Научная статья на тему 'Public-Private Partnership Agreement in the Context of the Matrix for Assessing their Legal Parameters and Digitalization'

Public-Private Partnership Agreement in the Context of the Matrix for Assessing their Legal Parameters and Digitalization Текст научной статьи по специальности «Право»

CC BY
0
0
i Надоели баннеры? Вы всегда можете отключить рекламу.
Область наук
Ключевые слова
agreement / conflict of interest / contract / digital technologies / digitalization / law / legal assessment / public-private partnership / restraint of competition / risk management / государственно-частное партнерство / контракт / конфликт интересов / ограничение конкуренции / право / соглашение / управление рисками / цифровые технологии / цифровизация / юридическая оценка

Аннотация научной статьи по праву, автор научной работы — Dominique T. Molintas

Objective: by reviewing the legal aspects of public-private partnership agreements, to synthesize their main provisions into a common matrix, which, when digitized, can be used to standardize and simplify the formulation of agreement parameters. Methods: the author relied on comparative-legal analysis of scientific literature, legislation and Internet sources on public-private partnership, supplemented by a review of public-private partnership agreements in various socio-political spheres, which made it possible to create a science-based and practice-oriented matrix that can serve as a tool for drafting public-private partnership agreements. Results: national aspects in the legal regulation of the said relations in different countries were highlighted; a number of peculiarities encountered in public-private partnership agreements were described. Scientific novelty: taking into account the most important legal peculiarities characteristic of different countries, a matrix for drafting public-private partnership agreements is presented, including eight main parameters: 1 – value received, scope, benefits and risks, 2 – route to market, 3 – restraint of competition, 4 – conflict of interest and procurement issues, 5 – powers, approvals, legal assessment, 6 – liabilities, dispute resolution, 7 – ownership structure, governance and level of autonomy, 8 – exit strategies. Depending on the priorities identified, the matrix can be modified, taking into account that priorities define and shape the specific parameters of each individual partnership. Practical significance: the matrix obtained can become a planning tool used to analyze and understand the relationships between the eight legal parameters necessary for the formation of relations in the sphere of public-private partnership. It may serve as a legal reference point for the formulation of public-private partnership agreements around the world, and will contribute not only to the revitalization of public-private partnerships, but also to a proper understanding of obligations, responsibilities and limitations. The recommendations provided in the study show direction for the evaluation of public-private partnerships, allowing clear conclusions to be drawn about the partnership. Digital accessibility provided, the proposed matrix will be of interest to many organizations that use public-private partnerships in their professional activities. For citation

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Соглашение о государственно-частном партнерстве в контексте матрицы оценки их юридических параметров и цифровизации

Цель: путем рассмотрения юридических аспектов соглашений о государственно-частном партнерстве синтезировать их основные положения в общую матрицу, которую при переводе в цифровой формат можно использовать в интересах стандартизации и упрощения формулирования параметров соглашения. Методы: автор опирался на сравнительно-правовой анализ научной литературы, законодательства и интернет-источников по государственно-частному партнерству, дополненный рассмотрением соглашений о государственно-частном партнерстве различной социально-политической направленности, что позволило создать научно-обоснованную и практико-ориентированную матрицу, которая может послужить инструментом при составлении соглашений о государственно-частном партнерстве. Результаты: выделены национальные аспекты в правовом регулировании обозначенных отношений в различных странах и описан ряд особенностей, встречающихся в соглашениях о государственно-частном партнерстве. Научная новизна: с учетом важнейших правовых особенностей, характерных для разных стран, представлена матрица для составления соглашений о государственно-частном партнерстве, включающая восемь основных параметров: 1 – полученную стоимость, масштаб, выгоды и риски, 2 – выход на рынок, 3 – ограничение конкуренции, 4 – конфликт интересов/закупки, 5 – полномочия, одобрение, юридическая оценка, 6 – обязательства, разрешение споров, 7 – структуру собственности, управление и уровень автономии, 8 – стратегии выхода. В зависимости от обозначенных приоритетов ее можно модифицировать, учитывая, что приоритеты определяют и формируют конкретные параметры каждого отдельного партнерства. Практическая значимость: полученная в результате исследования матричная схема может стать инструментом планирования, используемым для анализа и понимания взаимосвязей между восемью юридическими параметрами, необходимыми для формирования отношений в сфере государственно-частного партнерства. Она послужит юридическим ориентиром для формулирования соглашений о государственно-частном партнерстве, используемых во всем мире, и будет способствовать не только активизации государственно-частного партнерства, но и правильному пониманию обязательств, объемов ответственности и ограничений. Приведенные в исследовании рекомендации задают направление для оценки государственно-частного партнерства, позволяя сделать четкие выводы о партнерстве. При условии цифровой доступности предложенная матрица будет представлять определенный интерес для многих организаций, использующих государственно-частное партнерство в своей профессиональной деятельности.

Текст научной работы на тему «Public-Private Partnership Agreement in the Context of the Matrix for Assessing their Legal Parameters and Digitalization»

Research article

UDC 34:004:347.4:004.4

EDN: https://elibrary.ru/lvpigr

DOI: https://doi.org/10.21202/jdtl.2024.22

3

Check for updates

Public-Private Partnership Agreement in the Context of the Matrix for Assessing their Legal Parameters and Digitalization

Dominique T. Molintas ©

PATTS College of Aeronautics, Paranaque, Philippines; Griffith University, Queensland, Australia

Keywords

agreement, conflict of interest, contract,

digital technologies,

digitalization,

law,

legal assessment, public-private partnership, restraint of competition, risk management

Abstract

Objective: by reviewing the legal aspects of public-private partnership agreements, to synthesize their main provisions into a common matrix, which, when digitized, can be used to standardize and simplify the formulation of agreement parameters.

Methods: the author relied on comparative-legal analysis of scientific literature, legislation and Internet sources on public-private partnership, supplemented by a review of public-private partnership agreements in various socio-political spheres, which made it possible to create a science-based and practice-oriented matrix that can serve as a tool for drafting public-private partnership agreements.

Results: national aspects in the legal regulation of the said relations in different countries were highlighted; a number of peculiarities encountered in public-private partnership agreements were described.

Scientific novelty: taking into account the most important legal peculiarities characteristic of different countries, a matrix for drafting public-private partnership agreements is presented, including eight main parameters: 1 - value received, scope, benefits and risks, 2 - route to market, 3 - restraint of competition, 4 - conflict of interest and procurement issues, 5 - powers, approvals, legal assessment, 6 - liabilities, dispute resolution, 7 - ownership structure, governance and level of autonomy, 8 - exit strategies. Depending on the priorities identified, the matrix can be modified, taking into account that priorities define and shape the specific parameters of each individual partnership.

© Molintas D. T., 2024

This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (CC BY 4.0) (https://creativecommons.Org/licenses/by/4.0), which permits unrestricted re-use, distribution and reproduction, provided the original article is properly cited.

Practical significance: the matrix obtained can become a planning tool used to analyze and understand the relationships between the eight legal parameters necessary for the formation of relations in the sphere of public-private partnership. It may serve as a legal reference point for the formulation of public-private partnership agreements around the world, and will contribute not only to the revitalization of public-private partnerships, but also to a proper understanding of obligations, responsibilities and limitations. The recommendations provided in the study show direction for the evaluation of public-private partnerships, allowing clear conclusions to be drawn about the partnership. Digital accessibility provided, the proposed matrix will be of interest to many organizations that use public-private partnerships in their professional activities.

