Method for developing a corporate BIM classification system Текст научной статьи по специальности «Компьютерные и информационные науки»

CC BY
170
39
i Надоели баннеры? Вы всегда можете отключить рекламу.
Журнал
Magazine of Civil Engineering
Scopus
ВАК
RSCI
ESCI
Ключевые слова
BIM / building information modeling / BIM technologies / classification in construction / construction information classification system / classifier / classifier development method / building lifecycle / civil engineering / СAD

Аннотация научной статьи по компьютерным и информационным наукам, автор научной работы — Serafim Zagorodnii, Marina Petrochenko, Pavel Nedviga

The advancement of building information modeling (BIM) technologies is driving the implementation of construction information classification systems (CICS) to structure and standardize data across all phases of a project's lifecycle. This study aims to develop a formalized method for the formation of CICS, incorporate algorithms for selecting expert groups, develop the classification system, and assess its quality using the Delphi method. The proposed approach systematizes the classifier development process and ensures the incorporation of expert opinions, thereby enhancing the objectivity of evaluation and minimizing the risk of subjective distortions. The method consists of multiple iterative development cycles, each accompanied by testing and expert evaluation of the implemented improvements. To assess the effectiveness of the proposed approach, a comparative analysis was conducted, evaluating time and financial expenditures as well as the quality of the classification systems obtained using both the traditional and the newly proposed methods. The method was tested in a real-world production environment, where the CICS developed using the new method received 45 % higher expert ratings compared to traditional methods, while time and financial costs were reduced by 43 %. Thus, the application of the developed method optimizes the formation of CICS and enhances the quality of the final outcome, which is particularly relevant given the increasing complexity of construction projects and the accelerating digitalization of the construction industry.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Method for developing a corporate BIM classification system»

Magazine of Civil Engineering. 2025. 18(4). Article No. 13609

Magazine of Civil Engineering ISSN

° 2712-8172

journal homepage: http://engstroy.spbstu.ru/

Research article UDC 69.05.04 DOI: 10.34910/MCE.136.9

Method for developing a corporate BIM classification system

S.S. Zagorodnii1 , M.V. Petrochenko 1 , P.N. Nedviga 2

1 Peter the Great St. Petersburg Polytechnic University, St. Petersburg, Russian Federation

2 LLC ID Engineering, St. Petersburg, Russian Federation

M zagorodniy. serafim@mail. ru

Keywords: BIM, building information modeling, BIM technologies, classification in construction, construction information classification system, classifier, classifier development method, building lifecycle, civil engineering, СAD

Abstract. The advancement of building information modeling (BIM) technologies is driving the implementation of construction information classification systems (CICS) to structure and standardize data across all phases of a project's lifecycle. This study aims to develop a formalized method for the formation of CICS, incorporate algorithms for selecting expert groups, develop the classification system, and assess its quality using the Delphi method. The proposed approach systematizes the classifier development process and ensures the incorporation of expert opinions, thereby enhancing the objectivity of evaluation and minimizing the risk of subjective distortions. The method consists of multiple iterative development cycles, each accompanied by testing and expert evaluation of the implemented improvements. To assess the effectiveness of the proposed approach, a comparative analysis was conducted, evaluating time and financial expenditures as well as the quality of the classification systems obtained using both the traditional and the newly proposed methods. The method was tested in a real-world production environment, where the CICS developed using the new method received 45 % higher expert ratings compared to traditional methods, while time and financial costs were reduced by 43 %. Thus, the application of the developed method optimizes the formation of CICS and enhances the quality of the final outcome, which is particularly relevant given the increasing complexity of construction projects and the accelerating digitalization of the construction industry.

Citation: Zagorodnii, S.S., Petrochenko, M.V., Nedviga, P.N. Method for developing a corporate BIM classification system. Magazine of Civil Engineering. 2025. 18(4). Article no. 13609. DOI: 10.34910/MCE.136.9

1. Introduction

In recent years, building information modeling (BIM) technologies have significantly transformed the processes of design, construction, and operation of buildings. Unlike traditional methods, where information is distributed among various participants, BIM creates a unified digital model that integrates data on geometry, materials, energy consumption, work schedules, costs, and other characteristics of the building. This model becomes the foundation for decision-making at all stages of the building's lifecycle - from initial design and detailed planning to its operation and subsequent maintenance. Thus, BIM contributes to the full digital transformation of construction processes, ensuring the relevance and availability of real-time information [1, 2]. This significantly enhances the accuracy of design decisions and reduces the number of errors occurring during data transfer between different project participants. As a result, collaboration among architects, engineers, builders, estimators, and other professionals becomes more coordinated and transparent, significantly reducing the time for project development and implementation, lowering costs and enhancing overall efficiency [3, 4].

© Zagorodnii, S.S., Petrochenko, M.V., Nedviga, P.N., 2025. Published by Peter the Great St. Petersburg Polytechnic University.

An important feature of BIM is its ability to model not only the geometric and structural characteristics of buildings but also their operational attributes, such as energy efficiency and material durability, which enables the design of sustainable and energy-efficient buildings [5, 6]. Furthermore, the ability to create digital twins of buildings enables the simulation and testing of various operational scenarios, thereby significantly enhancing the predictability of building behavior over time, including potential emergency situations and repair needs [7, 8].

Against the backdrop of the global digitalization of construction processes, BIM technologies are being increasingly implemented in Russia. In particular, the Russian Federation Government Decree No. 331 dated March 5, 2021, mandates the compulsory use of BIM technologies for developers of multiapartment buildings during the design phase, starting from July 1, 2024. Despite significant progress, according to data from DOM.RF as of January 14, 2025, only 30 % of Russian developers actively use or pilot BIM technologies, while 70 % of developers have yet to integrate these technologies into their processes [9].

