Научная статья на тему 'Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine site'

Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine site Текст научной статьи по специальности «Энергетика и рациональное природопользование»

CC BY
72
22
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
open-underground mining / coal deposits / strip ratio / modular mine site / related infrastructure

Аннотация научной статьи по энергетике и рациональному природопользованию, автор научной работы — Roman I. Shishkov, Valerii A. Fedorin

The article considers one actual method for development coal deposits in the Kuzbass by open-underground mining. The scientific and practical advantages of the proposed method due to the use of common infrastructure of coal mine and a modular mine site (subsequently transformed into a mining and technological structure operating according to the mine – longwall scheme) are presented. Currently, a development strategy for Kuzbass until 2035 has been developed. As part of the strategy, a draft program for subsoil use is being formed in the coal industry department. The program should take into account all the positive and negative aspects associated with coal mining in cities and municipal areas and also their prospects. In the Kuznetsk coal basin, 42 mines and 52 opencast mines are mining, of which 12 enterprises use partially unified infrastructure. According to the results of open-underground mining work conducted by the laboratory of the Institute of Coal and Coal Chemistry of the Siberian Branch of the Russian Academy of Sciences (Institute of Coal SB RAS), the list of sites includes favorable mining and geological conditions with incidence angles of up to 18 degrees. As open-pit coal production increases, many sites encounter such a parameter as maximum allowable (boundary) strip ratio. At the stage of preparing the feasibility study for the development of a coal deposit, this coefficient is calculated first of all, since duration of enterprise’s work and its economic component depend on it. In order to increase parameters, it is necessary to carry out transition from open works to underground. As a result, coal mine will not work at a loss, providing production with an economically disadvantageous strip ratio.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine site»

UDC 622.2

Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine site

Roman I. SHISHKOV», Valerii A. FEDORIN

Institute of Coal SB RAS, Kemerovo, Russia

The article considers one actual method for development coal deposits in the Kuzbass by open-underground mining. The scientific and practical advantages of the proposed method due to the use of common infrastructure of coal mine and a modular mine site (subsequently transformed into a mining and technological structure operating according to the mine - longwall scheme) are presented. Currently, a development strategy for Kuzbass until 2035 has been developed. As part of the strategy, a draft program for subsoil use is being formed in the coal industry department. The program should take into account all the positive and negative aspects associated with coal mining in cities and municipal areas and also their prospects. In the Kuznetsk coal basin, 42 mines and 52 opencast mines are mining, of which 12 enterprises use partially unified infrastructure. According to the results of open-underground mining work conducted by the laboratory of the Institute of Coal and Coal Chemistry of the Siberian Branch of the Russian Academy of Sciences (Institute of Coal SB RAS), the list of sites includes favorable mining and geological conditions with incidence angles of up to 18 degrees. As open-pit coal production increases, many sites encounter such a parameter as maximum allowable (boundary) strip ratio. At the stage of preparing the feasibility study for the development of a coal deposit, this coefficient is calculated first of all, since duration of enterprise's work and its economic component depend on it. In order to increase parameters, it is necessary to carry out transition from open works to underground. As a result, coal mine will not work at a loss, providing production with an economically disadvantageous strip ratio.

Key words: open-underground mining; coal deposits; strip ratio; modular mine site; related infrastructure

How to cite this article: Shishkov R.I., Fedorin V.A. Justification of stripping and development of a modular mine site for a combined coal mining method in Kuzbass on the example Baikaimskaya mine. Journal of Mining Institute. 2020. Vol. 243, p. 293-298. DOI: 10.31897/PMI.2020.3.293

Introduction. In order to increase production volumes and move to a new stage development of coal industry, we need new technologies that will increase the technical, economic and environmental indicators, which is possible with a more complete underground mining development. The article deals with one of the directions of open-underground mining operations, which can reduce the land-consuming of the mining and technological structure in general, while increasing the productivity of the enterprise due to a number of stripping and development parameters on coal formations using modular mine sites, which are later converted into a mine-longwall if necessary.