For citation

Molintas, D. T. (2024). Public-Private Partnership Agreement in the Context of the

Matrix for Assessing their Legal Parameters and Digitalization. Journal of Digital

Technologies and Law, 2(2), 430-449. https://doi.org/10.21202/jdtl.2024.22

Contents

Introduction

1. Value captured, scope, benefits and risks

1.1. Powers, approvals and due diligence

1.2. Ownership structure, governance and

1.3. Liabilities, dispute resolution

1.4. Exit strategies

2. Route to market

2.1. Powers, approvals and due diligence

2.2. Ownership structure, governance and

2.3. Liabilities, dispute resolution

2.4. Exit strategies

3. Restraint of competition

3.1. Powers, approvals and due diligence

3.2. Ownership structure, governance and

3.3. Liabilities, dispute resolution

3.4. Exit strategies

4. Conflict of interest / procurement issues

4.1. Powers, approvals and due diligence

4.2. Ownership structure, governance and

4.3. Liabilities, dispute resolution

4.4. Exit strategies

Conclusions

References

level of autonomy

level of autonomy

level of autonomy

level of autonomy

Introduction

Investing in built environment brings forth significant economic progress and social development. Built environment stimulates trade that results in output growth, increased microeconomic efficiency and reduced transaction costs (Jayachandran, 2021). In poor nations where one finds Government budgets already fully allocated, Public Private Partnerships PPP dominate the procurement platform for built environment (Moffatt & Kohler, 2008). Numerous PPP Contracts had been forged as a mechanism to raise risk tolerance and prolong project life1.

A compilation of critical legal points across regions, are put together in this study to form a matrix to digitalize of the legal features of PPP. A PPP requires a definitive instrument that outlines the understanding between the parties to the intended venture (Leigland, 2018). The contract ought to outline the contributions, expectations, obligations, rights, and duties and responsibilities of the parties. A contract sorts out the key elements such as the mechanism on how profits and liabilities are to be assigned, specifically to avoid disputes (Gonzalez-Ruiz et al., 2018).

To determine a best fit PPP contract, an appraisal tool is developed using a 4x4 matrix. The argument of function on the vertical axis and horizontal axes are defined below. Noteworthy legal points of different nations are highlighted in this study. These are particularly interesting stipulations that standout among the several Government contracts.

1. Value captured, scope, benefits and risks 1.1. Powers, approvals and due diligence

Chinese Law allows for the flexibility in the determination of both, the composition of board of directors alongside delimit of authority over the operations. Indonesian Law permits Government to enter into PPP Contract with private entities for infrastructure projects2. The process for entering into such contracts is governed by PPP laws and regulations, as well as Presidential Regulation No. 38 of 2015 for the co-operation between Government and the business entity for infrastructure development (Rybnicek et al., 2020; Buso et al., 2021).

PPP Contracts in the State of Queensland do not stipulate guarantees of the State over the obligations and performance over the partnership. In the United Kingdom, centralization and formality is a foremost concern over the creation of special purpose vehicles to ensure

1 The World Bank. (2017, April 27). PPP Reference Guide 3.0 (Full version). https://clck.ru/3AgJNx

2 Eddymurthy, I., & Mooduto, N. (2017). Joint ventures in Indonesia: overview. Jakarta: SSEK Indonesian Legal Consultants. https://clck.ru/3AgJS8

its function. Under Australian Law, the PPP is established when significant synergy is demonstrated. Such can be substantiated in increased export earnings or cheaper goods (Jokar et al., 2021). A PPP must substantiate efficiency or reduction in costs by reason of the activity that a project or program is being conducted by the group as a whole rather than by individual members of the group3.

1.2. Ownership structure, governance and level of autonomy

PPP is not expressly regulated under Japanese law and partnership contracts are regulated under the Civil Code Act No. 89 of 1896 and the Companies Act No. 86 of 20054. A PPP partner under Belgian legislation is expected to contribute 25 percent of the registered capital. The minimum capital share to establish PPP with a public company is €61,500. Indonesian Law5 stipulates PPPs in a legal entity that has limited liability status, under Company Law (Chen & Hubbard , 2012).

PPP Governance structures with high to activity in policy functions include: The Mission d'appui à la réalisation des partenariats public-privé /MAPPP6 as the governance institution in France; the Special Secretariat for PPPs Dissemination as the governance institution in Greece; the Unita Tecnicà Finanza di Progetto /UTFP, the technical unit for project financing in Italy7; in Portugal by the Commission for PPPs; and The United Kingdom for Infrastructure Local Partnerships (Demirag et al., 2011; Rybnicek et al., 2020; Ito, 2020).

1.3. Liabilities, dispute resolution

Indonesian Law stipulates the aggregate issued and paid-up share capital must be no less than 25 percent of the PPP authorized share capital. An exception for micro, small and medium enterprises, for authorized share capital below IDR50 million, stipulated in Government Regulation No. 29 of 2016, with flexible payment for shares can be made in cash or in kind. Legislation in Brazil8 stipulates a corporation and sociedades limitadas

Government of Australia. (2016). National Guidelines for Infrastructure Project Delivery. Canberra: The Department of Infrastructure, Transport, Regional Development, Communications and the Arts. https://goo.su/9k38lH

Association of Southeast Asian Nations. (1980). Supplementary Agreement to the Basic Agreement on Asean urea project. Indonesia. Jakarta. https://clck.ru/3AgJbY

Government of the Republic of Indonesia. (1979). Agreement between the Government of the Republic of Indonesia and the United Nations High Commissioner for Refugees regarding the Establishment of the Office of the UNHCR representative for Indonesia. Jakarta: Government of the Republic of Indonesia. https://goo.su/kUK0k

MAPPP - Mission to support the implementation of public-private partnership contracts. (In French). https://clck.ru/3AgJhn

Presidenza del Consiglio dei Ministri. (2010). Unita Tecnica Finanza di Progetto (UTPF). (In Italian). https://clck.ru/3AgJim

National Congress. (2004). Brazil's Public-Private Partnership Law. Brasilia: Lei de Licitaçôes e Contratos Administrativos. (In Portuguese). https://goo.su/yOEZc5

3

4

5

6

7

8

is to afford the limited liability protection to shareholders; except for environmental and anti-trust laws, anti-bribery, labour case laws and consumer laws—where a shareholder can become personally liable (Kurniawan et al., 2015; Wang, 2003).

Queensland Courts capacitate the PPP to apply for statutory order for a trust, sale or partition to resolve dispute resolution. At the same time, the parent company Board of Directors is accountable to ensure the guidelines are followed. Specifically for Public Private Partnerships in China, foreign participant is required to pledge no intention to intrude upon China's sovereignty or to exploit its resources (Salem, 1981); Legislation for PPP dispute9 resolution ought to avoid lengthy lead times before proceedings commence; and better not seek to oust the jurisdiction of the courts to give urgent interlocutory or final relief.

1.4. Exit strategies

A noticeable omission in Thai laws on early termination in the PISU Act, although it is featured in the EEC framework and the New PPP Act. In the event that early termination is not the fault of the private entity, Government is to appropriately compensate what is fair using proper calculation mechanism. This reflects the partnership concept and ensures private participation is carefully qualified. For cases where the early termination is because of acts or deeds by the private entity; the state is entitled to recover its loss arising out of such breach (Garg & Garg, 2016, Wegrich et al., 2017; Hart, 2003).

British Law permits the termination of PPP operations by mutual consent of the parties; otherwise a breach by one of the parties or by force majeure. In Korea, foreign-invested enterprises and assets invested by foreign investors are not subject to nationalization or seizure by the State. A foreign investor is permitted to reinvest a portion of profits, or the all of it within the territory of the DPRK (Lee, 2003).

