Научная статья на тему 'ECONOMIC EVALUATION OF THE INTERNATIONAL KYZYL - URUMQI RAILWAY CONSTRUCTION PROJECT IN CONJUNCTION WITH THE ULUG-KHEM COAL BASIN DEVELOPMENT'

ECONOMIC EVALUATION OF THE INTERNATIONAL KYZYL - URUMQI RAILWAY CONSTRUCTION PROJECT IN CONJUNCTION WITH THE ULUG-KHEM COAL BASIN DEVELOPMENT Текст научной статьи по специальности «Экономика и бизнес»

CC BY
22
5
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
ЖЕЛЕЗНАЯ ДОРОГА / RAILWAY / ТУВА / TUVA / МОНГОЛИЯ / MONGOLIA / КИТАЙ / CHINA / УРУМЧИ / URUMQI / МИНЕРАЛЬНО-СЫРЬЕВЫЕ РЕСУРСЫ / MINERAL RESOURCES / КАМЕННЫЙ УГОЛЬ / COAL / ЭКСПОРТ / EXPORT / ОЦЕНКА / EVALUATION / ЭКОНОМИЧЕСКАЯ ЭФФЕКТИВНОСТЬ / COST-EFFECTIVENESS / БЮДЖЕТНАЯ ЭФФЕКТИВНОСТЬ / FISCAL EFFICIENCY / ПРОЕКТ / ГОСУДАРСТВЕННО-ЧАСТНОЕ ПАРТНЕРСТВО / PUBLIC-PRIVATE PARTNERSHIP PROJECT

Аннотация научной статьи по экономике и бизнесу, автор научной работы — Dabiev David F., Lebedev Vladimir I.

The present article demonstrates that construction of a railway through Tuva and Mongolia to China is an interesting and challenging problem from both economic and geopolitical points of view. Doubtlessly, the solution of this problem opens new opportunities for commercial and economic relations, including import and export of goods both to Mongolia and China and other cross-border countries of Central Asia. The authors remark that the greatest and the most profitable share of railroad cargo is coking coal exported to China, which in the last years has been facing a huge deficit for utilization of its metallurgical plants’ capacities. Should the international railway be constructed along Kyzyl - Ulangom - Hovd - Urumqi, almost all large and medium South Siberian deposits will be highly demanded on both domestic and international mineral product markets. The research leads us to the conclusion that the optimal option for Russia China and Mongolia would be a tripartite international treaty, on the basis of which the budgets of the party states finance up to 50% of capital costs provided in the estimate for the Kyzyl - Urumqi construction as per shares stipulated in the treaty, while private investors provide the rest.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Экономическая оценка проекта строительства международной железной дороги Кызыл - Урумчи в увязке с освоением Улуг-Хемского каменноугольного бассейна

Показано, что строительство железной дороги через Туву и Монголию в Китай - это одна из сложных и интересных проблем как с экономической, так и с геополитической точки зрения. Безусловно, в результате решения этой проблемы откроются новые возможности торговых и экономических отношений, в том числе для ввоза и вывоза товаров не только в Монголию и Китай, но и другие трансграничные страны Центральной Азии. Укажем здесь, что наиболее весомым и рентабельным в грузопотоке железной дороги, вероятнее всего, станет вывоз коксующегося угля в Китай, который в последние годы испытывает огромный дефицит для загрузки мощностей своих металлургических заводов. В том случае, если международная железная дорога будет построена по трассе Кызыл - Улангом - Ховд - Урумчи, практически все крупные и средние месторождения регионов Южной Сибири будут востребованы на рынках минеральной продукции как в России, так и за рубежом. В результате проведенного анализа оптимальным представляется вариант, при котором на основе трехстороннего международного договора между Россией, Китаем и Монголией за счет государственных средств вышеуказанных стран на долях, предусмотренных данным договором, финансируется 50 % капитальных затрат, утвержденных сметой на строительство железной дороги по трассе Кызыл - Урумчи, а частные инвесторы - остальную часть.