Formulation of the problem. The aim of this work is to generalize method of stripping and development modular mine sites during combined (open-underground) mining coal deposits. The objective of the study is to analyze the actual development of mining front of the technological structure "open-pit - modular mine site" with a sequential stripping.

Discussion. The modular mine site was developed at Mokhovsky open-pit mine, which was formed in 2009 by the merger of three mines - Mokhovsky, Sartakinsky and Karakansky. The Mokhovsky branch was founded in 1966. After 11 years, open-pits were merged into one enterprise located in the southwestern part of Leninsk-Kuznetsk district in Leninsky and Saltymakovsky geological and industrial regions of Kuznetsk coal basin. The mining depth and strip ratio reach maximum technical values for existing excavation and other mining equipment, economic indicators section is reduced. Upon reaching boundary ratio, the remaining coal formation at the license boundary refers to operational losses. To solve this problem, the strip and direct work out in cost-effective underground method are performed from the side surface of the mine. This method significantly

improves the position of the open-pit on the basis of parameter estimates of coal mining of the open-underground method for different groups of geological conditions (in terms of thickness and dip angle of the formation). The conditions are met when the cost of open works and underground works is equal [17].

The formation has a synclinal structure, extending from northwest to southeast, asymmetric structure is a gently sloping southwestern wing and a steep northeastern wing. The fold has a wide bottom, up to 7 km. To the northwest, the fold gradually narrows and has only one wing, as its southwest wing has a violation. The axis of the fold sinks gently in a south-easterly direction. Disjunctive tectonics of the site is represented by a relatively small number of violations:

• violation I-I = a longitudinal dissonant upthrust with the fall displacer to south-west at an angle 20-40 ° and an offset amplitude 130-140 m; accompanied by a zone continuous crushing rocks with a thickness 10-30 m;

• violation II-II - longitudinal consonant upthrust with fall displacer to southwest at an angle of 20-40°; the amplitude displacement, measured along strike, is 40-100 m; violation is accompanied by a zone intense crushing rocks with a thickness of 10-40 m;

• Iganinsky upthrust - a consonant upthrust with fall of displacer to southwest, at an angle of 35-40°, with a stratigraphic amplitude of 220 to 560 m; has a crumpled rock zone with a normal thickness 40-60 m.

The field of Mokhovsky open-pit on which Baikaimskaya mine site is located, is characterized by a simple geological structure and, according to classification, belongs to the 1st group of deposits.

The tectonics of underground mining is sustained, the formation has a calm bedding, the dip angles vary between 14-20°, the Kuznetsky coal basin is rich in deposits with shallow bedding, as a result of which the transfer of open work to underground work using related mine infrastructure is widely used [16].

At the Baikaimskaya mine site, trenches from open-pit mining were used to construct the mouths of stripping workings. This is due to fact that at the initial stage of designing, the underground development was not provided and the need for internal dumping was forced. Nevertheless, this method of transition to underground mining with combined method is one of the most favorable, since workings open up formation immediately without passing through waste rock, which also increases economic performance of an enterprise.

It should be noted that stripping and development project provides for mining operations that extended along the boundaries of the mine field. The protection of mine workings that contour mine field is carried out by coal pillars, while following options are possible in related territory:

1) mining was not carried out and future mining is not expected;

2) mining was not carried out, but mining is not excluded in future;

3) there are development mine workings in operation;

4) there are offset development mine workings;

5) near the boundary of mine field, the stoping works have been carried out and there is a worked out site.

In our case, this is the first option, when development and stripping mine workings can be carried out directly along mine lease boundary, without leaving pillars, while ensuring most complete extraction of the mineral resources located on the mine lease territory, since the completeness of reserves extraction is one of the main requirements of mineral resources protection.

However, if there are development or stoping mine workings in neighboring site, the size of barrier pillars should provide reliable aero- and waterproofing of the existing mine workings from mining operations of the related enterprise.