Chinese Taxation Law encourages the deposit of funds in the Bank of China by permitting a tax refund on the reinvested amount. By so, the whole or part of the income tax already paid on the reinvested portion may be recovered. In the event that the nationalization or seizure by the State of enterprises and assets, fair compensation is to be paid (Jin & Huang, 2021).

US Security Exchange and Commission. (2008). Sino-Foreign Joint Venture Contract by and between Sun Far East Limited and Zibo Bao Kai Trading Company, LTD. for establishing Taixing Zhongneng Far East Silicon Co., LtD. USA: SEC. https://clck.ru/3AgJsr

9

2. Route to market

2.1. Powers, approvals and due diligence

In Spain, the Unión Temporal de Empresas \UTE, is the temporary consortium in effect for PPP. In the USA, the Special Purpose Vehicle dictates the areas of liability and allocation of exposure such as defense hold harmless provision and indemnification (DoD NASA, 2020; Noring, 2019). In Queensland Territory, when the disposal of a PPP Interest is decided in whole or in part; a Deed of Covenant is executed between existing parties and an incoming participant. AusTrade PPP Grant is a special Public Private Partnership where the Australian Government issues a Grant to SMEs to co-operate to pursue specific export activities. Approval enables the group to be eligible, to access the grant scheme of AU$ 150,000 annually10 at maximum.

2.2. Ownership structure, governance and level of autonomy

Public Private Partnership units structured under Ministries or institutions, having policy functions that churned out very low to medium activity, or closed down: Austria PPP Kompetenzzentrum; Czech Republic PPP Centrum; Denmark by the PPP knowledge unit; Netherlands by the PPS support; Serbia by the Odbor partnerskych projektov; Slovak Republic Sektor za upravljanje javnega premozenja or Division for public property management. Thai law stipulates the Cabinet as final approving authority to the private entity selection and the draft PPP contract during the procurement stage (Hennessey, 2021).

The role of the Cabinet during the procurement stage may be reduced in the upcoming New PPP Act to increase efficiency and flexibility in the PPP process (Mirzaee & Sardroud, 2022). National infrastructure procured through PPP includes the U-Tapao International Airport, High-speed railway connection to three major airports, Map Ta Phut Industrial Port Phase III, Laem Chabang Port Phase III and Digital Park Thailand11. Indian Law12 stipulates that the Government entity intending to enter PPP with the private sector must first explore the possibility of meeting objectives through alternate means, other than PPP (Selim & ElGohary, 2020). In Europe, the structure of the PPP must primarily be compatible with the internal market to promote economic development; particularly in regions where the standard of living is abnormally low or there is underemployment (Yurdakul et al., 2022). The EU regions referred to in Article 34913, in view of structural, economic and social situation.

10 Austrade Export Market Development Grants Canberra. (2020). https://goo.su/rnYK

11 Ponte, J. de. (2021). Delivering Thailand's Infrastructure Pipeline - The PPP push. Melbourne: DLA Piper Global Services LLP. https://clck.ru/3AgK8V

12 Ministry of Finance. (2009). Joint Ventures: a guidance note for public sector bodies forming joint ventures with the private sector. New Delhi: Government of India. https://clck.ru/3AgK9j

13 Hatton, C., Cardwell, D., & Botts, B. (2020, July 8). European Union: Joint Ventures. Global Competition Review. https://clck.ru/3AgKCF

2.3. Liabilities, dispute resolution

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Arbitration is not practiced under Cyprus legislation determined the District Courts as the competent authority to act on dispute resolution14. Indians Law determines the Government Directors on the Board of PPP accountable and liable for certain actions and decisions of the PPP; for any lapses or failures (Liu et al., 2016a; Ma et al., 2023; Liu et al., 2016b; Rufin & Rivera-Santos, 2012).

While in Europe, the European Economic Interest Group /EEIG are the established Council. The structure is defined through a contract made between the participants, who have joint liability for the debts and liabilities of the EEIG. Unless defined otherwise, the EEIG appoints the managers of the PPP (Whiteside, 2020).

Specific to Queensland Territory, the PPP contract include the right of access books and accounts of the GOC PPP by the GOC and its auditors. While under Chinese Law, PPP provides significantly greater degree of flexibility in determining the composition of the controlling organ of the joint venture than do a number of other socialist countries (Wang et al., 2019).

2.4. Exit strategies

British Law stipulates the termination of the PPP may be done by mutual agreement of the parties; otherwise by a breach by either one of the parties; or by force majeure.

PPP law in UK permits shareholder exit options through call options over a shareholder share or offering and pre-emptive right. European antitrust or competition laws underscore structure and purpose of the venture. The PPP must consider the market in which it competes, and any restrictions that it imposes on the parties that can generate efficiencies; otherwise encourage anti-competitive restriction, such as price-fixing or market sharing (Owen Liu, Xiong & Zhu, 2007).

PPP prescriptions observed under Emirati Law15 are presumed restrictive. These dictate confidentiality and non-solicitation clauses, prohibiting shareholders from soliciting for own purpose. The disposition and acquisition of shares that might contain 'piggyback', 'tag-along' or 'drag-along' rights in the event of a third- party share sale, such as pharmaceuticals industry or the petrochemicals industry among others (Sharma, 2022).

14 The Private Sector Participation Governing Rules. https://clck.ru/3AgKRH

15 Mohammed bin Rashid Al Maktoum, Ruler of Dubai (2017). Law No. (22) of 2015 Regulating Partnership between the Public Sector and the Private Sector in the Emirate of Dubai. Dubai: The Supreme Legislation Committee in the Emirate of Dubai. https://clck.ru/3AgKKF

3. Restraint of competition

3.1. Powers, approvals and due diligence

PPP in Europe16 stipulates incompatibility of aid grants or resources which distort or threaten competition by favoring certain undertakings or the production with the internal market of Europe (Rossi & Civitillo, 2014). The Government of Queensland17 requires that a PPP must present strategic advantages, particularly for highly regulated sectors. As an example, the PPP with Singapore firms explicitly state for arbitration in Singapore. Under Korean Law18, specific sectors are identified for PPP, to include industry, agriculture, construction, transport, telecoms, science and technology, tourism and financial services. Investment that encumber the development of the national economy and threaten national security, or technically obsolete and harmful to the environment, shall be prohibited or restricted (Hurk et al., 2016; Soomro & Yuhui, 2023; Liu et al., 2014).

3.2. Ownership structure, governance and level of autonomy

The African Law on PPP prohibits agreement or practice between competitors that results in direct price fixing and allocation of markets; collusive tendering and setting of minimum and resale prices. Under Malaysia law, the landscape of involvement in PPP varies from concessionaire, privatization to partnerships (Biygautane et al., 2020). The collaboration of local practitioners, mostly among Asian nations concerns typical infrastructure developments. Under Australian Law the Competition and Consumer Act 2010 prohibits and criminalizes the cartel conduct in PPP. Under German Law, infringement of the cartel prohibition is criminalized (Outhuijse, 2020).

A PPP that comprises ownership concentration of the independent market players might risk infringement of the cartel prohibition. Otherwise, when both parent companies stay active in the given market, there is a risk that the PPP will be considered to be of a co-operative nature; and the players at risk of infringement of the cartel prohibition. Under German law, PPP can be organized depending on the depth of co-operation the partners elect companies other than partnerships such as the PPP corporation OR Aktiengesellschaft; or the limited liability company, Gesellschaft mit beschränkter Haftung; Silent partnerships or stille Gesellschaft and sub-participations or Unterbeteiligung are also used in German law to organize PPP (Darko et al., 2023).