One of the key stages in the implementation of BIM is the development and use of a construction information classification system (CICS), which ensures the structuring of data from information models. CICS is a tool that allows for the organization, systematization, and unification of information across all stages of the life cycle of a project. Unlike the traditional approach, where data tends to be fragmented and difficult to access, the classifier creates a structured and logically organized database, ensuring a unified data representation format. This simplifies access to information and makes it more comprehensible for all project participants, from designers to builders, reducing the likelihood of errors and misunderstandings related to the interpretation of information [10, 11].

Classification also allows for the prompt retrieval of necessary data, significantly speeding up the decision-making process. For example, when creating and managing projects, where each stage requires accurate and timely information, structured data prevents time-consuming searches and eliminates information duplication. In this context, the use of CICS not only increases work efficiency but also significantly improves communication among project participants, reducing the risks of errors and delays in construction and design processes [12]. This approach also fosters better interaction between various systems used for automating construction processes, such as project management systems, software solutions for cost estimation and schedule planning, as well as software for cost assessment and deadline control [13, 14].

Different construction and design processes require specific CICS, which determines their variety. For example, in 2020, a domestic CICS was developed by the Federal center of regulation, standardization and technical assessment of compliance in construction (FTSS FAU) for state expertise compliance. This classifier is responsible for the standardization of data to comply with regulatory requirements in construction. However, for other specialized tasks, such as the creation of work volume statements, the development of work schedules and cost estimation, corporate CICS are required, adapted to specific business processes and the employer's information requirements (EIR). It is important that such corporate classifiers may include not only standard data but also specialized categories unique to particular projects or companies, which allows for accounting for each construction object's distinct characteristics and operational requirements [15, 16].

For the effective implementation of corporate CICS, developers can select from several creation methods at the initial stages of BIM implementation, each characterized by distinct features and requirements. There are four primary strategies for developing corporate CICS: creating a classifier from scratch, modifying the existing CICS developed by FTSS FAU, adapting international classification systems, and using modified CICS from other Russian developers.

Each of these options has its advantages and limitations, and the choice depends on the specific conditions and needs of the developer. For example, creating a CICS from scratch requires significant effort and resources, as it not only involves the development of the classifier structure but also requires a comprehensive analysis of the company's business processes and coordination with other participants in the construction process. In the case of modifying the CICS developed by FTSS FAU or adapting international classifiers, developers can save significant time since these classifiers already contain standardized data categories; however, they require further customization to fit specific conditions. Modifying CICS from other Russian developers is a less popular option since such classifiers are usually not published in the public domain, limiting the possibility of their use and further adaptation.

In this regard, an important aspect when choosing an approach for developing a corporate CICS is the evaluation of available international classification systems that have already proven their effectiveness on a global scale and can serve as a foundation for adaptation to the needs of the developer [17]. In the global construction practice, there are many well-known and proven classification systems, such as Uniformat, MasterFormat, OmniClass, Uniclass, CoClass, and others, each of which has its own specifics

and area of application. At the international level, these systems have gained wide recognition due to their functional flexibility and ability to meet diverse requirements in construction management [10, 18].

As a result of a comparative analysis of 12 existing classification systems [19], it was found that the CoClass, the CICS developed by FTSS FAU, Uniclass, and OmniClass represent the most suitable solutions for use in the practice of developers. These systems are characterized by a multifaceted structure that uses a functional grouping approach and are open standards in compliance with international norms. Among the systems considered, special attention should be given to OmniClass and Uniclass, which are widely applied in international practice and cover various aspects of construction activities. OmniClass has additional advantages over Uniclass since it includes recognized classifications, such as MasterFormat and Uniformat, which significantly increase its functional flexibility and areas of application. Moreover, OmniClass is supported by one of the leading international organizations in building information modeling - buildingSMART, which confirms its high relevance and alignment with the latest global trends in the standardization of construction information [20].

The CICS, developed by FTSS FAU, is a system designed for structuring and classifying data in the construction sector. The main objective of CICS is the standardization and unification of construction information, which facilitates its processing, storage, and use at various stages of the building life cycle. CICS includes the classification of construction materials, structures, equipment, and processes, enabling the effective organization and integration of information during the design and operational stages [21].

CoClass is a facet-based classification system based on the Swedish system Byggandets Samordning AB (BSAB). Developed in 1972, it was modified and presented as CoClass at the end of the BSAB 2.0 project. The system includes seven primary and two additional tables, with elements encoded using alphanumeric combinations. CoClass supports open standards, object-orientation and complies with ISO 12006-2, making it suitable for international use in the construction industry [22].

Uniclass is an international classification system developed in the United Kingdom in 1997 to organize the stages of the building life cycle. Initially, it adhered to ISO TR 14177, and later it was adapted to ISO 12006-2 [23]. The system consists of 11 tables, allowing the classification of more than 6,500 elements, such as pipelines, that can be used in various systems. Uniclass is applied for asset and facility management, providing an accurate link between construction elements and their functional roles [24].

OmniClass is a classification system covering the entire building life cycle, from design to demolition. Developed in 2006, it includes 15 tables, each with a multi-level coding system for precise identification of elements [25]. OmniClass integrates data from various classifications, such as Uniformat and MasterFormat, and is used for managing construction information within BIM systems. It complies with ISO 12006-2 and serves as the basis for the National Building Information Standard (NBIMS) and Construction Operations Building Information Exchange (COBie) standards.