At the borders with mining operations of a related enterprise and contouring underground mine workings, a barrier coal pillar must be left. The pillar width is determined according to instructions for safe mining operations in flooded workings:

Bp = 0.05Н + 5m + M> 20.0 m,

(1)

где Н - pillar depth from earth's surface, m; m - development thickness (height of the ward working), m; M - mine position error, m.

Then (Fig. 1), the location of the contouring mine at boundary with open-pit is determined. By measurement the distance between the mine lease boundary and the related outlining workings is located Bp(l). If mining operations were not conducted below the lower boundary of the mine field, then it should not be excluded that they can be conducted, so the lower parallel gate way should be carried out at a distance from the border equal to half the calculated width of the barrier pillar.

The location of the contouring workings in development is determined by the method of construction at the shift angles (Fig.1, b)

Bpi = Bp + M/tg(A),

(2)

when A - complete shift angle along strike formation, deg.

Such mining operations are dynamically progressing abroad, in such developed countries as Australia, USA and Canada, where scientists pay great attention to effectiveness of combined method and safety [18-21]. In domes-

tic practice, at Sibirginsky coal open-pit, one of the first similar processes was conducted back in 1999 [14].

At the Institute of coal SB RAS there was developed a dependence (Fig.2), based on which [15], it can be seen that the less maintain workings in the mine are carried out, the less its entropy is. Thus, the dependence shows high production indicators for such coal mining complexes as modular mine sites. This dependence becomes relevant when there is a rational use of the existing infrastructure of the mining enterprise.

Reducing the length of maintain workings is known to improve the work of all production mine systems, which creates conditions for achieving a high load on the stope and development faces. At the same time, the number of jobs is minimized, labor productivity and wages are growing, and the cost of production is decreasing. The technical and economic indicators of the Baikaimskaya mine site of the Mokhovsky open-pit significantly exceed similar indicators of a representative group of Kuzbass mines at the construction stage.

Using the experience accumulated at the Institute of Coal SB RAS and the global experience of similar solutions [3-12], a wide range of technologies for stripping and development a

Mine lease boundary

Formation I

М

Formation II

Mine lease boundary

_B_

Bp

->pii

Fig. 1. Scheme for determining the barrier pillar width to fall formation (a), along strike formation (b) A, y - complete shift angles

Но

2.5

1.5

0.5

Traditional

Coal mining complex

V Mines with fields divided into pillars

Modular mine site

10

11

The number of elements

Fig.2. Summary quantitative assessment of entropy H0 depending on the number of elements of the mining and technological structure of coal mines [13]

b

3

2

1

0

2

3

4

5

6

7

8

9

modular mine site is provided. In the example, from the point of view of economic efficiency and environmental safety, the central and flanking inclined shafts of the mine were laid from open-pit sites.

The boundaries mine fields along strike correspond to licensed materials and pass close to flank and central parts of the mine field; according to fall, boundary mine field is conveyor drift excavation column. This decision of formation cutting allows to ensure a constant outflow of available groundwater falling into workings and to push them into the worked out space, which favorably affect the technology of the mining site formation and does not violate it. Before starting work on the main mine field (main stage), construction and coal mining of the modular mine site on the Poly-saevsky II formation begins from the flank industrial site (initial stage). It was planned to stop open-pit mining operations in the area of construction of the flank industrial site, leaving the pillar between the side of the cut and the flank slopes and also conducting from the flank and main industrial sites the two slopes for coal (ventilation and conveyor) with a pillar between them.

According to the project for stripping formation and carrying out the most labor-consuming part of the main and flank slopes along the overburden, the available open-pits earthmoving equipment is used, that will speed up the stripping to the stable rocks and enable to begin the excavation slope roadheaders.

The main conveyor slope has tilt angles from 19 to 23°. In this site, the roller supports of the belt conveyor are installed with a smaller interval between them, and the side rollers are installed more steeply than usual.

The first face preparation is provided for by ventilation, conveyor drifts and mounting box. Along with this, the main conveyor and track drifts are carried out (they are preserved for the entire life of the mine).