16 Hatton, C., Cardwell, D., & Botts, B. (2020, July 8). European Union: Joint Ventures. Global Competition Review. https://clck.ru/3AgKYR

17 Queensland Treasury and Trade. (2013). Government Owned Corporations Guidelines for Joint Venture Agreements. Queensland Treasury. https://goo.su/v45h3t

18 Standing Committee of the Supreme People's Assembly. (1992). The law of the Democratic People's Republic of Korea on foreign investment. Seoul: Fourth Session of the Ninth Supreme People's.

3.3. Liabilities, dispute resolution

Under Australian Law, one should not avoid the lengthy proceedings of dispute resolution or seek to oust the jurisdiction of the Courts to give urgent interlocutory or final relief19. British Venture Law provides for consultation, conciliation, arbitration, and judicial procedure - in that order of preference, for the resolution of disputes arising during the life of the venture (Khallaf et al., 2021). Indonesian law prohibits practices that aim to unfairly restrict competition under the "Prohibition of monopolistic practices and unfair business competition or anti- monopoly law." As an example, a market dominant entity from abusing its position by unfairly restricts its competitors' activities. A non-competition clause may not hold up before the Indonesian Competition Supervisory Body entered into by an industry-dominant business player.

Under Japanese Law20, restricted industries are industries considered to be affected with great public interest, such as water works, railroads, banking, and maritime transportation (Bradshaw, 1963).

3.4. Exit strategies

Under UAE Law, arbitration is conducted by the Dubai International Arbitration Centre or DIAC or in the DIFC-LCIA or the London Court of International Arbitration and under the DIFC-LCIA rules recommended for adoption that specific place for arbitration is decided at the outset21. Under Korean Law, the PPP is subjected to basic governing antitrust and fair competition issues in Korea stipulated in the Monopoly Regulation and Fair-Trade Act22. Alternately, PPP via merger and acquisition is caught through the Korean Merger Control Legislation, if a business combination total worldwide assets or turnover is equal or greater KRW300b or UR 257.1 million. Under Australian Laws, the disposal and assignment of PPP interest by a PPP within Government: A Disposal or Assignment should not require the consent of the PPP. Under Indian Law the executing Government entity would have to assess possible recourse to recover investment in case the PPP is unsuccessful.

19 Seungwoo Son. (2012). Legal analysis on Public-Private Partnerships regarding Model PPP Rules. https://clck.ru/3AgKta

20 Matsuura, M., Niunoya, M., & Hamasu, Sh. (2023). A structured guide to public private partnerships in Japan. Atsumi & Saka. https://clck.ru/3AgKue

21 HM Treasury. (2010, March). Joint Ventures: a guidance note for public sector bodies forming joint ventures with the private sector. London: Government of UK. https://clck.ru/3AgKva

22 Tae Hee Lee. (2020). International Joint Ventures in Korea. Seoul: Lee & Ko. https://clck.ru/3AgKwa

4. Conflict of interest / procurement issues

4.1. Powers, approvals and due diligence

Under Australian Law, PPP permits unqualified right to disclose confidential information and reversely the right to disclose qualified information. In Cyprus arbitration is not practiced, and the District Courts of Cyprus are the competent authority to act (Caperchione et al., 2017). Under Korean Law, impairments to fair competition include discrimination and abuse of superior bargaining position; false, deceptive, or misleading advertising. Under the Law of Malaysia, measures have been implemented to expedite an overall project approval process for PPP, whereby the approval timeline has been reduced to 8-10 months. These regulations are applicable to investment projects deemed highly important as determined by the EEC Policy Committee, which require submission for consideration prior to approval. Under Chinese law, the four main steps to establish PPP are: Obtaining the assistance of the China International Trust and Investment Corporation; negotiating the legal framework of the joint venture; obtaining the authorization of the Foreign Investment Commission of PROC; and registering with the General Administration for Industry and Commerce (Liyanapathirana et al., 2023).

4.2. Ownership structure, governance and level of autonomy

Public Private Partnership of Democratic People's Republic of Korea permits equity and contractual joint ventures to set up and operate wholly foreign-owned enterprises in the Free Economic and Trade Zone. Under Australian Laws23 the PPP must permit the unqualified right to disclose confidential information by the Government Owned Corporation PPP; and reversely disclose qualified information (Azarian et al., 2023). In Slovakia24, Liability is regulated by the commercial code, but among the partners there is a lot of contractual freedom since there is no explicit law on PPP. Under Indian Law25 a PPP is set up as an autonomous statutory organization and similar guidelines for the organized Group. European Legislation the covenants not to compete are determined upon formation of the joint venture the parties agree not to compete outside of the joint venture26.

4.3. Liabilities, dispute resolution

In Queensland territory a parent PPP should not provide guarantees or assume any liabilities of the PPP unless specifically approved by shareholding Ministers and consistent Investment

23 Griffiths, A., & Carney, N. (2023). An introduction to public-private partnerships in Australia. Lexology. https://clck.ru/3AgLab

24 Ministry of Finance of the Slovak Republic. Public Private Partnership (PPP). https://clck.ru/3AgLbZ

25 Government of India. Public Private Partnership In India. https://goo.su/qlmvkUI

26 Giguère, S. (2001). Local governance and partnerships. A summary of the findings of the OECD study on local partnerships. Paris: Organisation for Economic Co-operation and Development. https://goo.su/G5ctv

Guidelines (Ojelabi & Noone, 2020). Under Korean Law any disagreement concerning foreign investment shall be settled through consultation. Disputes shall be examined and settled by a court of law or arbitration body otherwise disagreement may be taken to an arbitration agency in the third countries for settlement27. Under New Zealand law, for all kinds of PPP structure; actions subjected laws where a dispute arises and free to agree different dispute resolution place or process; when there is failure of competition when there is only a single interested party remaining (Chou & Lin, 2012).

Under German Law, the material merger control provisions: If the PPP partners can prove that despite the creation or strengthening of a market dominating provisions, the PPP improves the competitive conditions in the same or another market that outweighs the negative impact of market dominance, the FCO may still grant merger clearance a substantive test market dominance is performed and the PPP must be prohibited if it creates a market dominating position. In American law, the PPP dictates liability, the structure of exposure is determined to include defense, indemnification and hold harmless clause.

4.4. Exit strategies

Under British Law, PPP operations may be terminated by mutual agreement of the venture parties, by a breach by one of the parties or by force majeure (Marques, 2021). Under Korean Law28, the parties are free to resort to any court of competent jurisdiction within or outside Korea to settle the disputes arising under PPP possible legal remedies include monetary compensation for harm or loss, related provisional attachments, and equitable remedies of specific performance, and temporary and permanent injunction (Lemley & McCreary, 2020).

Under New Zealand laws, shareholders in the PPP do not owe fiduciary obligations to one another. Under Indian Law, the typical exit strategies for international projects: sale, trade, and merger, aggregate or liquidate; claim against insurance or guarantee; haul away or walk away; litigate or arbitrate.

Conclusions

Each legal feature of the partnership contract is weighed across four different legal arguments, signifying a well-crafted agreement. The guidelines below provide direction and clarity, and enables crucial thinking. Therefore, it is sufficient to state that the work is excellent.