Despite the possibility of creating corporate CICS based on international systems, such as OmniClass, Uniclass, and others, each of the proposed approaches is inevitably associated with high costs. This is due to the need to adapt international standards to the specifics of national legislation, the requirements of specific enterprises and the peculiarities of their business processes. Moreover, the lack of standardized methodological materials for developing CICS requires significant labor and financial investments, including the involvement of highly qualified specialists and the conduct of comprehensive research and design work [26, 27]. In this regard, the development of a method for forming a corporate CICS represents a relevant scientific task aimed at optimizing and standardizing the process of creating and implementing classification systems in the construction industry.

The aim of this research is to develop a method for forming a corporate CICS. To achieve this aim, the following research objectives have been formulated:

1. Analysis of existing traditional approaches to the development of a CICS.

2. Development of a new method for forming a corporate construction information classifier.

3. Comparative evaluation of the proposed method and the traditional approach in terms of the quality of the resulting classifiers, as well as the time and financial costs associated with each approach.

2. Methods

Currently, there are no detailed methodological guidelines available in open access for the development of corporate classifiers of construction information. Traditional approaches to the formation of such systems are generally based on expert evaluation methods for assessing the quality of CICS, including interviews, brainstorming sessions, and discussions. However, these methods often lack sufficient systematization and may be subject to subjective distortions, which reduces their reliability and objectivity.

In order to address these limitations and improve the quality of CICS development, a more formalized approach is proposed, incorporating structured consensus-building among experts. Within the framework of the proposed method, experts are selected based on objective criteria, such as the competence coefficient, which ensures a highly qualified expert group and enhances the credibility of its conclusions.

In order to minimize the impact of opinion discrepancies and ensure a high degree of objectivity in the evaluation process, the Delphi method is employed. This method is an effective tool for achieving consensus within an expert group as it involves multiple rounds of surveys with feedback, facilitating the refinement and alignment of viewpoints while reducing the influence of personal biases and group pressure. The application of the Delphi method in this approach not only systematizes the expert evaluation process but also enhances the reliability and objectivity of decision-making, making a significant contribution to the improvement of methodological guidelines for developing corporate CICS. However, it should be noted that this method has potential limitations related to its dependence on the qualification and competence of the selected experts, as well as the challenges associated with adapting the method for small companies with limited resources and expert group size. These factors may affect the comprehensiveness and quality of expert assessments, necessitating additional attention when implementing the method across diverse organizational contexts.

The method for forming a corporate CICS is a set of methods, principles, materials, and tools aimed at developing CICS. The method consists of three stages:

1. Selection of the expert group.

2. Development of the corporate CICS.

3. Quality assessment of the developed CICS based on the Delphi method.

The algorithm for selecting an expert group (Fig. 1):

4. Formation of a candidate list for the expert group. Based on methodological guidelines regarding the composition of the expert group and the list of employees from the developer, a candidate list is compiled with a reserve of approximately 10 % of the final number of experts.

5. Surveying the candidates. Candidates provide statements regarding the inclusion of individuals in the expert group. Each candidate may choose to include or exclude themselves from the expert group.

6. Completion of the survey result matrix. A template matrix is filled out with the results of the candidate survey:

f 1, if the j - th expert named the i - th expert, i] [0, otherwise ( )

7. Expansion of the candidate list. If individuals not included in the initial list appear in the survey result matrix, the candidate list is updated, and steps 2-3 are repeated.

8. Calculation of the competence coefficient of candidates. The competence coefficient for each candidate is determined based on the data from the survey results matrix:

Lm x

k = Lj=1lj , (/=ï;m), (2)

L i=1 L j=1 xij

where ki is the competence coefficient of the l-th expert, m is the number of experts. The competence coefficients are normalized so that their sum equals one:

L=1 K = 1. (3)

9. Interviewing the candidates. Candidates undergo interviews to assess their attitude toward expertise, constructive thinking, level of teamwork and creativity.

10. Selection and formation of the final expert group list. Based on the obtained individual characteristics of experts and the requirements for them, the final expert group list is compiled.

Figure 1. Algorithm for selecting the expert group.

The algorithm for developing a corporate CICS (Fig. 2):

1. Interviewing/brainstorming within the expert group. Interviews and brainstorming sessions are conducted with experts to determine the evaluation characteristics of the developed CICS.

2. Formation of the list of CICS characteristics. Based on methodological guidelines and the results of interviews and brainstorming sessions, a final list of characteristics for evaluating the developed CICS is compiled.

3. Analysis of CICS requirements. Requirements for the CICS are analyzed based on the terms of reference and the compiled list of CICS characteristics.

4. Development of the CICS. The CICS is created based on CICS templates and the CICS requirements.

5. Testing of the CICS. The system undergoes testing using tools for automatic classification of the information model according to the developed CICS.

6. Analysis and correction of CICS errors. If errors are detected during testing, an analysis is conducted, followed by error correction.

7. Expert evaluation of CICS characteristics using the Delphi method (described in detail later).

8. Definition of criteria for the final evaluation of CICS characteristics. After the first expert evaluation of the developed CICS (first iteration), criteria for the final assessment of CICS characteristics are determined.

9. Analysis of expert evaluations of CICS characteristics. If the evaluation of characteristics meets or exceeds the set criteria, the developed CICS is considered to satisfy all requirements, allowing the transition to the implementation phase. Otherwise, step 10 follows.