Текст научной работы на тему «ECONOMIC EVALUATION OF THE INTERNATIONAL KYZYL - URUMQI RAILWAY CONSTRUCTION PROJECT IN CONJUNCTION WITH THE ULUG-KHEM COAL BASIN DEVELOPMENT»

Journal of Siberian Federal University. Humanities & Social Sciences 12 (2016 9) 2917-2927

УДК 332.025.12+332.330.15

Economic Evaluation of the International Kyzyl - Urumqi Railway Construction Project in Conjunction with the Ulug-Khem Coal Basin Development

David F. Dabiev and Vladimir I. Lebedev*

Tuva Institute for Exploration of Natural Resources of the SB RAS

117a Internatsionalnaya Str., Kyzyl, Tyva Republic, 667007, Russian Federation

Received 06.10.15, received in revised form 18.04.16 accepted 25.09.16

The present article demonstrates that construction of a railway through Tuva and Mongolia to China is an interesting and challenging problem from both economic and geopolitical points of view. Doubtlessly, the solution of this problem opens new opportunities for commercial and economic relations, including import and export of goods both to Mongolia and China and other cross-border countries of Central Asia. The authors remark that the greatest and the most profitable share of railroad cargo is coking coal exported to China, which in the last years has been facing a huge deficit for utilization of its metallurgical plants' capacities. Should the international railway be constructed along Kyzyl - Ulangom - Hovd - Urumqi, almost all large and medium South Siberian deposits will be highly demanded on both domestic and international mineral product markets. The research leads us to the conclusion that the optimal option for Russia China and Mongolia would be a tripartite international treaty, on the basis of which the budgets of the party states finance up to 50% of capital costs provided in the estimate for the Kyzyl - Urumqi construction as per shares stipulated in the treaty, while private investors provide the rest.

Keywords: Railway, Tuva, Mongolia, China, Urumqi, mineral resources, coal, export, evaluation, cost-effectiveness, fiscal efficiency, public-private partnership project.

DOI: 10.17516/1997-13 70-2016-9-12-2917-2927.

Research area: economics.

The mineral resources of the Republic of Tuva are comparable with the those of the richest territories of the Siberian Federal District, such as the Krasnoyarsk Territory (Krai), Kemerovo and Tomsk Oblasts; however, concerning social and economic development, Tuva still lags behind. Significant deposits of coking and power

generating coal, cobalt, gold, non-ferrous and rare metals, rare earth elements, various construction materials, mineral and sweet underground waters, geothermal sources have been found in its territory. The cumulative value of the mineral deposits found in Tuva (with the deduction of their extraction and processing costs), as evaluated

© Siberian Federal University. All rights reserved

* Corresponding author E-mail address: [email protected], [email protected]

- 2917 -

by Tuva Institute of Comprehensive Natural Resources Development of the SB of the RAS (TuvICNRD SB RAS), exceeds 4 140 billion US dollars (Lebedev, Kuzhuget, 1998).

However, due to poor transport infrastructure and hard access to the majority of the deposits located in the forest and taiga areas remote from transport communication, they are extremely underdeveloped. In point of fact, Tuva is cut off the main throughways, so in the post-reformation years its mineral resources have been developed only on the private entrepreneurship scale. Despite the few social and economic advantages of such development, transport inaccessibility of the key resource deposits decrease of their competitive ability on the domestic and international markets. At the same time, environmental damage caused by this development and poor geological and economic feasibility study exceeded the tax proceeds. Such factors as underdevelopment and depressiveness of the region, absence of railway communication with other regions, low competitive ability of the produced goods increase investment risks of the region. Therefore, the absence of investments prevent modernization of the outmoded funds of the Republic, which result in poor competitive ability of the exported raw material. In the 1990-s, the volume of investments into the Republic fell by over 20 times in comparison with that of the year 1990. It was only in the early 21st century when investments began to grow, though by the year 2008 the investment volume had only reached 3 261 million Russian roubles (Dabiev et al., 2010). Despite the positive tendencies, the main problems are: high wear degree of the main funds, significant decrease of investment into the real sector of economy, low share of private companies' investments etc. Private investors do not keenly contribute their capital (even at the level of 12-15% of the project

cost) into risky deals. It is proven by Kyzyl -Kuragino railway construction project, which was included into the state register and financed from the Investment Foundation of the Russian Federation (by 50%, while the rest was provided by private businesses). Due to the bankruptcy of its private partner, the construction was put off from 2010 to 2011, but was actually resumed only as late as 2013. However, this railway could have dramatically changed the social and economic situation in Tuva, as it could provide it with the railway access to the Kuzbass and the Trans-Siberian railway!