27 Mirza & Associates. (2023, May 23). The pros and cons of arbitration vs. litigation: What's the best option for your Business? Mondaq. https://clck.ru/3AgLhv

28 Standing Committee of the Supreme People's Assembly. (1992). The law of the Democratic People's Republic of Korea on foreign investment. Seoul: Fourth Session of the Ninth Supreme People's. https://clck.ru/3AgLjY

PPP Guidelines

Powers, Approvals & Due Diligence Ownership Structure (Governance & Level of Autonomy) Liabilities, Dispute Resolution Exit Strategies

Value Captured (Scope, benefits & risks) A joint venture is established when significant synergy is forecast to substantiate increase in export earnings, or cheaper consumer services and goods PPP is compatible with the local market to promote economic development, especially where the standard of living is abnormally low or underemployment The PPP in the form of a Special Purpose Vehicle can afford the limited liability protection to shareholders; except for environmental and anti-trust laws Any Agency or GOC should not provide guarantees or assume any liabilities of the PPP unless specifically approved by the Secretary, and consistent with the Investment Guidelines

Matrix Of Mechanisms Route to Market The PPP provides for a Deed of Covenant to be executed between existing participants, with reasonable and defined timeframes PPP Guidelines should restrict industries affected with great public interest: Transport, energy or education. The role of Government is to protect National Infrastructure Assets Government Secretaries, Directors on the Board of the PPP would be liable and accountable for certain actions and decisions of the PPP for any lapses or failures Arbitration ought to be put down at the outset such as the London Court of International Arbitration and under whose rules

Restraints of Competition The PPP should explicitly prohibit and criminalize the cartel conduct. The role of government is to protect the impact on the economy and NOT the PPP profitability Government can enter into PPP agreements with private entities for infrastructure projects, provided a step in or takeover can be performed by the sovereignty—no other A PPP is subjected to basic governing antitrust and fair competition issues: Monopoly and Fair Trade PPP Agreements must not allow the private sector to take over the undertaking of the projects in its entirety after project completion

Conflict of Interest (Procurement Issues) A PPP is not supposed to cause impairments to fair competition: Discrimination, abuse of superior bargaining position; including false, deceptive, or misleading advertising The Covenants Not to Compete are determined upon formation of the PPP where the parties agree not to compete outside of the joint venture PPP s or Aid Grants granted or funding resources which distorts or threatens competition by favoring certain undertakings shall be deemed incompatible

References

Azarian, M., Shiferaw, A. T., L^dre, O., Wondimu, P. A., & Stevik, T. K. (2023). Project ownership in public-private partnership (PPP) projects of Norway. Procedia Computer Science, 219, 1838-1846. https://doi. org/10.1016/j.procs.2023.01.481

Biygautane, Mh., Neesham, C., & Al-Yahya, Kh. O. (2020). Institutional entrepreneurship and infrastructure public-private partnership (PPP): Unpacking the role of social actors in implementing PPP projects. International Journal of Project Management, 37(1), 192-219. https://doi.org/10.1016/jJjproman.2018.12.005

Bradshaw, C. (1963). Joint Ventures in Japan. Washington Law Review, 38(1), 58-104.

Buso, M., Dosi, C., & Moretto, M. (2021). Do exit options increase the value for money of public-private partnerships? Journal of Economics & Management Strategy, 30(4), 721-742. https://doi.org/10.1111/ jems.12440

Caperchione, E., Demirag, I., & Grossi, G. (2017). Public sector reforms and public private partnerships: Overview and research agenda. Accounting Forum, 41 (1), 1-7. https://doi.org/10.1016Zj.accfor.2017.01.003

Chen, Ch., & Hubbard, M. (2012). Power relations and risk allocation in the governance of public private partnerships: A case study from China. Policy and Society, 31(1), 39-49. https://doi.org/10.1016/j. polsoc.2012.01.003

Chou, J.-Sh., & Lin, Ch. (2012). Predicting disputes in Public-Private Partnership projects: Classification and ensemble models. Journal of Computing in Civil Engineering, 27(1). https://doi.org/10.1061/(ASCE)CP.1943-5487.0000197

Darko, D., Zhu, D., Quayson, M., Hossin, M. A., Omoruyi, O., & Bediako, A. K. (2023). A multicriteria decision framework for governance of PPP projects towards sustainable development. Socio-Economic Planning Sciences, 87(B), 101580. https://doi.org/10.1016Zj.seps.2023.101580 Demirag, I., Khadaroo, I., Stapleton, P., & Stevenson, C. (2011). Risks and the financing of PPP: Perspectives from the financiers. The British Accounting Review, 43(4), 294-310. https://doi.org/10.1016/j.bar.2011.08.006 DoD NASA. (2020). Proposed Rules. Federal Register, 85(109), 34561-34569.

Garg, S., & Garg, S. (2016). Rethinking Public-Private Partnerships: An unbundling approach. Transportation

Research Procedia (Vol. 25, pp. 3789-3807). https://doi.org/10.1016/j.trpro.2017.05.241 González-Ruiz, Ju. D., Botero-Botero, S., & Duque-Grisales, E. (2018). Financial eco-innovation as a mechanism for fostering the development of sustainable infrastructure systems. Sustainability, 10(12), 4463. https://doi.org/10.3390/su10124463 Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public-private

partnerships. The Economic Journal, 113(486), C69-C76. https://doi.org/10.1111/1468-0297.00119 Hennessey, K. (2021). Comment on «When and how to use Public-Private Partnerships in infrastructure: Lessons from the international experience». In E. Glaeser, & J. Poterba (Eds.), Economic Analysis and Infrastructure Investment (pp. 365-368). Cambridge: National Bureau of Economic Research. Hurk, M. van den, Brogaard, L., Lember, V., Petersen, O. H., & Witz, P. (2016). National varieties of Public-Private Partnerships (PPPs): A comparative analysis of PPP-supporting units in 19 European Countries. Journal of Comparative Policy Analysis: Research and Practice, 18(1), 1-20. https://doi.org/10.1080/13876988.2 015.1006814

Ito, S. (2020). Infrastructure Development and Public-Private Partnership. Singapore: Springer Nature Singapore Pte Ltd.

Jayachandran, S. (2021). How economic development influences the environment. Cambridge: National Bureau

of Economic Research. https://doi.org/10.3386/w29191 Jin, Zh., & Huang, Ch. (2021). Tax enforcement and corporate donations: evidence from Chinese 'Golden Tax Phase III'. China Journal of Accounting Studies, 9(4), 526-548. https://doi.org/10.1080/21697213.2022. 2053375.

Jokar, E., Aminnejad, B., & Lork, A. (2021). Assessing and prioritizing risks in Public-Private Partnership (PPP) projects using the integration of fuzzy multi-criteria decision-making methods. Operations Research Perspectives, 8, 100190. https://doi.org/10.1016/j.orp.2021.100190 Khallaf, R., Naderpajouh, N., & Hastak, M. (2021). Robust decision-making for multiparty renegotiations in Public-Private Partnerships. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(3). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000473 Kurniawan, F., Mudjanarko, S. W., & Ogunlana, S. O. (2015). Best practice for financial models of PPP projects.

In Procedia Engineering (Vol. 125, pp. 124-132). https://doi.org/10.1016/j.proeng.2015.11.019 Lee, E. Y.-J. (2003). The Special Economic Zones and North Korean economic Reformation with a viewpoint

of international law. Fordham International Law Journal, 27(4), 1343-1378. Leigland, J. (2018). Public-Private partnerships in developing countries: The emerging evidence-based critique.

The World Bank Research Observer, 33(1), 103-134. https://doi.org/10.1093/wbro/lkx008 Lemley, M., & McCreary, A. (2019, December 19). Exit strategy. Stanford Law and Economics Olin Working Paper, 542.

