DISCRETE INVERSE GAMMA DISTRIBUTION BASED LOAD-SHARE MODEL WITH APPLICATION
Rachna Srivastava, Pramendra Singh Pundir
•
Department of Statistics, University of Allahabad, Prayagraj, 211002,
U.P., India
[email protected], [email protected]
Abstract
In reliability engineering, the multi-component load-sharing models are being used to amplify system's reliability. This study consists of the k-component load-sharing parallel system model considering each component's failure time distribution as discrete inverse gamma. The classical and Bayesian analysis for this model is performed. The maximum likelihood estimates along with their standard errors for the parameters, system's reliability function, hazard rate function and reversed second rate of failure function are obtained. The asymptotic confidence intervals as well as two bootstrap intervals like bootstrap-p and bootstrap-t confidence intervals are constructed. Further, Bayes estimates along with their posterior standard errors and highest posterior density credible intervals for the parameters and system's reliability characteristics are obtained by using Markov Chain Monte Carlo techniques. A detailed simulation table is formed to demonstrate the effectiveness of the theory developed. Finally, a real data set is used to illustrate the applicability of the model.
Keywords: Load-share system model, Discrete inverse gamma distribution, Bootstrapping, Bayesian estimation, MCMC technique
1. Introduction
In today's engineering world, the products with high reliability are in demand. It can be accomplished with planned maintenance, improving components' reliabilities, reassignment of components etc. In this regard, manufacturers usually use redundancy techniques. While using redundancy techniques, it is assumed that the components within the system are performing independently. However, in practice, many multi-component systems work as load-sharing model which leads the independence assumption to be not valid any more. In load-sharing model (or dynamic system model), on a component's failure, the workload will be redistributed to the other working components, which imparts increased load on them. Originally, Daniels [1] developed the first load-sharing design to study textile strength.
In last two decades, various authors have discussed load-share modeling and estimated its parameters in different contextual aspects. Kim and Kvam [3] considered equal load-share rule for estimating the load-share parameters of multi-component system in parametric setup with failure time distribution as exponential. Singh et al. [12]
performed the classical and Bayesian inference for multi-component load-share system by assuming that the components have a combination of constant and linear failure rates. Park [5, 6] performed the classical and Bayesian inference for such models by assuming the underlying lifetime distribution as exponential or Weibull.
There are various real examples where load-share modeling can be used such as in mechanical and civil engineering for welded joints (enhances the stress on other joints), in textile engineering and materials science for crack growth induced by fatigue or material degradation (bigger cracks will grow faster than smaller cracks), in a power plant for electric generators (electrical load is shared), in a human body for two kidneys (simultaneously work together) and so forth.
There are some basic continuous lifetime distributions such as exponential, Weibull, Lindley and log-normal, which have been explored for analyzing load-share models. Some distributions are recently been used for this purpose like Chen, modified Weibull, and exponentiated Pareto distributions which are discussed by Pundir and Gupta [7], Singh and Goel [11] and Zhang et al. [16], respectively. However, there are various situations in which discrete distributions can perform well like number of shocks, number of patients in a ward, etc. Singh et al. [13] have dealt with discrete load-share modeling situation using geometric distribution.
Considering this, a load-share system model is developed and analyzed with discrete inverse gamma distribution (DIGD) in the present work. Hussain and Ahmad [2] obtained DIGD by discretizing the inverse gamma distribution (IGD). Its cumulative distribution function (CDF), reliability function, probability mass function (PMF), hazard rate function (HRF) and reversed second rate of failure (RSRF) are, respectively,
7 1 1 r(a, px)
F(x) = J fo^y e-Pdy ="7(0" ; X = 0,1,...; a > 0' P > 0
1/x
7 y
where r(a, px) = / paya-1 e-pdy and r represents the upper incomplete gamma func-
1/x
tion,
/X 1 1 y Y(a, px) R(x) = 1 - F(x) = J —)— y e-p dy = ; x = 0,1,...; a > 0, p > 0
0
1/x _y
where y(a, px) = / -paya-1 e p dy and 7 represents the lower incomplete gamma func-
p 0
tion,
1/x
P[X = x] = p(x) = R(x) - R(x + 1) = J ya-1e-y/pdy
1/(x+1)
= ^;x = 0,1,...;a > 0,P > 0 (1)
where Y(a, px, p^) = Ha, P*) - Ha, P^),
h(x) = PM = T(a, ipx, (2)
h(x) = R(x)= Y(a, Px) (2)
and
h2 (x) = log
F(x)
F(x - T)
log
r(a ex ) Lr(a, e(x-t))J
where, a and ft are shape and scale parameters.