Based on the mining and geological conditions of the Polysaevsky II formation, the long pillar system along strike with a stoping mechanized complex is adopted. Mining out of the pit pillars of a mine field is performed in the direction from the flank slopes to the main ones. The order of mining out columns is accepted descending. The extraction pillar development of mine field is carried out in the direction from the flank slopes to the main ones. The order of extraction pillar development is accepted descending.

Based on the foregoing, in 2003 the company Kuzbassrazrezugol and the Mokhovsky open-pit started the construction of the modular mine site. At the moment, this site has been transformed into Baykaimskaya Mine LLC, which is mining longwall in Polysaevsky II formation of grade D. Mine balance reserves are estimated at 68 million 699 thousand tons. The average annual production is 2.5 million tons.

Technical and economic indicators of the conducting volume of the maintained development workings per 1000 tons of coal production from several projects at the time of mines construction relative to the modular mine site in Kuzbass [2]:

Name of mines

The length of maintain workings Total, thousand m Per 1000 t of coal production, m

Fizkulturnik

Sibirskoye colliery group

Pervomaiskaya

Berezovskaya

named by Kirov

Egozovskaya

Komcomolets

Yuzhnaya

Polysaevskaya

Octyabrskaya

Krasnoyarskaya

Novaya

Kolmogorovskaya The average among mines Baikaimskaya modular mine site Mine site on average for the mines, %

24.7 19 22 57.9 17.7 31

98 27,5 81.5 78 69.5

40.8

68.7

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

31.8

92.7

98.8

32.3 75.2 29.7 43.5 30.5

25.4 105.5 52.1 52.9

39.1 56.4 76.0 91.4

30,8

8.9

17

Thus, the length of maintained mine workings is 3.3 times less (31 %) compared with other mines, and 5.9 times (17 %) per 1000 tons of mined coal.

Conclusions

The use of innovative scientific provisions [15] and also the world experience of the combined development system, will make it possible to achieve a whole chain of positive results in terms of technology [1]:

• synthesize underground and open-pit mining as a modular mining and technological structure "open-pit - modular mine site" for mutual coordination in time and structural elements;

• establish a balance of technological links of open-pit and underground mining operations for a more reasonable cost and, as a result, a higher coefficient of environmental cleanliness;

• create conditions for sequential production of coal mining processes by modular mine sites for maximum productivity of mining operations in open-pit;

• unite most production infrastructure - power lines, substations, roads, transport, etc.;

• extend life of existing mining enterprises;

• reduce area of degraded lands and accelerate their rehabilitation.

REFERENCES

1. Eremetov P.V. Justification of the scheme of stripping and development of the mine site "Shurapsky" with a combined (underground-open) method of coal mining. GIAB. 2009. S7, p. 85-92 (in Russian).

2. Mikhailov A.Yu., Varfolomeev E.L., Kassina O.V. Technological aspects of the transition from open to underground coal mining in Kuzbass. Vestnik Kuzbasskogo gosudarstvennogo tekhnicheskogo universiteta. 2005. N 4.1, p. 41-44 (in Russian).

3. Yalevskii V.D., Fedorin V.A., Anferov B.A., Varfolomeev E.L., Kassina O.V. Patent N 2285121 RF. Method for open-underground mining of a series of shallow coal formation. Publ. 10.10.2006. Bul. N 28 (in Russian).

4. Shakhmatov V.Ya., Fedorin V.A., Anferov B.A., Kuznetsova L.V., Mikhailov A.Yu. Patent N 2387836 RF. A method for open-pit coal mining using the infrastructure of an related mine. Publ. 27.04.2010. Bul. N 12 (in Russian).

5. Fedorin V.A., Shakhmatov V.Ya., Anferov B.A., Kuznetsova L.V. Patent N 2430236 RF. Method of combined coal deposit development. Publ. 27.09.2011. Bul. N 27 (in Russian).

6. Anferov B.A., Kuznetsova L.V. Patent N 2490454 RF. Method of open-underground mining of a thick steeply inclined coal formation. Publ. 20.08.2013. Bul. N 23 (in Russian).