10. Refinement and modification of the CICS. Based on expert evaluations of CICS characteristics, modifications are made to the system, and the process returns to step 5.

C

o ro

O it—

w w Œ o

c CD

o

M—

C

C O

O

iE E « iS R ^

o tn CD

ro o

Œ O

o

CD

c CD

E

Œ _0

CD >

CD Q

Organizer of the expertise

Figure 2. Algorithm for developing the corporate CICS.

Algorithm for evaluating the quality of the developed CICS based on the Delphi method (Fig. 3):

1. Development of a questionnaire for CICS evaluation. Based on questionnaire templates and the list of evaluation characteristics, a questionnaire is created to assess CICS using the Delphi method.

2. Expert survey. Experts are surveyed to obtain expert evaluations of CICS characteristics. The evaluation is conducted using a 10-point scale, where scores (ranks) may repeat. The survey

results are compiled into a summary ranking matrix assigned by the j -th expert to the i -th characteristic.

(i = 1, n; j = 1, m) , where r.j is the rank

3. Rank restructuring. Since the summary ranking matrix contains tied ranks (identical ranking numbers), the ranks are recomputed to create a new matrix of recomputed ranks based on the following principles:

The expert evaluations of one expert are considered individually.

The smallest value is assigned rank 1, the next smallest is assigned rank 2 and so on.

The highest rank is assigned to the largest value.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

If values are identical, they are assigned the same averaged rank (e.g., if two values share 4th and 5th places, both receive rank 4.5).

4. Statistical processing of survey results. The concordance coefficient of expert opinions and Pearson's chi-square statistic are calculated:

Concordance coefficient for tied (identical) ranks:

W= ^

m2 •(n -n)-m■Y]=xTi (4)

where S is the sum of squared deviations (calculated based on the recomputed ranks), Tj is the indicator of tied ranks in the j -th ranking (calculated based on initial ranks):

-\2

* = ir=! (s7=1 rn -r), (5)

where r is the mean sum of ranks:

Yn Ym r ~ Lai =lZj j=1 'ij

r =--—-

n

(6)

j = SjH -h), (7)

where Hj is the number of tied rank groups in the j -th ranking, hi is the number of tied ranks in the l -th group of tied ranks in the j -th ranking.

• Evaluation of the concordance coefficient. The concordance coefficient W ranges from 0 to 1. A value of W = 1 indicates complete agreement among expert opinions, while W = 0 signifies the absence of agreement. If W > 0.5, the level of agreement among expert assessments can be considered satisfactory, whereas for W > 0.7, the agreement is deemed strong. If W < 0.5, expert assessments require refinement, and the process proceeds to step 5 [28].

2

• Computed value of Pearson's chi-square statistic xcaic with n -1 degrees of freedom:

Xcalc = m-(n-1)-W. (8)

2 2 2

• Expert agreement is considered sufficient if xcaic - X005 , where X005 is the critical value

2 2

of Pearson's chi-square test at the 5 % significance level. If xcaic < X0 05 , it indicates a lack

of agreement among experts, making the final ranking results unreliable. In this case, an additional expert review is necessary, involving a larger number of experts and broadening their specialization, proceeding to step 5. Otherwise, proceeding to step 7 [28].

5. Compilation of a report indicating the dispersion of opinions. Based on the results of statistical processing, a report is generated that includes the dispersion of expert assessments.

6. Surveying the experts. Experts are provided with a report on the results of the previous survey and are subjected to a repeated survey. Experts whose assessments significantly deviate from the majority are required to justify their opinion or revise their decision with an explanation. Then, the process returns to step 3.

7. Comparison of expert evaluations for each CICS characteristic over the last two iterations of CICS development using the Mann-Whitney criterion. To determine the impact of the implemented improvements on the quality of CICS, a null hypothesis is formulated for each characteristic: there are no statistically significant differences between the expert evaluations of a CICS characteristic after the last two iterations of CICS development. To test this hypothesis, two independent samples of expert evaluations for each CICS characteristic are compared using the Mann-Whitney criterion:

• Two samples of expert assessments for a single characteristic after the final and penultimate iteration of CICS development are taken. These samples are conceptually combined into one group, and the ranks within this group are reassigned according to the principle outlined in step 3.

• The sum of the reassigned ranks is calculated separately for each sample.

• The sample with the highest sum of ranks is identified.

• The empirical value of the Mann-Whitney Uemp -statistic is calculated using the formula:

nx •(nx +l)

Uemp = «1 * n2 + X V2X ' - Tx, (9)

where n1, n2 are the numbers of expert assessments in the first and second sample, respectively; nx is the number of expert assessments in the sample with the highest sum of ranks; Tx is the highest sum of ranks.

• The empirical value of the Mann-Whitney Uemp -statistic is compared with the critical value

Ucri. If the empirical value Uemp is less than or equal to the critical value (Ucri), the

existence of statistically significant differences between expert assessments of CICS characteristic in the compared samples is recognized (i.e., the alternative hypothesis H1 is accepted). If the empirical value is greater than the critical value, the null hypothesis of no statistically significant differences is accepted. The significance of the differences increases

as the empirical value Uemp decreases.

• Thus, the null hypothesis is tested for each CICS characteristic. If the null hypothesis of no statistically significant differences is supported for a characteristic, the latest improvements in CICS have not affected its quality, and this factor should be taken into account in future improvements. If the alternative hypothesis indicating the presence of statistically significant differences is supported, the latest improvements in CICS have influenced its quality.

8. Determination of generalized assessments of characteristics. Based on the results of statistical processing, generalized assessments of the characteristics are determined.