Liu, J., Gao, R., Cheah, Ch., & Luo, J. (2016). Incentive mechanism for inhibiting investors' opportunistic behavior in PPP projects. International Journal of Project Management, 34(7), 1102-1111. https://doi.org/10.1016/j. ijproman.2016.05.013

Liu, J., Yu, X., & Cheah, Ch. Yu. J. (2014). Evaluation of restrictive competition in PPP projects using real option approach. International Journal of Project Management, 32(3), 473-481. https://doi.org/10.1016/j. ijproman.2013.07.007

Liu, T., Wang, Y., & Wilkinson, S. (2016). Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public-Private Partnerships (PPPs): A comparative analysis of Australia and China. International Journal of Project Management, 34(4), 701 -716. https://doi.org/10.1016/j.ijproman.2016.01.004

Liyanapathirana, D., Adeniyi, O., & Rathnasiri, P. (2023). Tactical conflict prevention strategies in Public-Private Partnerships: Lessons from experts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 76(1). https://doi.org/10.1061/jladah.ladr-996 Ma, L., Hu, Ya., Zhu, L., & Ke, Y. (2023). Are public-private partnerships still an answer for social infrastructure? A systematic literature review. Frontiers of Engineering Management, 70(3), 467-482. https://doi.org/10.1007/ s42524-023-0249-1

Marques, R. C. (2021). Public interest and early termination of PPP contracts. Can fair and reasonable

compensations be determined? Utilities Policy, 73, 101301. https://doi.org/10.1016Zj.jup.2021.101301 Mirzaee, A. M., & Sardroud, J. M. (2022). Public-private-partnerships /PPP enabled smart city funding and financing. In J. R. Vacca (Ed.), Smart Cities Policies and Financing. Approaches and Solutions (Chapter 9, pp. 117-131). https://doi.org/10.1016/B978-0-12-819130-9.00011-5 Moffatt, S., & Kohler, N. (2008). Conceptualizing the built environment as a social-ecological system. Building Research & Information: Developing theories of the built environment, 36(3), 248-268. https://doi.org/10.1080/09613210801928131 Noring, L. (2019). Public asset corporation: A new vehicle for urban regeneration and infrastructure finance.

Cities, 88, 125-135. https://doi.org/10.1016/j.cities.2019.01.002 Ojelabi, L. A., & Noone, M. A. (2020). Jurisdictional perspectives on alternative dispute resolution and access to justice: introduction. International Journal of Law in Context, 76(2), 103-107. https://doi.org/10.1017/ S1744552320000087

Outhuijse, A. (2020). The effective public enforcement of the prohibition of anti-competitive agreements: Which factors influence the high percentage of annulments of Dutch cartel fines? Journal of Antitrust Enforcement, 8(1), 124-164. https://doi.org/10.1093/jaenfo/jnz020 Owen, B., Sun, S., & Zheng, W. (2007). China's competition policy reforms: The anti-monopoly law and beyond.

Stanford Law and Economics Olin Working Paper, 339. https://doi.org/10.2139/ssrn.978810 Rossi, M., & Civitillo, R. (2014). Public Private Partnerships: A general overview in Italy. Procedia-Social and

Behavioral Sciences, 709, 140-149. https://doi.org/10.1016/j.sbspro.2013.12.434 Rufin, C., & Rivera-Santos, M. (2012). Between commonweal and competition: Understanding the governance of public-private partnerships. Journal of Management, 38(5), 1634-1654. https://doi. org/10.1177/0149206310373948 Rybnicek, R., Plakolm, Ju., & Baumgartner, L. (2020). Risks in Public-Private Partnerships: A systematic literature review of risk factors, their impact and risk mitigation. Public Performance & Management Review, 43(5), 1174-1208. https://doi.org/10.1080/15309576.2020.1741406 Salem, D. (1981). The Joint Venture Law of the Peoples' Republic of China: Business and Legal Perspective.

Maryland Journal of International Law, 7(1), 73-118 Selim, A., & ElGohary, A. S. (2020). Public-private partnerships (PPPs) in smart infrastructure projects: the role

of stakeholders. HBRC Journal, 76(1), 317-333. https://doi.org/10.1080/16874048.2020.1825038 Sharma, Ch. (2022). Who does it better and why? Empirical analysis of public-private partnership in infrastructure

in Asia-Pacific. Property Management, 47(3), 309-335. https://doi.org/10.1108/PM-07-2022-0050 Soomro, N.-E-H., & Yuhui, W. (2023). Appraisal of existing evidences of competition law and policy: Bilateral

legislative developments of Sino-Pak. Heliyon, 9(8). https://doi.org/10.1016/j.heliyon.2023.e18935 Wang, H., Liu, Yu., Xiong, W., & Zhu, D. (2019). Government support programs and private investments in PPP Markets. International Public Management Journal, 22(3), 499-523. https://doi.org/10.1080/10967494. 2018.1538025

Wang, Y. (2003). A broken fantasy of Public-Private Partnerships. Public Administration Review, 69(4), 779-782.

https://doi.org/10.1111/j.1540-6210.2009.02025.x Wegrich, K., Kostka, G., & Hammerschmid, G. (Eds.) (2017). The governance of infrastructure: Hertie Governance Report. Oxford: Oxford University Press. https://doi.org/10.1093/acprof:oso/9780198787310.001.0001 Whiteside, H. (2020). Public-private partnerships: market development through management reform. Review

of International Political Economy, 27(4), 880-902. https://doi.org/10.1080/09692290.2019.1635514 Yurdakul, H., Kama§ak, R., & Ozturk, T. Ya. (2022). Macroeconomic drivers of Public Private Partnership (PPP) projects in low income and developing countries: A panel data analysis. Borsa Istanbul Review, 22(1), 37-46. https://doi.org/10.1016/j.bir.2021.01.002

Author information

Dominique T. Molintas - Researcher, PATTS College of Aeronautics; Graduate

Student, Griffith Graduate Research School, Griffith University

Address: Nathan, QLD 4111, Queensland, Australia; Lombos Avenue, San Isidro 1700,

Paranaque, Philippines

E-mail: dmolintas@asia.com

ORCID ID: https://orcid.org/0000-0002-4063-3983

WoS Researcher ID: https://www.webofscience.com/wos/author/record/KHE-0949-2024 Google Scholar ID: https://scholar.google.com/citations?user=G8imOMYAAAAJ

Conflict of interest

The author declares no conflict of interest.

Financial disclosure

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

The research had no sponsorship.

Thematic rubrics

OECD: 5.05 / Law РASJC: 3308 / Law WoS: OM / Law

Article history

Date of receipt - January 16, 2024 Date of approval - February 12, 2024 Date of acceptance - June 25, 2024 Date of online placement - June 30, 2024

Научная статья

УДК 34:004:347.4:004.4

EDN: https://elibrary.ru/lvpigr

DOI: https://doi.org/10.21202/jdtl.2024.22

з

Check for updates

Соглашение о государственно-частном партнерстве в контексте матрицы оценки их юридических параметров и цифровизации

Доминик Т. Молинтас О

Колледж аэронавтики PATTS, Параньяк, Филиппины; Университет Гриффита, Квинсленд, Австралия

Ключевые слова

государственно-частное

партнерство,

контракт,

конфликт интересов, ограничение конкуренции, право, соглашение, управление рисками, цифровые технологии, цифровизация, юридическая оценка

Аннотация

Цель: путем рассмотрения юридических аспектов соглашений о государственно-частном партнерстве синтезировать их основные положения в общую матрицу, которую при переводе в цифровой формат можно использовать в интересах стандартизации и упрощения формулирования параметров соглашения.

