0.2525 0.7679 0.1455 0.2627 0.7781 0.1556
60 a1=0.03 0.3180 0.6820 0.1653 0.3283 0.6922 0.1755 0.3386 0.7024 0.1857
a1=0.04 0.2398 0.7602 0.0907 0.2400 0.7704 0.1009 0.2502 0.7806 0.1911
a1=0.05 0.1894 0.8106 0.0498 0.1996 0.9007 0.0599 0.2008 0.9109 0.06
80 a1=0.03 0.2806 0.7194 0.0907 0.2907 0.7295 0.0948 0.3008 0.7310 0.1909
a1=0.04 0.2147 0.7853 0.0408 0.2248 0.7954 0.0509 0.2349 0.8057 0.061
a1=0.05 0.1735 0.8265 0.0183 0.1836 0.8367 0.0285 0.1937 0.8469 0.0387
100 a1=0.03 0.2637 0.7363 0.0498 0.2738 0.7466 0.0599 0.2839 0.7578 0.0611
a1=0.04 0.2054 0.7946 0.0183 0.3055 0.8047 0.0285 0.4056 0.8149 0.0387
a1=0.05 0.1687 0.8313 0.0067 0.1788 0.8415 0.0168 0.1889 0.8517 0.0269
120 a1=0.03 0.2562 0.7438 0.0273 0.2562 0.7438 0.0273 0.2562 0.7438 0.0273
a1=0.04 0.2020 0.7980 0.0082 0.2020 0.7980 0.0082 0.2220 0.7980 0.0082
a1=0.05 0.1673 0.8327 0.0025 0.1673 0.8327 0.0025 0.1673 0.8327 0.0025
Table 2, shows the changes in the Reliability, Availability and Maintainability of the system for different values of failure rates and service rates for the Working State by keeping the other parameters constant. As the Failure rates increases keeping the service rate constant, Reliability and Availability of the system decreases but the Maintainability of the system increases.
Table 2: Sensitivity Analysis for the change of Working State in Service rate (0.7,0.8,0.9) and
Failure (0.03,0.04,0.05) rate values
FAILURE RATE Vs SERVICE RATE
TIME |1=0.7 |1=0.8 |1=0.9
R(t) M(t) A(t) R(t) M(t) A(t) R(t) M(t) A(t)
40 a1=0.04 0.3083 0.6917 0.2019 0.3185 0.6815 0.2007 0.3287 0.6713 0.1995
a1=0.05 0.2423 0.7577 0.1353 0.2525 0.7475 0.1251 0.2627 0.7373 0.1149
a1=0.06 0.1950 0.8050 0.0907 0.2042 0.8028 0.0890 0.2144 0.7996 0.0800
60 a1=0.04 0.2398 0.7602 0.0607 0.2400 0.7580 0.0595 0.2502 0.7499 0.05
a1=0.05 0.1894 0.8106 0.0498 0.1996 0.8004 0.0396 0.2098 0.7992 0.0294
a1=0.06 0.1557 0.8443 0.0273 0.1659 0.8341 0.0171 0.1761 0.8239 0.0069
80 a1=0.04 0.2147 0.7853 0.0408 0.2248 0.7752 0.0307 0.2349 0.7651 0.0206
a1=0.05 0.1735 0.8265 0.0183 0.1836 0.8164 0.0172 0.1937 0.8063 0.0163
a1=0.06 0.1460 0.8540 0.0082 0.1561 0.8439 0.0069 0.1662 0.8338 0.0040
100 a1=0.04 0.2054 0.7946 0.0183 0.2155 0.7845 0.0082 0.2256 0.7744 0.0020
a1=0.05 0.1687 0.8313 0.0067 0.1788 0.8212 0.0056 0.1889 0.8111 0.0035
a1=0.06 0.1436 0.8564 0.0025 0.1537 0.8463 0.0008 0.1638 0.8362 0.0002
120 a1=0.04 0.2020 0.7980 0.0082 0.2020 0.7980 0.0082 0.2020 0.7980 0.0082
a1=0.05 0.1673 0.8327 0.0025 0.1673 0.8327 0.0025 0.1673 0.8327 0.0025
a1=0.06 0.1430 0.8570 0.0007 0.1430 0.8570 0.0007 0.1430 0.8570 0.0007
Table 3, depicts the changes in the Reliability and Maintainability of the system for different set of values of Arrival rate and Recovery rate by keeping the other parameters constant. As the recovery rate value increases by keeping the Arrival rate constant it is found that the Reliability of the system increases but the Maintainability of the system decreases.
Table 3: Sensitivity Analysis for the change of Arrival (0.1,0.2,0.3) and Recovery (0.01,0.02,0.03)
rate values
ARRIVAL RATE Vs RECOVERY RATE
TIME A=0.1 A=0.2 A=0.3
R(t) M(t) R(t) M(t) R(t) M(t)
ß1=0.01 0.4014 0.5986 0.4117 0.5883 0.4222 0.5779
40 ß1=0.02 0.4812 0.5188 0.4917 0.5084 0.5021 0.4890
ß1=0.03 0.5454 0.4546 0.5554 0.4443 0.5655 0.4340
60 ß1=0.01 0.3180 0.6820 0.3288 0.6719 0.3395 0.6616
ß1=0.02 0.4299 0.5701 0.4301 0.5698 0.4411 0.5597
ß1=0.03 0.5137 0.4863 0.5239 0.4762 0.5341 0.4661
80 ß1=0.01 0.2806 0.7194 0.2909 0.7092 0.3013 0.7009
ß1=0.02 0.4110 0.5890 0.4211 0.5787 0.4314 0.5685
ß1=0.03 0.5041 0.4959 0.5144 0.4858 0.5249 0.4757
100 ß1=0.01 0.2637 0.7363 0.2741 0.7262 0.2845 0.7161
ß1=0.02 0.4040 0.5960 0.4142 0.5859 0.4244 0.5757
ß1=0.03 0.5012 0.4988 0.5113 0.4886 0.5214 0.4784
120 ß1=0.01 0.2562 0.7438 0.2562 0.7438 0.2562 0.7438
ß1=0.02 0.4015 0.5985 0.4015 0.5985 0.4015 0.5985
ß1=0.03 0.5004 0.4996 0.5004 0.4996 0.5004 0.4996
Table 4, illustrates the changes in the Reliability and Maintainability of the system for different set of values of service rates and recovery rates keeping the other parameters constant. The table shows that as the Recovery rate values increases by keeping Service rate constant it is found that Reliability of the system increases whereas the Maintainability of the system decreases.