9. Report generation. A report is compiled on the assessment of the developed CICS.

Figure 3. Algorithm for evaluating the quality of the developed CICS based on the Delphi method.

The validation of the developed method was conducted in a real-world production environment, specifically in the project department of the developer. As part of the comparative analysis, two versions of CICS were developed using different approaches: the traditional method and the proposed method, applied in two iterations.

To evaluate the effectiveness of the proposed approach and facilitate its further optimization, the following steps were implemented:

• Empirical determination of the time costs associated with classifier development using both the traditional and proposed methods.

• Calculation of financial costs for CICS development based on data on labor time expenditures, as well as information from Rosstat on the average monthly nominal accrued wages of employees working in information technology for the construction sector in Moscow for the period from January to October 2024.

• Evaluation of the quality of CICS developed using the traditional and proposed methods based on the Delphi method.

• Comparison of expert assessments of CICS characteristics formed using the traditional and proposed methods by applying the Mann-Whitney criterion. This made it possible to identify the impact of the developed method on the quality of the created CICS. During the analysis, a null hypothesis was initially formulated for each CICS characteristic, stating that there are no statistically significant differences between expert assessments of CICS characteristics obtained using the traditional and developed methods. The comparison was conducted following the principles outlined in step 7 of the "Algorithm for evaluating the quality of the developed CICS based on the Delphi method", ensuring the objectivity and reproducibility of the obtained results.

3. Results and Discussion

As a result of the validation of the developed method, 15 candidates for the expert group were identified, and the competence coefficients of the candidates were determined (Table 1). Based on these coefficients, an expert group consisting of 12 members was formed, including design engineers, technical customer representatives, and BIM specialists (Table 2).

Table 1. Competence coefficients of candidates.

ki ^2 k3 k4 ^5 k6 k7 k8 k9 k^ k^ k^ k^ k^ 0.07 008 004 007 007 008 007 007 005 006 008 007 007 007 0.05

Table 2. Composition of the expert group.

Expert position Expert department Quantity

BIM coordinator/manager BIM department 4

Engineer of production and technical department Development department (technical customer) 2

Design engineer for construction organization project Design department 2

Architect Design department 1

Design engineer for electrical systems and equipment Design department 1

Estimating engineer Design department 2

Total 12

Based on the results of interviews and brainstorming sessions with the expert group, a final list of characteristics for evaluating the developed CICS was compiled (Table 3).

Table 3. List of characteristics for evaluating the developed CICS.

№ Name Description

C1 Hierarchy The structure of the classifier should be organized in a hierarchy, where categories and elements are logically distributed across levels

C2 Logic and ease of use The classifier should be intuitive and user-friendly, with a clear and logical structure that is easily perceived by users

C3 Scalability and flexibility The classifier should support the possibility of expansion by adding new categories or elements and be flexible for adaptation to new requirements

C4 Compatibility of facets (aspects) The ability to use different facets or aspects of classification within the same context without creating data conflicts

C5 Independence of facets (aspects) Separation of classification aspects so that they are independent of each other and can function autonomously

C6 Compliance of information presentation aspects with user needs Classification aspects should be oriented towards the needs and requirements of end-users, providing maximum value and convenience

C7 Ability to divide according to required sections The classifier should support the ability to divide elements into various required categories and sections for detailed work

C8 Consistency with regulations and standards The classifier must comply with current regulatory requirements and standards, ensuring conformity with industry and legal norms

C9 Rationality of using categories for elements modeled through other categories When categories other than the primary ones are used for modeling elements, this should be justified in terms of logic and functionality

C10 Appropriateness of linking the classification parameter to type/instance Classification parameters should be linked to the type or instance depending on their significance and the features of the objects they are intended for

C11 Consistency of parameter usage by specialists from different departments Classification parameters should be coordinated between departments to avoid conflicts and misunderstandings in data usage

C12 Sufficient detail for linking with The classifier should provide sufficient detail for accurate linking with cost

cost estimate items estimate items, without unnecessary complexity or loss of accuracy

C13 Minimization of redundant detail for linking with cost estimate items Redundant detail should be minimized to keep the classifier efficient and avoid overloading it with unnecessary data

C14 Sufficient detail for linking with The classifier should provide sufficient detail for accurate linking with work

work schedule positions schedule positions, without unnecessary complexity or loss of accuracy

C15 Minimization of redundant detail for linking with work schedule positions Redundant detail should be minimized to keep the classifier efficient and avoid overloading it with unnecessary data

C16 Sufficient detail for linking with technical customer requests The classifier should provide sufficient detail for accurate linking with technical customer requests, without unnecessary complexity or loss of accuracy

C17 Minimization of redundant detail for linking with technical customer requests Redundant detail should be minimized to keep the classifier efficient and avoid overloading it with unnecessary data

C18 Sufficient detail for linking with expert requirements The classifier should provide sufficient detail for accurate linking with expert requirements, without unnecessary complexity or loss of accuracy

C19 Minimization of redundant detail for linking with expert requirements Redundant detail should be minimized to keep the classifier efficient and avoid overloading it with unnecessary data

To evaluate the effectiveness of the developed method, two versions of CICS were created: one using the traditional approach and the other developed through two iterations of the proposed method. The results of the quality assessment of the created CICS, conducted using the Delphi method - comparing the traditional method, the proposed method after the first iteration, and the proposed method after the second iteration - are presented in Table 4 and illustrated by histograms in Fig. 4.