By the year 2006 some scientists of the Siberian Branch ofthe RAS, including TuvICNRD SB RAS, had developed a series of innovative mineral processing technologies. Moreover, TuvICNRD SB RAS had developed technical and economic feasibility studies for several republic infrastructure projects. These achievements changed the attitude of private investors to the mineral wealth of the Republic. Recently, their interest to the local deposits have dramatically increased; in 2006, Chinese Longxing Company purchased a license for the development of Kyzyl-Tashtyg lead and zinc deposit, in 2007 OJSC GMK Norilsk Nickel purchased a license for survey and extraction of copper, molybdenum, and associated components at Ak-Sug copper-porphyry deposit. In 2009, Kaa-Khem coal deposit was sold to En+Development Company. Indeed, it was greatly aided by the announcement of Kyzyl-Kuragino railway project' commissioning in 2016 (Oiun, 2014). Today, there are the following mining industries in the Republic: TuvaAsbest mining and processing works with the design capacity of 120 thousand tons of textile chrysotile asbestos; Kaa-Khem and Chadaan coal deposits with the design extraction volume over 1.5 million tons; a series of gold mining enterprises selling over 1.8 tons of gold per year for around 1.7 billion US dollars etc.

Under market conditions, federal budget funds cannot be the only source of financing innovations in the region. Nevertheless, the significant proceeds to the Republic from federal budget funds serve as a signal for the private companies of the reasonability of large investment projects in the territory and irreversibility of the national innovative policy. To participate into the investment projects which may considerably increase the local economic potential, private Russian companies normally prefer to wait for the establishment of large national programs of social and economic development in a certain region and resolution of target financing of the region from the federal budget.

The Tuva Republic socioeconomic development strategy to the year 2020 assumes (Strategiia..., 2008) that the main competitive advantages of the Republic are associated with mining, wood processing and agricultural products processing industries, construction materials production, recreation and tourism facilities. However, developed mineral deposits are the only item on the list which has a huge potential to lead the Republic away from beneficiary regions category. That is why, to our mind, it is the mining industry that should serve as a "growth engine". Though developing at a higher socioeconomic and technological level, other economic branches may be auxiliary, while the Republic will receive great budget proceeds from mining industry. However, raw material development strategy cannot be supported only with innovative development of extraction branches on the basis of the new technologies suggested by the scientists with due regard to traditions, values and rules of the ethnicities populating the region. It cannot develop without new infrastructure projects which are expected to provide transportation access to other regions of Russia and abroad.

Construction of a railway to China via Tuva and Mongolia is a challenging and interesting

problem from both economic and geopolitical points of view. Doubtlessly, the solution of this problem opens new opportunities for commercial and economic relations, including import and export of goods both to Mongolia and China and other cross-border countries of Central Asia.

We should remark that along with that, the opportunity of exporting such raw materials as hard coal, metal concentrates, gold etc. from Tuva will gain the greatest interest. The continue of the railway construction will open great opportunities for the mining industry development in Tuva and Southern parts of the Krasnoyarsk Territory (Krai), Khakassia and Altai, considering that these territories of the Russian Federation possess both developed and underdeveloped mineral deposits, requiring detailed exploration and additional geological survey.

Obviously, should the railway construction be carried this way, the scope of exporting minerals and other raw materials through Kyzyl -Urumqi track would not decrease, as the cargo traffic would mostly consist of coking coal from Elegest, Mezhegey deposits and other hard coal deposits of the Ulug-Khem Basin.

A typical peculiarity of coal export is geographic diversity of supplies, when a half of the coal is exported to Europe, while the other half goes to Asia-Pacific Region. Along with that, low traffic capacity of railways and ports restricts coal production and export in the country (Kichanov, 2013). That is why the issue of constructing additional railways, that would relieve cargo traffic and play an important role in transport and geopolitical strategy of the country, is so acute today.