Table 4: Sensitivity Analysis for the change of Recovery rate (0.7,0.8,0.9) and Service rate
(0.01,0.02,0.03) values
RECOVERY RATE Vs SERVICE RATE
TIME |1=0.7 |1=0.8 |1=0.9
R(t) M(t) R(t) M(t) R(t) M(t)
ß1=0.01 0.4014 0.5986 0.4115 0.5884 0.4216 0.5782
40 ß1=0.02 0.4812 0.5188 0.4913 0.5086 0.5014 0.5004
ß1=0.03 0.5454 0.4546 0.5557 0.4444 0.5659 0.4342
60 ß1=0.01 0.3180 0.6820 0.3283 0.6718 0.3285 0.6616
ß1=0.02 0.4299 0.5701 0.4300 0.5699 0.4311 0.5597
ß1=0.03 0.5137 0.4863 0.5239 0.4761 0.5341 0.4659
80 ß1=0.01 0.2806 0.7194 0.2709 0.7092 0.2612 0.7009
ß1=0.02 0.4110 0.5890 0.4213 0.5789 0.4315 0.5688
ß1=0.03 0.5041 0.4959 0.5144 0.4858 0.5247 0.4757
100 ß1=0.01 0.2637 0.7363 0.2739 0.7262 0.2841 0.7161
ß1=0.02 0.4040 0.5960 0.4142 0.5859 0.4244 0.5758
ß1=0.03 0.5012 0.4988 0.5113 0.4887 0.5214 0.4786
120 ß1=0.01 0.2562 0.7438 0.2562 0.7438 0.2562 0.7438
ß1=0.02 0.4015 0.5985 0.4015 0.5985 0.4015 0.5985
ß1=0.03 0.5004 0.4996 0.5004 0.4996 0.5004 0.4996
Conclusion
RAM analysis of Er/M/1/N Queueing model with two different environmental states are studied in this paper. The state-transition diagram for the transient state of the r phase Erlangian queueing model is formed from which the differential-difference equations are obtained. A special case of N=5 is solved using Fourth-Order Runge-Kutta numerical method. It is observed that as
time increases Reliability and Availability decreases, whereas Maintainability increases. In order to
find the failure rate and the recovery rate, MTBF and MTTR of the Erlangian Queueing model was
calculated. Sensitivity values becomes constant after 100 hours for different parametric values.
References
1. Aggarwal, S. Kumar, V. Singh, "Mathematical modelling and fuzzy availability analysis for serial processes in the crystallization system of a sugar plant", Journal of Industrial Engineering International, Vol.13, 2017, 47-58.
2. Baba, Y. (2005). Analysis of a GI/M/1 queue with multiple working vacations. Operations Research Letters, 33: 201-209
3. M. Binkowski and B. J. McCarragher "A Queueing Model for the Design and Analysis of a Mining Stockyard ", Discrete Event Dynamic Systems: Theory and Applications, Vol. 9, No. 1, pp. 75-98, 1999
4. M. Kumar, V. Modgil, and V.Singla, "Mathematical Modelling and Availability Analysis of Packaging Section in a Paint Industry: A Case Study", International Journal of Engineering Technology Science and Research, Vol. 2, 2015, 179 - 185.
5. Li, J., Tian, N. & Ma, Z. (2008). Analysis of GI/M/1 queue with working vacations and vacation interruption. Applied Mathematical Modelling, 32:2715-2730
6. J. Lin, J. Pulido, M. Asplund, "Reliability analysis for preventive maintenance based on classical and Bayesian semi-parametric degradation approaches using locomotive wheel-sets as a case study", Reliability Engineering and System Safety, Vol. 134, 2015, 143-156.
7. M.F. Neuts "Structured stochastic matrices of M/G/1 type and their applications", Marcel Dekker, New York (1989)
8. N. Plumchitchom and N. T. Thomopoulos "The Queueing Theory of the Erlang Distributed Interarrival and Service Time", Journal of Research in Engineering and Technology, Vol. 3, No. 4, pp. 1-14, 2006
9. S. K. Rajiv, and S. Pooja, "Computing RAM Indices for Reliable Operation of Production Systems", Advances in Production Engineering & Management, Vol. 7, 2012, 245-254.
10. R. K. Sharma, and S. Kumar, "Performance modelling in critical engineering systems using RAM analysis", Reliability Engineering & System Safety, Vol.93, Issue 6, 2008, 913-919.
11. P. Singh and A. Goyal," Behaviour Analysis of a Biscuit Making Plant using Markov Regenerative Modelling", International Journal on Theoretical and Applied Research in Mechanical Engineering (IJTARME), Volume-2, 2013, 2319 - 3182.
12. I.Yusuf, and N. Hussaini,' Evaluation of Reliability and Availability Characteristics of 2-out of -3 Standby System under a Perfect Repair Condition", American Journal of Mathematics and Statistics, Vol. 2, 2012, 14-119.
Received: August 18, 2020 Accepted: Oktober 12, 2020