Table 4 shows that in all three cases, the concordance coefficients were greater than 0.5, and the

2 2

calculated Pearson criteria (xcalc ^X)05) indicated that the degree of consistency in expert evaluations in all three cases can be considered satisfactory and sufficient.

Table 4. Quality evaluations of the developed CICS based on the Delphi method.

№ of characteristic Traditional method Proposed method (1st iteration) Proposed method (2nd iteration)

Weight of characteristic Average rank Weight of characteristic Average rank Weight of characteristic Average rank

C1 0.083 6.92 0.086 7.42 0.089 9.50

C2 0.034 4.75 0.045 5.75 0.035 7.67

C3 0.049 5.25 0.056 6.17 0.075 8.92

C4 0.091 7.17 0.074 6.92 0.068 8.67

C5 0.065 6.00 0.070 6.67 0.077 9.00

C6 0.061 5.75 0.056 6.17 0.060 8.42

C7 0.043 5.08 0.026 4.92 0.030 7.50

C8 0.082 6.92 0.076 7.00 0.073 8.83

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

C9 0.040 4.92 0.029 5.08 0.061 8.42

C10 0.045 5.08 0.045 5.75 0.057 8.33

C11 0.045 5.17 0.061 6.33 0.034 7.67

C12 0.082 6.83 0.080 7.17 0.070 8.83

C13 0.011 3.25 0.011 3.92 0.025 7.33

C14 0.049 5.33 0.051 6.00 0.042 7.92

C15 0.022 4.08 0.015 4.33 0.011 6.67

C16 0.059 5.75 0.072 6.75 0.078 9.08

C17 0.026 4.33 0.029 4.92 0.046 8.00

C18 0.067 5.92 0.067 6.67 0.035 7.67

C19 0.046 5.17 0.050 5.92 0.036 7.67

W 0.617 W 0.618 W 0.608

Xcalc 133.191 Xcalc 133.381 Xcalc 131.237

x0.05 28.869 x0.05 28.869 x0.05 28.869

Number of iterations Number of iterations Number of iterations

of expert evaluations 3 of expert evaluations 3 of expert evaluations 2

Weighted average rank 5.86 Weighted average rank 6.38 Weighted average rank 8.50

Figure 4. Average rank of CICS characteristics (*WA rank - weighted average rank).

Based on the histograms of the average ranks of CICS evaluation characteristics (Fig. 4), the following hypotheses were formulated:

1. When forming the CICS using the proposed method after the second iteration, the quality of the CICS improved across all characteristics.

2. When forming the CICS using the proposed method, a higher quality of the CICS was achieved across all characteristics compared to the traditional method.

To prove these hypotheses, the corresponding null hypotheses were formulated:

1. There are no statistically significant differences between the expert evaluations of CICS characteristics after the last two iterations of CICS development using the proposed method.

2. There are no statistically significant differences between the expert evaluations of CICS characteristics obtained using the traditional and proposed methods.

To test the hypotheses, we performed a comparison of two independent samples of expert evaluations for each CICS characteristic using the Mann-Whitney test (Table 5). From the table, it is evident

that the obtained empirical value of the Mann-Whitney Uemp -statistic for each characteristic are lower than

the critical value Ucrt = 42, indicating the existence of statistically significant differences between the

expert evaluations of CICS characteristics in the compared samples (i.e., the alternative hypotheses are accepted).

Table 5. Hypothesis testing using the Mann-Whitney test.

№ of characteristic Hypothesis 1 Hypothesis 2

Sum of sample ranks Uemp Sum of sample ranks

Proposed method (1st iteration) Proposed method (2nd iteration) Proposed method (2nd iteration) Traditional method Uemp

C1 78.0 222.0 0 222 78 0

C2 80.0 220.0 2.0 222 78 0

C3 78.0 222.0 0 222 78 0

C4 84.0 216.0 6.0 216 84 6

C5 79.5 220.5 1.5 222 78 0

C6 81.5 218.5 3.5 222 78 0

C7 78.0 222.0 0 222 78 0

C8 86.0 214.0 8.0 214 86 8

C9 78.0 222.0 0 222 78 0

C10 78.0 222.0 0 222 78 0

C11 96.0 204.0 18.0 222 78 0

C12 90.5 209.5 12.5 212 88 10

C13 78.0 222.0 0 222 78 0

C14 90.5 209.5 12.5 222 78 0

C15 78.0 222.0 0 222 78 0

C16 81.0 219.0 3.0 222 78 0

C17 79.5 220.5 1.5 222 78 0

C18 98.0 202.0 20.0 218 82 4

C19 85.5 214.5 7.5 222 78 0

Ucrt 42 Ucrt 42

Thus, the hypotheses we proposed are confirmed:

1. When creating the CICS using the proposed method, the improvements adopted after the first iteration contributed to the enhancement of the CICS quality across all characteristics.

2. When creating the CICS using the proposed method, a higher quality of the CICS was achieved across all characteristics compared to the traditional method.

As a result of testing the proposed method, the empirical time and financial costs for the development of the classifier using both the traditional and proposed methods were determined (Table 6). The cost reduction ratio of the proposed method amounted to:

dCRR = Ttm - TPM . 100% = 536 - 304 -100% = 43%, (10

TTM 536 )

where Ttm , Tpm are the time or financial costs for the development of the CICS using the traditional method (TM) and the proposed method (PM), respectively.

Table 6. Time and financial costs for the development of CICS.