Let us also remark that the greatest and the most profitable share of railroad cargo is likely to be coking coal exported to China, which in the last years has been facing a huge deficit forutilization of its metallurgical plants' capacities. One of the alternative options of Tuva-Mongolia railway

construction is Kyzyl - Chadana - Khandagayty -Ulangom - Hovd - Urumqi. Consequently, one ofthe basicproductsto be e:q>ortedby Kyzyl-Chadam- KZbndagayty- Ulayg-m-Hbbd -Urumqi railway is hard coal of the Ulug-Khem Bas'n, t^r^o o-t^isa^t^zde^S haM sod deposits sf Rustia. ff is dzteryaned b> Oheiowtonbdgebfnon-ferrous metals, rare metals and rare earth elements' concentrates, while cement, construction materials -sd othar— inurrt-roccseing ar^aer^^ ore—ost l^tety^c^ c^oo^sOitateb^ noia^ordado^f d^f^^^c^tel CCORO traffic in relation to coal (Fig. 1).

gbf .oust, sha-Mtheraihva- -amOrac-ion be ca-rie-thio woy, -he rcope odex-orti-b minerals and other raw materials through Kygyl-Ur-mqi Osackwotldoot deare^^it, t-cargo traffic would mostly consist of coking coal from Elegest, and, perhaps, Mezhegey deposits.

Let us also remark that the greatest and s,e mo-tpcotiioble shtrz of saiOr-a- carcs -likely to be coking coal exported to China, which in the last years has been facing a huge daf^c;k forbSiHzatwnoftismetdhifgiyaldaiits' ^t^ppcit—o.(dr^ii-^gti^it ^t^^o^j^^-i^e aytiont sf Tuva-Mongolia railway construction is Kyzyl -Chadana - Khandagayty - Ulangom - Hovd -Urumqi. Consequently, one of the basic products

to be exported through Kyzyl - Chadana -Khandagayty - Ulangom - Hovd - Urumqi b-lwa-itihehardcoplef tOo UlggiK-em Basin, one crogagtraiost herd coal Uenoslts «^dRbis^tyh is determined by the low tonnage of non-ferrous, -aremetokand rare eo-- ekmenSs'conpentrales, RMacrmeni, zobsrn:lctionmofsriafs anaoiher mineral processing products are most likely to constitute the minor part of the total cargo traffic ar rolationtocoal.

tol^p-ldth^i^K^p^^bbe cobtOsuc-ed olon-Kyzyl - Ulangom - Urumqi track, almost all large p-d dediym^poshsareUkul- tohfdam-nded on minsralhtodbst marke-a d^A inRussia-nd abroad.

Is our opirnun, m shir cera tte foUuwkg mineral deposits of the Republic would be the most demanded: hard coal deposits of the Ulug-Khem Basin, deposits of non-ferrous metals, rare me-alr ar^^a^^^eartd tlzmonts,asbesSoh construction materials, gold ore etc.

Feasibility study for the construction of Ky^l -Urumq^a^ay igoontuectiaywi-h Uiug-Khem-ard auoidasm devek)pmelit ilboton on the following conditions:

1. According to "Methodological recommendations for technical and economic

Fig. 1

- 2920 -

feasibility studies of conditions for hard mineral deposit development (except for coals and oil shales)", the main criterion for fiscalevaluation of a mineral deposit is net present value, or NPV. NPV is calculated by subtracting the initial investments (capital investments) from the aggregate present values of cash inflows in compliance with the selected (discount) rate according to the formula:

1=1

where К0 ia tie irntiai capital inve stment vahte; R is cash in/lows from investmanls duriaig pie:riiiil i; Ci is expenses resulting from the project during period /'; r is dis>court raee; T is evaluation period in years.

If NPV calculated with the foregoing formula ia po sitiha, it means that w/thln the considered time perind T /he dp/tat invepteO inSo teposit davolmpmeot will bo /ompensaie s^ ;at^d the inpo sit Sevolopment project will be deemed efficient. The higher Uteoe sito moor efficient the projectis.

Negative NPV means that the selected profit valee is not teoeinnd, amU deposit eoveloemont modeopresani conditians wiil neunprotltnO/e. WO/n NPV equals fn zero, ft means thai She project comeens/tsa the eapilal expsnsen, though i^o^s nmt boing any nrofis.

When a deposit development assumes more than single-time investment Ko, but subsequent financial investments during several periods, the NPV formula istransformed as follows:

npv= -¿k ta+ce' +¿00 -c,.e/(i = o'

1=0 t=l

where Ki is the amount of capital invested into depositdevelopment duringperiod i.