Методы: автор опирался на сравнительно-правовой анализ научной литературы, законодательства и интернет-источников по государственно-частному партнерству, дополненный рассмотрением соглашений о государственно-частном партнерстве различной социально-политической направленности, что позволило создать научно-обоснованную и практико-ориентированную матрицу, которая может послужить инструментом при составлении соглашений о государственно-частном партнерстве.

Результаты: выделены национальные аспекты в правовом регулировании обозначенных отношений в различных странах и описан ряд особенностей, встречающихся в соглашениях о государственно-частном партнерстве.

Научная новизна: с учетом важнейших правовых особенностей, характерных для разных стран, представлена матрица для составления соглашений о государственно-частном партнерстве, включающая восемь основных параметров: 1 - полученную стоимость, масштаб, выгоды и риски, 2 - выход на рынок, 3 - ограничение конкуренции, 4 - конфликт интересов/закупки, 5 - полномочия, одобрение, юридическая оценка, 6 - обязательства, разрешение споров, 7 - структуру собственности, управление и уровень автономии, 8 - стратегии выхода. В зависимости от обозначенных приоритетов ее можно модифицировать, учитывая, что приоритеты определяют и формируют конкретные параметры каждого отдельного партнерства.

© Молинтас, Д. Т., 2024

Статья находится в открытом доступе и распространяется в соответствии с лицензией Creative Commons «Attribution» («Атрибуция») 4.0 Всемирная (CC BY 4.0) (https://creativecommons.Org/licenses/by/4.0/deed.ru), позволяющей неограниченно использовать, распространять и воспроизводить материал при условии, что оригинальная работа упомянута с соблюдением правил цитирования.

Практическая значимость: полученная в результате исследования матричная схема может стать инструментом планирования, используемым для анализа и понимания взаимосвязей между восемью юридическими параметрами, необходимыми для формирования отношений в сфере государственно-частного партнерства. Она послужит юридическим ориентиром для формулирования соглашений о государственно-частном партнерстве, используемых во всем мире, и будет способствовать не только активизации государственно-частного партнерства, но и правильному пониманию обязательств, объемов ответственности и ограничений. Приведенные в исследовании рекомендации задают направление для оценки государственно-частного партнерства, позволяя сделать четкие выводы о партнерстве. При условии цифровой доступности предложенная матрица будет представлять определенный интерес для многих организаций, использующих государственно-частное партнерство в своей профессиональной деятельности.

Для цитирования

Молинтас, Д. Т. (2024). Соглашение о государственно-частном партнерстве в контексте матрицы оценки их юридических параметров и цифровизации. Journal of Digital Technologies and Law, 2(2), 430-449. https://doi.org/10.21202/ jdtl.2024.22

Список литературы

Azarian, M., Shiferaw, A. T., L^dre, O., Wondimu, P. A., & Stevik, T. K. (2023). Project ownership in public-private partnership (PPP) projects of Norway. Procedia Computer Science, 219, 1838-1846. https://doi. org/10.1016/j.procs.2023.01.481

Biygautane, Mh., Neesham, C., & Al-Yahya, Kh. O. (2020). Institutional entrepreneurship and infrastructure public-private partnership (PPP): Unpacking the role of social actors in implementing PPP projects. International Journal of Project Management, 37(1), 192-219. https://doi.org/10.1016/j.ijproman.2018.12.005

Bradshaw, C. (1963). Joint Ventures in Japan. Washington Law Review, 38(1), 58-104.

Buso, M., Dosi, C., & Moretto, M. (2021). Do exit options increase the value for money of public-private partnerships? Journal of Economics & Management Strategy, 30(4), 721-742. https://doi.org/10.1111/ jems.12440

Caperchione, E., Demirag, I., & Grossi, G. (2017). Public sector reforms and public private partnerships: Overview and research agenda. Accounting Forum, 41 (1), 1-7. https://doi.org/10.1016Zj.accfor.2017.01.003

Chen, Ch., & Hubbard, M. (2012). Power relations and risk allocation in the governance of public private partnerships: A case study from China. Policy and Society, 31(1), 39-49. https://doi.org/10.1016/j. polsoc.2012.01.003

Chou, J.-Sh., & Lin, Ch. (2012). Predicting disputes in Public-Private Partnership projects: Classification and ensemble models. Journal of Computing in Civil Engineering, 27(1). https://doi.org/10.1061/(ASCE)CP.1943-5487.0000197

Darko, D., Zhu, D., Quayson, M., Hossin, M. A., Omoruyi, O., & Bediako, A. K. (2023). A multicriteria decision framework for governance of PPP projects towards sustainable development. Socio-Economic Planning Sciences, 87(B), 101580. https://doi.org/10.1016/j.seps.2023.101580

Demirag, I., Khadaroo, I., Stapleton, P., & Stevenson, C. (2011). Risks and the financing of PPP: Perspectives from the financiers. The British Accounting Review, 43(4), 294-310. https://doi.org/10.1016/j.bar.2011.08.006

DoD NASA. (2020). Proposed Rules. Federal Register, 85(109), 34561-34569.

Garg, S., & Garg, S. (2016). Rethinking Public-Private Partnerships: An unbundling approach. Transportation Research Procedia (Vol. 25, pp. 3789-3807). https://doi.org/10.1016/j.trpro.2017.05.241

Gonzalez-Ruiz, Ju. D., Botero-Botero, S., & Duque-Grisales, E. (2018). Financial eco-innovation as a mechanism for fostering the development of sustainable infrastructure systems. Sustainability, 70(12), 4463. https://doi.org/10.3390/su10124463 Hart, O. (2003). Incomplete contracts and public ownership: Remarks, and an application to public-private

partnerships. The Economic Journal, 7 73(486), C69-C76. https://doi.org/10.1111/1468-0297.00119 Hennessey, K. (2021). Comment on «When and how to use Public-Private Partnerships in infrastructure: Lessons from the international experience». In E. Glaeser, & J. Poterba (Eds.), Economic Analysis and Infrastructure Investment (pp. 365-368). Cambridge: National Bureau of Economic Research. Hurk, M. van den, Brogaard, L., Lember, V., Petersen, O. H., & Witz, P. (2016). National varieties of Public-Private Partnerships (PPPs): A comparative analysis of PPP-supporting units in 19 European Countries. Journal of Comparative Policy Analysis: Research and Practice, 78(1), 1-20. https://doi.org/10.1080/13876988.2 015.1006814

Ito, S. (2020). Infrastructure Development and Public-Private Partnership. Singapore: Springer Nature Singapore Pte Ltd.

Jayachandran, S. (2021). How economic development influences the environment. Cambridge: National Bureau

of Economic Research. https://doi.org/10.3386/w29191 Jin, Zh., & Huang, Ch. (2021). Tax enforcement and corporate donations: evidence from Chinese 'Golden Tax Phase III'. China Journal of Accounting Studies, 9(4), 526-548. https://doi.org/10.1080/21697213.2022. 2053375.

Jokar, E., Aminnejad, B., & Lork, A. (2021). Assessing and prioritizing risks in Public-Private Partnership (PPP) projects using the integration of fuzzy multi-criteria decision-making methods. Operations Research Perspectives, 8, 100190. https://doi.org/10.1016/j.orp.2021.100190 Khallaf, R., Naderpajouh, N., & Hastak, M. (2021). Robust decision-making for multiparty renegotiations in Public-Private Partnerships. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 73(3). https://doi.org/10.1061/(ASCE)LA.1943-4170.0000473 Kurniawan, F., Mudjanarko, S. W., & Ogunlana, S. O. (2015). Best practice for financial models of PPP projects.