Time costs, hours Average daily salary, RUB Financial costs, RUB

Traditional method 536 1,049 70,283

Proposed method 304 1,049 39,862

A theoretical study was also conducted to examine the relationship between the cost reduction ratio of the proposed method and the number of iterations in the development of the CICS (simulation of the processes of expansion and refinement of the CICS). From the graph (Fig. 5), it is evident that up to six iterations, the highest increase in the cost reduction ratio is observed, after which the growth slows down. The most cost-effective application of the proposed method occurs in processes with two iterations, with a reduction in costs of 50 %. This method is suitable for the development of a corporate CICS, typically involving between two and five iterations before commissioning.

Cost reduction ratio

65% 60%

55%

50%

45%

40%

0 2 4 6 8 10 12 14 16

Number of iterations in CICS development

Figure 5. Dependence of the cost reduction ratio of the proposed method on the number of

iterations in CICS development.

It is important to emphasize the originality of the present study. Despite a comprehensive literature review, no studies directly comparable to the presented results were identified at the time of this research. Consequently, a comparative analysis with findings from other authors could not be conducted.

4. Conclusions

The result of the conducted research is the developed method for forming a corporate CICS, which ensures improved quality, reduced time, and financial costs in the development and adaptation of the CICS compared to traditional approaches.

The main results obtained during the testing of the method are as follows:

• The weighted average expert evaluation of the CICS quality, formed using the developed method, was 8.50 points, which is 45 % higher than when using the traditional method (5.86 points), confirming the higher quality of the developed CICS.

• The time costs for creating the CICS using the proposed method amounted to 304 hours, while the traditional method required 536 hours. The reduction in costs using the new method was 43 %.

• The financial costs for the development of the CICS using the proposed method were 39,862 rubles, which is 43 % lower than the costs of the traditional method (70,283 rubles).

Additionally, a theoretical study was conducted to examine the relationship between the cost reduction ratio of the proposed method and the number of iterations in the development of the CICS. The analysis showed that the greatest increase in the cost reduction ratio occurs within the range of up to six iterations, after which the growth rate slows down. The optimal application of the proposed method is in processes involving between two and five iterations, where the cost reduction ratio of at least 50 % is achieved.

The application of the proposed method significantly reduces the costs associated with the development and maintenance of the CICS, while providing system flexibility in the context of the need for subsequent adjustments and expansions. The method is most effective when developing CICS with a larger number of iterations, which is particularly relevant for corporate systems that are in the stage of active development and adaptation to organizational needs.

In addition, the proposed method has the potential for implementation in various organizations and adaptation to diverse contexts, which expands its practical applicability across different sectors of the construction industry and allows for the consideration of specific requirements and features of corporate processes. It is particularly suitable for development companies and design bureaus that need to create and expand their own construction information classifiers for project and resource management. The method can also be effectively applied in companies that are at the initial stages of implementing BIM technologies, helping them to approach the formation and development of classification systems in a systematic manner with minimal time and financial expenditures.

References

1. Ariono, B., Wasesa, M., Dhewanto, W. The Drivers, Barriers, and Enablers of Building Information Modeling (BIM) Innovation in Developing Countries: Insights from Systematic Literature Review and Comparative Analysis. Buildings. 2022. 12(11). Article no. 1912. DOI: 10.3390/BUILDINGS12111912

2. Nguyen, T.D., Adhikari, S. The Role of BIM in Integrating Digital Twin in Building Construction: A Literature Review. Sustainability.

2023. 15(13). Article no. 10462. DOI: 10.3390/SU151310462

3. Wang, K., Zhang, C., Guo, F., Guo, S. Toward an Efficient Construction Process: What Drives BIM Professionals to Collaborate in BIM-Enabled Projects. Journal of Management in Engineering. 2022. 38(4). Article no. 04022033. DOI: 10.1061/(ASCE)ME. 1943-5479.0001056

4. Qiu, Q., Zhou, X., Zhao, J., Yang, Y., Tian, S., Wang, J., Liu, J., Liu, H. From sketch BIM to design BIM: An element identification approach using Industry Foundation Classes and object recognition. Building and Environment. 2021. 188. Article no. 107423. DOI: 10.1016/J.BUI LDENV.2020.107423

5. Gong, S. Performance Analysis of Application of BIM Technology and Two-Way Progressive Optimization Algorithm in Energy-Saving Design of Residential Buildings Based on BIM Technology. Journal of Electrical Systems. 2024. 20(4s). Pp. 252-265. DOI: 10.52783/JES.1911

6. Bhilare, S., Khatri, D., Rangnekar, S., Chen, Q. Using BIM to Facilitate Generative Target Value Design for Energy Efficient Buildings. Proceedings of the International Symposium on Automation and Robotics in Construction. Chennai, 2023. Pp. 667-674. DOI: 10.22260/ISARC2023/0093

7. Lemian, D., Bode, F. Digital twins in the building sector: Implementation and key features. E3S Web of Conferences. 2025. 608. Article no. 05004. DOI: 10.1051/E3SCONF/202560805004

8. Zhou, X., Sun, K., Wang, J., Zhao, J., Feng, C., Yang, Y., Zhou, W. Computer Vision Enabled Building Digital Twin Using Building Information Model. IEEE Transactions on Industrial Informatics. 2023. 19(3). Pp. 2684-2692. DOI: 10.1109/TII.2022.3190366

9. Tekhnologii informatsionnogo modelirovaniia | EISZHS [Information modeling technologies | EISZHS] [Online]. URL: https://clck.ru/3HS2gr (date of application: 10.02.2025).