It is important to note that net present value is an additive criterion, i.e. if the object is divided

into separate parts, its NPV equals to the sum of NPVs of its components.

NPV characterizes the excess of aggregate cash inflows over the aggregate expenses, considering the discount rate as well as such factors as the creditor's minimum rate of return and the project's adjustment for risk. Positive NPV is the essential condition of deposit development efficiency.

Deposit evaluation involves the following indicators used in NPV calculation: payback period, internal rate of return, and profitability index.

2. Taxation. Financial and economic feasibility study of Kyzyl - Urumqi railway construction in conjunction with Ulug-Khem hard coal basin includes standard taxes foreseen by the Tax Code of the Russian Federation: company income tax, unified social tax, property tax, mineral extraction tax, payments for the use ofwater,landandother resources.

3. Input data (mine development metho d, loss and ore dilution factors, mining enterprise productivity, operating and capital costs, goods quality) for the studied objects were adopted from technical and economic feasibility studies and reports previously made by specialized organizations, applying the ivalues to the scurrent situation with the conversion deflator coefficients (Shabalinskiy, 2006). For calculations for the deposits with previously evaluated mineral resources, analog method may be used. It may also involve data

ton specific operating costs and specific capital expenditure for analog objects.

4. Discount rate is assumed as 15%.

5. Timehorizonis25 years.

6. Cut-off grade is 0.4%

7. Calculations for the economic feasibility study of the Republic of Tuva mineral deposits idevelopment aare made in MS Excel software.

8. The calculations are based on the mineral raw materials and products' prices as of July 1, 2014.

9. Basic conditions for capital expenditure calculations. According to the calculations, the capital expenditures of the project are evaluated as 560.8 million roubles including Kyzyl - Urumqi railway construction costs of 425.5 million roubles, Ulug-Khem Basin coal deposit mining and processing works construction costs of 88.39 million roubles (Table 1, 2).

10. Prices. The calculations were based on the following prices for mineral raw materials and products (Table 3):

11. Ulug-Khem hard coal basin coking coal extraction volume at the design capacity (Table 4)

Fiscal efficiency analysis (provisional data). Provisional calculations for the project have been made in two variants:

1. All capital expenditures for mining and processing works construction and Kyzyl -Urumqi railway construction are covered by

Table 1. Yearly capital expenditures for the commercial option, million roubles

1 2 3 4 5

Including capital 560 890.0 108 178.0 108 178.0 108 178.0 108 178.0 108 178.0

Railway construction 452 500.0 90 500.0 90 500.0 90 500.0 90 500.0 90 500.0

Kyzyl - Urumqi railway construction 452 500.0 90 500.0 90 500.0 90 500.0 90 500.0 90 500.0

Mining and processing works construction 88 390.0 17 678.0 17 678.0 17 678.0 17 678.0 17 678.0

Mezhegeysk deposit 33 070.0 6 614.0 6 614.0 6 614.0 6 614.0 6 614.0

For Vostochny area of the Ulug-Khem Basin 27 660.0 5 532.0 5 532.0 5 532.0 5 532.0 5 532.0

For Tsentralny area of the Ulug-Khem Basin 27 660.0 5 532.0 5 532.0 5 532.0 5 532.0 5 532.0

Table 2. Yearly capital expenditures for public and private business partnership, million roubles

1 2 3 4 5

Including capital 334 640.0 62 928.0 62 928.0 62 928.0 62 928.0 62 928.0

Railway construction 226 250.0 45 250.0 45 250.0 45 250.0 45 250.0 45 250.0

Kyzyl - Urumqi railway construction 226 250.0 45 250.0 45 250.0 45 250.0 45 250.0 45 250.0

Mining and processing works construction 88 390.0 17 678.0 17 678.0 17 678.0 17 678.0 17 678.0

Mezhegeysk deposit 33 070.0 6 614.0 6 614.0 6 614.0 6 614.0 6 614.0

For Vostochny area of the Ulug-Khem Basin 27 660.0 5 532.0 5 532.0 5 532.0 5 532.0 5 532.0

For Tsentralny area of the Ulug-Khem Basin 27 660.0 5 532.0 5 532.0 5 532.0 5 532.0 5 532.0

- 2922 -

Table 3. Coking coal prices assumed for calculation

Measurement unit Price

Coking coal roubles/ton 4 560

Coking coal dollars/ton 120

Table 4. Ulug-Khem hard coal basin coking coal extraction volume at the design capacity