In Procedia Engineering (Vol. 125, pp. 124-132). https://doi.org/10.1016/j.proeng.2015.11.019 Lee, E. Y.-J. (2003). The Special Economic Zones and North Korean economic Reformation with a viewpoint

of international law. Fordham International Law Journal, 27(4), 1343-1378. Leigland, J. (2018). Public-Private partnerships in developing countries: The emerging evidence-based critique.

The World Bank Research Observer, 33(1), 103-134. https://doi.org/10.1093/wbro/lkx008 Lemley, M., & McCreary, A. (2019, December 19). Exit strategy. Stanford Law and Economics Olin Working Paper, 542.

Liu, J., Gao, R., Cheah, Ch., & Luo, J. (2016). Incentive mechanism for inhibiting investors' opportunistic behavior in PPP projects. International Journal of Project Management, 34(7), 1102-1111. https://doi.org/10.1016/j. ijproman.2016.05.013

Liu, J., Yu, X., & Cheah, Ch. Yu. J. (2014). Evaluation of restrictive competition in PPP projects using real option approach. International Journal of Project Management, 32(3), 473-481. https://doi.org/10.1016/j. ijproman.2013.07.007

Liu, T., Wang, Y., & Wilkinson, S. (2016). Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public-Private Partnerships (PPPs): A comparative analysis of Australia and China. International Journal of Project Management, 34(4), 701 -716. https://doi.org/10.1016/j.ijproman.2016.01.004 Liyanapathirana, D., Adeniyi, O., & Rathnasiri, P. (2023). Tactical conflict prevention strategies in Public-Private Partnerships: Lessons from experts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 76(1). https://doi.org/10.1061/jladah.ladr-996 Ma, L., Hu, Ya., Zhu, L., & Ke, Y. (2023). Are public-private partnerships still an answer for social infrastructure? A systematic literature review. Frontiers of Engineering Management, 70(3), 467-482. https://doi.org/10.1007/ s42524-023-0249-1

Marques, R. C. (2021). Public interest and early termination of PPP contracts. Can fair and reasonable

compensations be determined? Utilities Policy, 73, 101301. https://doi.org/10.1016/j.jup.2021.101301 Mirzaee, A. M., & Sardroud, J. M. (2022). Public-private-partnerships /PPP enabled smart city funding and financing. In J. R. Vacca (Ed.), Smart Cities Policies and Financing. Approaches and Solutions (Chapter 9, pp. 117-131). https://doi.org/10.1016/B978-0-12-819130-9.00011-5 Moffatt, S., & Kohler, N. (2008). Conceptualizing the built environment as a social-ecological system. Building Research & Information: Developing theories of the built environment, 36(3), 248-268. https://doi.org/10.1080/09613210801928131

Noring, L. (2019). Public asset corporation: A new vehicle for urban regeneration and infrastructure finance.

Cities, 88, 125-135. https://doi.org/10.1016/j.cities.2019.01.002 Ojelabi, L. A., & Noone, M. A. (2020). Jurisdictional perspectives on alternative dispute resolution and access to justice: introduction. International Journal of Law in Context, 16(2), 103-107. https://doi.org/10.1017/ S1744552320000087

Outhuijse, A. (2020). The effective public enforcement of the prohibition of anti-competitive agreements: Which factors influence the high percentage of annulments of Dutch cartel fines? Journal of Antitrust Enforcement, 8(1), 124-164. https://doi.org/10.1093/jaenfo/jnz020 Owen, B., Sun, S., & Zheng, W. (2007). China's competition policy reforms: The anti-monopoly law and beyond.

Stanford Law and Economics Olin Working Paper, 339. https://doi.org/10.2139/ssrn.978810 Rossi, M., & Civitillo, R. (2014). Public Private Partnerships: A general overview in Italy. Procedia-Social and

Behavioral Sciences, 109, 140-149. https://doi.org/10.1016/j.sbspro.2013.12.434 Rufín, C., & Rivera-Santos, M. (2012). Between commonweal and competition: Understanding the governance of public-private partnerships. Journal of Management, 38(5), 1634-1654. https://doi. org/10.1177/0149206310373948 Rybnicek, R., Plakolm, Ju., & Baumgartner, L. (2020). Risks in Public-Private Partnerships: A systematic literature review of risk factors, their impact and risk mitigation. Public Performance & Management Review, 43(5), 1174-1208. https://doi.org/10.1080/15309576.2020.1741406 Salem, D. (1981). The Joint Venture Law of the Peoples' Republic of China: Business and Legal Perspective.

Maryland Journal of International Law, 7(1), 73-118 Selim, A., & ElGohary, A. S. (2020). Public-private partnerships (PPPs) in smart infrastructure projects: the role

of stakeholders. HBRC Journal, 16(1), 317-333. https://doi.org/10.1080/16874048.2020.1825038 Sharma, Ch. (2022). Who does it better and why? Empirical analysis of public-private partnership in infrastructure

in Asia-Pacific. Property Management, 41(3), 309-335. https://doi.org/10.1108/PM-07-2022-0050 Soomro, N.-E-H., & Yuhui, W. (2023). Appraisal of existing evidences of competition law and policy: Bilateral

legislative developments of Sino-Pak. Heliyon, 9(8). https://doi.org/10.1016/j.heliyon.2023.e18935 Wang, H., Liu, Yu., Xiong, W., & Zhu, D. (2019). Government support programs and private investments in PPP Markets. International Public Management Journal, 22(3), 499-523. https://doi.org/10.1080/10967494. 2018.1538025

Wang, Y. (2003). A broken fantasy of Public-Private Partnerships. Public Administration Review, 69(4), 779-782.

https://doi.org/10.1111/j.1540-6210.2009.02025.x Wegrich, K., Kostka, G., & Hammerschmid, G. (Eds.) (2017). The governance of infrastructure: Hertie Governance Report. Oxford: Oxford University Press. https://doi.org/10.1093/acprof:oso/9780198787310.001.0001 Whiteside, H. (2020). Public-private partnerships: market development through management reform. Review of

International Political Economy, 27(4), 880-902. https://doi.org/10.1080/09692290.2019.1635514 Yurdakul, H., Kama§ak, R., & Oztürk, T. Ya. (2022). Macroeconomic drivers of Public Private Partnership (PPP) projects in low income and developing countries: A panel data analysis. Borsa Istanbul Review, 22(1), 37-46. https://doi.org/10.1016/j.bir.2021.01.002

Сведения об авторе

Молинтас Доминик Т. - научный сотрудник, Колледж аэронавтики PATTS; магистр, Университет Гриффита

Адрес: Филиппины, Параньяк, авеню Ломбос, Сан Исидро 1700; Австралия,

Квинсленд, Натан, QLD 4111

E-mail: dmolintas@asia.com

ORCID ID: https://orcid.org/0000-0002-4063-3983

WoS Researcher ID: https://www.webofscience.com/wos/author/record/KHE-0949-2024 Google Scholar ID: https://scholar.google.com/citations?user=G8imOMYAAAAJ

Конфликт интересов

Автор сообщает об отсутствии конфликта интересов.

Финансирование

Исследование не имело спонсорской поддержки.

Тематические рубрики

Рубрика OECD: 5.05 / Law Рубрика ASJC: 3308 / Law Рубрика WoS: OM / Law Рубрика ГРНТИ: 10.27.41 / Сделки

Специальность ВАК: 5.1.3 / Частно-правовые (цивилистические) науки

История статьи

Дата поступления - 16 января 2024 г.

Дата одобрения после рецензирования - 12 февраля 2024 г.

Дата принятия к опубликованию - 25 июня 2024 г.

Дата онлайн-размещения - 30 июня 2024 г.

i Надоели баннеры? Вы всегда можете отключить рекламу.