10. Royano, V., Gibert, V., Serrat, C., Rapinski, J. Analysis of classification systems for the built environment: Historical perspective, comprehensive review and discussion. Journal of Building Engineering. 2023. 67. Article no. 105911. DOI: 10.1016/J.JOBE.2023.105911

11. Guven, G., Arceo, A., Bennett, A., Tham, M., Olanrewaju, B., McGrail, M., Isin, K., Olson, A.W., Saxe, S. A construction classification system database for understanding resource use in building construction. Scientific Data. 2022. 9(1). Article no. 42. DOI: 10.1038/s41597-022-01141 -8

12. Petrov, A.E., Poshev, A.U.B. Increasing the productivity of construction projects with the use of technology BIM and blockchain. Modern Science: actual problems of theory and practice. Series: Natural and Technical Sciences. 2024. 7/2. Pp. 148-153. DOI: 10.37882/2223-2966.2024.7-2.26

13. Cerezo-Narváez, A., Pastor-Fernández, A., Otero-Mateo, M., Ballesteros-Pérez, P. Integration of Cost and Work Breakdown Structures in the Management of Construction Projects. Applied Sciences. 2020. 10(4). Article no. 1386. DOI: 10.3390/APP10041386

14. Luo, H., Gao, G., Huang, H., Ke, Z., Peng, C., Gu, M. A Geometric-Relational Deep Learning Framework for BIM Object Classification. Lecture Notes in Computer Science. 2022. 13807. Computer Vision - ECCV 2022 Workshops. ECCV 2022. Pp. 349-365. DOI: 10.1007/978-3-031-25082-8_23

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

15. Gelder, J.E. The Design And Development Of A Classification System For BIM. WIT Transactions on The Built Environment. 2015. 149. Pp. 477-491. DOI: 10.2495/BIM150391

16. Chung, T., Bok, J.H., Ji, H.W. A Multi-Story Expandable Systematic Hierarchical Construction Information Classification System for Implementing Information Processing in Highway Construction. Applied Sciences. 2023. 13(18). Article no. 10191. DOI: 10.3390/APP131810191

17. Lou, E.C.W., Goulding, J.S. Building and Construction Classification Systems. Architectural Engineering and Design Management. 2008. 4(3-4). Pp. 206-220. DOI: 10.3763/AEDM.2008.0079

18. Petrochenko, M.V., Nedviga, P.N., Kukina, A.A., Strelets, K.I., Sherstyuk, V. V. Machine learning model for the BIM classification in IFC format. Magazine of Civil Engineering. 2024. 126(2). Article no. 12602. DOI: 10.34910/MCE.126.2

19. Zagorodnii, S.S., Nedviga, P.N. Otsenka sootvetstviia sistem klassifikatsii stroitel'noi informatsii trebovaniiam zastroishchika [Assessment of compliance of construction information classification systems with the requirements of the developer]. Sbornik materialov vserossiiskoii konferentsii NEDELIA NAUKI ISI [Proceedings of the All-Russian Conference ISI SCIENCE WEEK].

2024. Pp. 35-37. [Online]. URL: https://www.elibrary.ru/item.asp?id=67919329 (date of application: 12.02.2025).

20. BuildingSMART International. [Online]. URL: https://clck.ru/3JkALA (date of application: 15.02.2025).

21. Volkodav, V.A., Volkodav, I.A. Development of the structure and composition of a building information classifier towards the application of BIM technologies. Vestnik MGSU. 2020. 15(6). Pp. 867-906. DOI: 10.22227/1997-0935.2020.6.867-906

22. Svensk Byggtjanst. Om CoClass - nya generationen BSAB [About CoClass - the new generation BSAB]. 2019. [Online]. URL: https://coclass.byggtjanst.se/about#about-coclass (date of application: 01.03.2025).

23. Crawford, M., Cann, J., O'Leary, R. Uniclass: Unified Classification for the Construction Industry. 1st edn. RIBA Publications Ltd. London, 1997.

24. Pupeikis, D., Navickas, A.A., Klumbyte, E., Seduikyte, L. Comparative Study of Construction Information Classification Systems: CCI versus Uniclass 2015. Buildings. 2022. 12(5). Article no. 656. DOI: 10.3390/BUILDINGS12050656

25. CSI. OmniClassTM: A Strategy for Classifying the Built Environment. Introduction and User's Guide. 1st edn. 2006.

26. Saleeb, N., Marzouk, M., Atteya, U. A comparative suitability study between classification systems for BIM in heritage. International Journal of Sustainable Development and Planning. 2018. 13(1). Pp. 130-138. DOI: 10.2495/SDP-V13-N1-130-138

27. Lu, S., Yu, Z., Zhou, Z., Wei, L., Luo, Z. BIM Information Classification and Codification for manufacturing Heritage Buildings. Journal of Physics: Conference Series. 2022. 2261(1). Article no. 012020. DOI: 10.1088/1742-6596/2261/1/012020

28. Skvortsov, S. V., Khryukin, V.I., Skvortsova, T.S. Consistency analysis of specialist views under conditions of contradictory expert estimates of project alternatives. Vestnik of Ryazan State Radio Engineering University. 2021. 76. Pp. 53-64. DOI: 10.21667/1995-4565-2021-76-53-64

Information about the authors: Serafim Zagorodnii,

ORCID: https://orcid. org/0009-0009-7500-7307 E-mail: [email protected]

Marina Petrochenko, PhD in Technical Sciences ORCID: https://orcid. org/0000-0002-4865-5319 E-mail: mpetroch@mail. ru

Pavel Nedviga,

E-mail: pavel. nedviga@gmail. com

Received 05.04.2025. Approved after reviewing 14.06.2025. Accepted 16.06.2025