Extraction volume, million tones 32.0

Mezhegeysk deposit 12.0

For Vostochny area of the Ulug-Khem Basin 10.0

For Tsentralny area of the Ulug-Khem Basin 10.0

private investors only. The result is unprofitable for the private investor (NPV<0; profitability index -0.65, IRR - 9.6%). (commercial option)

2. Upon financing of 50% of the Kyzyl -Urumqi railway construction estimated costs from the state budget, the rest of capital expenditures will be provided by investors (public and private business partnership option) Net present value of the investor 9.2 billion roubles

Non-discounted project payback period - 9.66 years

Discounted project payback period - 21.45 years Internal rate of return (IRR) 15.6% Efficiency for budget

Net present value of consolidated budget is 92 981.9 billion roubles

Selling price determination. Siberia occupies a special place concerning both main coal deposit location and coal extraction. The major part of coal resources is located at the Kuzbass, which concentrates over a half of all coal, and 80% of extracted coking coal. Significant role in coal extraction is also played by such regions as: the Krasnoyarsk Territory (Krai), the Republic of Khakassia, Irkutsk Oblast, the Republic of Komi and Sakha.

If until mid-2000-s the country experienced a great growth of coking coal extraction, from 2007 to 2012 coking coal extraction decreased due to the worsening market situation with the increase in other coal grades' extraction. As of 2011, the volume of coal extracted in the Kuznetsk Coal Basin was 192.1 million tons, including 48.8 million tons of coking coal.

Even though by the end of the first half of 2013 metallurgical coal import in Asian countries grew by 34% in comparison with the similar period of the last year, by the mid-2013 Australian coal prices fell to 130-135 US dollars/ ton, while in Canadian and American markets the prices dropped to 120-125 dollars/ton. The coking coal price drop was caused by the growth of cheap low-grade material on regional markets, decreasing prices for the high-quality coking coal grades (Koksuiuschiysia, 2013).

Coking coal price drop could not but affect financial indicators oflarge coal extracting companies. For example, the results of the third quarter of 2012 of OJSC UK Raspadskaya demonstrated significant fall both in coal extraction and sales of concentrates, associated with forced reduction of process utilization (Raspadskaia2014).

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

As of August 2014, coking coal prices were at the level of 120 dollars per ton (Neobkhodimo..., 2013).

Table 5. Coal extraction in the main coal basins of Russia [9]

Coal basins 2009 2011

Kansk-Achinsk (the Krasnoyarsk Territory (Krai), Kemerovo Oblast) 37.0 40.3

Kuznetsk (Kemerovo Oblast) 157.5 166.4

Irkutsk (Irkutsk Oblast) 9.5 11.9

Pechersk (the Republic of Komi) 9.1 10.3

Donetsk (Rostov Oblast) 3.5 3.6

Yuzhno-Yakutsk (the Republic of Sakha) 6.1 9.0

Minusinsk (the Republic of Khakassia) 9.8 12.4

Table 6. Incomes to the consolidated budget of the Republic of Tuva [12] (in actual prices; million roubles)

2013

Incomes, including 24 275.7

Intrinsic incomes 4 476.9

Uncompensated receipts 19 798.8

Socioeconomic efficiency evaluation

The calculation reveals that Kyzyl - Urumqi railway construction in conjunction with the Ulug-Khem Basin coal development may significantly raise the regional economy.

Annual tax proceeds to the Federal budget from the current project after achievement of its design capacity will constitute 8 599.9 million roubles. Annual tax proceeds to the Republic budget from the current project after achievement of its design capacity will constitute, averagely, 20 666.0 million roubles, which is 4.6 times higher than budget proceeds in 2013.

We should also consider indirect incomes of the republic budget. According to the method proposed by Professor A.A. Arbatov (Council for the Study of Productive Forces), additional incomes to the Tuva budget caused by large-scale projects are evaluated as 1.8 (Biznes-plan..., 2006).

Therefore, intrinsic earnings gain of the Tuva Budget with the Kyzyl - Urumqi railway construction in conjunction with the Ulug-Khem Basin development will exceed 60 billion roubles.