7. Anferov B.A., Kuznetsova L.V., Fedorin V.A., Shakhmatov V.Ya. Patent N 2490455 RF. Method of open-underground mining of a shallow coal formation at the average thickness of the formation. Publ. 20.08.2013. Bul. N 23 (in Russian).

8. Anferov B.A., Kuznetsova L.V., Fedorin V.A., Shakhmatov V.Ya. Patent N 2490456 RF. Method of open-underground mining of a thick shallow coal formation. Publ. 20.08.2013. Bul. N 23 (in Russian).

9. Anferov B.A., Kuznetsova L.V. Patent N 2499129 RF. Method of open-underground mining of steep coal formation. Publ. 20.11.2013. Bul. N 32 (in Russian).

10. Anferov B.A., Kuznetsova L.V. Patent N 2513785 RF. Method of complex coal deposit development. Publ. 20.04.2014. Bul. N 11 (in Russian).

11. Anferov B.A., Kuznetsova L.V. Patent N 2651833 RF. Method of open-underground mining of a coal formation occurring in the form of brachisyncline. Publ. 24.04.2018. Bul. N 12 (in Russian).

12. Anferov B.A., Kuznetsova L.V. Patent N 2563895 RF. Method of open-underground mining of a series of steeply inclined coal formation. Publ. 27.09.2015. Bul. N 27 (in Russian).

13. Potapov V.P., Fedorin V.A., Kassina O.V. Modern geo-technological structure of Kuzbass coal mines.GIAB. 2006. Seminar N 15, p. 252-255 (in Russian).

14. Fedorin V.A., Mikhailov A.Yu., Ivershina G.E. Geo-technological aspects of open-underground (combined) method of coal deposits development in Kuzbass. GIAB. 2008. Seminar N 15, p. 261-269 (in Russian).

15. Fedorin V.A., Mikhailov A.Yu., Eremetov P.V. Combined geo-technology development of Kuzbass mineral resources. Ugol Kuzbassa. 2008. N 1, p. 70-73 (in Russian).

16. Shishkov R.I., Fedorin V.A. Concept of coal deposits development by combined method. Sbornik materialov XI Vseros-siiskoi nauchno-prakticheskoi konferentsii molodykh uchenykh "Rossiya Molodaya-2019". Kemerovo: KuzGGU, 2019, p. 1-3 (in Russian).

17. Shpanskii O.V., Ligotskii D.N., Borisov D.V. Design of open-pit mining boundaries. Sankt-Peterburgskii gosudarstvennyi gornyi institut. St. Petersburg, 2003, p. 90 (in Russian).

18. Naghadehi M., Jimenez R., KhaloKakaie R., Jalali S. A new open-pit mine slope instability index defined using the improved rock engineering systems approach. International Jounal of Rock Mechanics and Mining Sciences. 2013. Vol. 61, p. 1-14.

19. Islam M.R., Faruque M.O. Numerical modeling of slope stability consideration of an open-pit coalmine in the Phulbari coal basin. Electronic Journal of Geotechnical Engineering. 2012. Vol. 17, p. 3717-3729.

20. Little M.J. Slope Monitoring Strategy at PPRust Open Pit Operations. International Symposium on Stability of Rock Slopes in Open Pit Mining and Civil Engineering. The South African Institute of Mining and Metallurgy. 2006, p. 211-230.

21. Sainsbury D.P., Pierce M.E., Lorig L.J. Two- and three-dimensional numerical analysis of the interaction between open pit slope stability and remnant underground voids. 5th Large Open Pit Conference, Kalgoorlie, Western Australia. 2018, p. 251-257.

Authors: Roman I. Shishkov, Postgraduate Student, rshis@yandex.ru (Institute of Coal SB RAS, Kemerovo, Russia), Valerii A. Fedorin, Doctor of Engineering Sciences, Researcher, fva@kemsp.ru (Institute of Coal SB RAS, Kemerovo, Russia). The paper was received on 14 October, 2019. The paper was accepted for publication on 26 November, 2019.