As of 2013, the incomes to the consolidated budget of the Republic of Tuva counted up to 24 275.7 million roubles, 81.6% of which consisted of uncompensated receipts from the federal centre (Table 6).

Besides, annual GNP growth will constitute 118 960.1 million roubles. As, according to Iagol'nitser M.A. (Institute of Economy and Industrial Production Management of the Siberian Branch of RAS), production increase multiplicator for mineral mining industries constituted 6.91, i.e. at the expansion of mineral mining production by 1 rouble the gross product with regard to interbranch influence grew by 6.91 roubles, and we may say that GRP for the Republic with regard to the present project and 6.91 of adjacent branches development will constitute 822 014.3 million roubles.

We should notice that as of November 2012 there were over 22 thousand unemployed in the Republic, which is 18.3% of economically active population. Let us also remark that every vacancy in mineral extraction branch creates, averagely,

three additional vacancies in adjacent branches. Considering that the project coal deposit development assumes creation of over 6 171 new vacancies, the potential number of new jobs may exceed 18 thousand considering the demand for new employees in adjacent branches.

Thus, the Kyzyl - Urumqi railway construction project in conjunction with the Ulug-Khem coal basin development is not just

commercially efficient for investors; it bears great budget and social profit.

Further calculations concerning Kyzyl -Urumqirailwayconstructionprojectinconjunction with the Ulug-Khem coal basin development may be performed after coordination of the general capital expenditures with the investor and conclusion of a tripartite international treaty between Russia, China and Mongolia.

References

Biznes-plan investitsionnogoproekta "Stroitel'stvo zheleznoy dorogipo trasse Kyzyl-Kuragino v uviazke s osvoeniem mineral 'no-syr 'evoy bazy Respubliki Tyva" [Business plan for "Kyzyl - Kuragino railway construction in conjunction with the Republic of Tuva mineral resources development" investment project] / Moscow, Council for the Study of Productive Forces, 2006.

Dabiev, D.F., Damdyn, O.S., Lebedev, V.I. (2010)Analizinvestitsionnoy deiatel 'nosti v Tyve [Tuva investment activity analysis], In Problemy sovremennoy ekonomiki. Evraziyskiy mezhdunarodnyy nauchno-analiticheskiy zhurnal [Modern economic problems. Eurasian international scientific and analytic journal], 3(35), P. 335-339.

Lebedev, V.I., Kuzhuget, K.S. (1998)Mineral 'no-syr 'evoy potentsial Respubliki Tyva: vozmozhnosti ego ispol 'zovaniia v 1999-2001 gg. i perspektivy dal 'neyshego osvoeniia [Mineral potential of the Republic of Tuve: utilization potential for the years 1999-2001 and further development prospects]. Kyzy: Tuvan Institute of Comprehensive Natural Resources Development of SB RAS, preprint No.3, 35 p.

Kichanov, M. (2013) Ugol 'nyyperegruz [Coal Overload], In Expert Sibir' [Expert Siberia], 4(360), 28.01.2013.

Koksuiuschiysia ugol' ottolknulsia ot dna [Coking coal pushed up from the bottom] Available at: http://mineral.ru/News/53847.html (accessed 14 October 2013)

Neobkhodimo prodolzhit' sokraschednie ugol'nykh moschnostey v mire - gendirektor Teck Resources [World coal capacities need to decline - General Director of Teck Resources] Available at: http://www.mineral.ru/News/62938.htmll (accessed 14 October 2013)

Oiun, D. (2014) Glava Tuvy vystupil s ezhegodnym poslaniem Parlamentu [Head of Tyva have his annual address to the Parliament] Available at: http://www.tuvaonline.ru/2007/07/18/4759_poslanie. html (accessed 5 October 2014)

Raspadskaia: Rezul'taty ugol'noy kompannii za 3 kvartal 2012 g. okazalis' neozhidanno slabymi i razocharovali investorov [Raspadskaya: Unexpectedly low coal company performance for the 3rd quarter 2012 disappointed investors], In: Izvestiia metallurgii [Metal press] Available at: http:// MetallPress.ru (accessed 5 October 2014)

Sostoianie MSB ugley Rossiyskoy Federatsii na 2012 g, mlrd.t. [Russian Federation coal reserve base condition for the year 2012, in billion tons] Available at: https://www.google.ru/search?q=%D 1%81%D0%BE%D1%81%D1%82%D0%BE%D1%8F%D0%BD%D0%B8%D0%B5+%D0%BC%D1 %81%D0%B1+%D1%83%D0%B3%D0%BB%D0%B5%D0%B9&oq=%D1%81%D0%BE%D1%81%

- 2925 -

D1%82%D0%BE%D1%8F%D0%BD%D0%B8%D0%B5+%D0%BC%D1%81%D0%B1+%D1%83% D0%B3%D0%BB%D0%B5%D0%B9&aqs=chrome..69i57.10394j0&sourceid=chrome&espvd=210& es_sm=122&ie=UTF-8 (accessed 5 October 2014)

Strategiia sotsial 'no-ekonomicheskogo razvitiia Respubliki Tyva do 2020 g. Postanovlenie ot 21 fevralia 2008 g. No. 91 g. Kyzyla [Socioeconomic development strategy of the Republic of Tuva to the year 2020. Resolution No. 91 of February 21, 2008, city of Kyzyl].

Shabalinskiy, A.B. (2006) TED promyshlennogo osvoeniia Elegestinskogo mestorozhdeniia kamennykh ugley Ulug-Khemskogo uglenosnogo basseyna i vremennykh konditsiy [Technical and economic feasibility report for industrial development of Elegestinsk hard coal deposit of Ulug-Khem coal basin and temporary conditions], Kyzyl, Territorial Geological Information Fund in the Republic of Tuva, No. 2478

Konsolidirovannyy biudzhet Respubliki Tyva [Consolidated budget of the Republic of Tuva] Available at: http://tuvastat.gks.ru/wps/wcm/connect/rosstat_ts/tuvastat/resources/6df10280448e68 13b8e0fd20d5236cbc/%D0%9A%D0%9E%D0%9D%D0%A1%D0%9E%D0%9B%D0%98%D0% 94%D0%98%D0%A0%D0%9E%D0%92%D0%90%D0%9D%D0%9D%D0%AB%D0%99+%D0 %91%D0%AE%D0%94%D0%96%D0%95%D0%A2+%D0%A0%D0%95%D0%A1%D0%9F%D0 %A3%D0%91%D0%9B%D0%98%D0%9A%D0%98+%D0%A2%D0%AB%D0%92%D0%90.htm (accessed 5 October 2014)

Экономическая оценка проекта строительства международной железной дороги Кызыл - Урумчи в увязке с освоением Улуг-Хемского каменноугольного бассейна

Д.Ф. Дабиев, В.И. Лебедев

Тувинский институт комплексного освоения природных ресурсов СО РАН Российская Федерация, 667007, Республика Тыва Кызыл, ул. Интернациональная, 117а

Показано, что строительство железной дороги через Туву и Монголию в Китай - это одна из сложных и интересных проблем как с экономической, так и с геополитической точки зрения. Безусловно, в результате решения этой проблемы откроются новые возможности торговых и экономических отношений, в том числе для ввоза и вывоза товаров не только в Монголию и Китай, но и другие трансграничные страны Центральной Азии. Укажем здесь, что наиболее весомым и рентабельным в грузопотоке железной дороги, вероятнее всего, станет вывоз коксующегося угля в Китай, который в последние годы испытывает огромный дефицит для загрузки мощностей своих металлургических заводов. В том случае, если международная железная дорога будет построена по трассе Кызыл - Улангом - Ховд - Урумчи, практически все крупные и средние месторождения регионов Южной Сибири будут востребованы на рынках

- 2926 -

минеральной продукции как в России, так и за рубежом. В результате проведенного анализа оптимальным представляется вариант, при котором на основе трехстороннего международного договора между Россией, Китаем и Монголией за счет государственных средств вышеуказанных стран на долях, предусмотренных данным договором, финансируется 50 % капитальных затрат, утвержденных сметой на строительство железной дороги по трассе Кызыл - Урумчи, а частные инвесторы - остальную часть.

Ключевые слова: железная дорога, Тува, Монголия, Китай, Урумчи, минерально-сырьевые ресурсы, каменный уголь, экспорт, оценка, экономическая эффективность, бюджетная эффективность, государственно-частное партнерство, проект.

Научная специальность: 08.00.00 - экономические науки.

i Надоели баннеры? Вы всегда можете отключить рекламу.