Pundir et al. [8] obtained its reversed second rate of failure (RSRF) function and discussed its usefulness. They also discussed the classical and Bayesian inference methods for DIGD. DIGD can be applied to various applications where IGD is being used like in radar detection by Shang and Song [10], Stinco et al. [14] and in fading modeling by Yoo et al. [15], Ramirez-Epi'nosa and Lopez-Martinez [9], etc.
The current study deals with constructing a load-share parallel system model where the lifetime distribution of each component is considered as DIGD. In section 2, model description is presented. The reliability characteristics of the system are derived under section 3. In section 4, maximum likelihood (ML) estimation, bootstrapping and Bayesian estimation techniques are applied to obtain the estimates along with standard errors (SEs)/ posterior standard errors (PSEs) and confidence intervals (CIs)/ highest posterior density (HPD) credible intervals of the parameters and reliability characteristics of the load-share system model. Bayesian estimation is applied under informative as well as non-informative priors by using Markov Chain Monte Carlo (MCMC) techniques such as Gibbs sampler and Metropolis-Hastings (MH) algorithm. A simulation study is performed to compare the discussed estimation techniques and the results are given under section 5. Section 6 demonstrates the applicability of the proposed model to real data set. Finally, the article is concluded exhibiting some concluding remarks in section 7.
2. Model Description
A load-sharing system is modeled and analyzed under the following assumptions:
• A load-sharing system containing k-components is bearing a constant load which is equally shared by all its components.
• A test is prepared to record the failure times of n such i.i.d. parallel systems.
• Let Tij (i = 1,2,..., n; j = 1,2,..., k) be the failure time spacing between (j — 1)th and jth components in the ith parallel system.
• On the successive failures of the components within the system, the load imposed on other remaining surviving components increases.
• The hazard rate of a remaining surviving component varies when the sharing load changes.
• The failure time distribution of each component in the system is independent.
• Initially, the hazard rate of each of the k-components is denoted by h(t; a, When the first component fails, the hazard rate of the remaining (k — 1) components changes to h(t; a, ft2) and so on. After the (k — 1)th component failure, the hazard rate of the last surviving component changes to h(t; a, ftk).
• Each component is pertaining a failure time PMF and HRF given in equations (1) and (2), respectively.
Taking these assumptions into consideration, the hazard rate of the jth component when (j — 1) components have already failed is
h(tj) = (k — j + 1)h(tij;a,ft) ;i = 1,2,...,n;j = 1,2,...,k
= (k - j + T)
^ jj, e (4+t))
and the conditional failure time PMF for the jth component in the ith system is given by
p(>„ ) = (j) -rU T
r(a)(k—j+1) V Pj(tj + 1)
Thus, the likelihood function for the Ith system is
k
Li(ti1,..., tik|a, A) = k! n
j=1
where, A = (ft,ft,...,ftk).
-a
'ß jtij
k-j
(3)
|j(a)(k-j+T) ßjtij' ßj(tij + T)
-[a
в h
k-j 1
(4)
3. System Reliability Characteristics Measures
The reliability function of the 1-out-of-k load-share system is obtained by considering its mechanism i.e., the system works till its last component is functioning. Thus, the reliability of the system is given as
Rs (t)=P[at least one of k components is in operation]
=P[all k components are in operable state] +P[any one component fails and remaining (k — 1) components survive]+... +P[any (k — 1) components fail and last component is in operation]
Г(а) ftt
+ k
T -
+k
T -
T /1
Щ ßTt
T -
T /1
Щ №
Г(а) ßTt
T -
Г(а) ß21
Г (a) ßk-T t
kt
+
|_Г(а)Чa, ßkt
The CDF, PMF, HRF and RSRF function of the system's failure time T are respectively, given by
Fs (t) = 1 — Rs (t) ps (t) = Rs (t) — Rs (t — 1)
hs (t) =
Ps (t) Rs (t)
and
h2s (t) = log
Fs (t)
Fs (t - T) ■
T
T
T
T
k
T
T
T
T
T
T
T
T
T
T
4. Classical And Bayesian Inference
The likelihood function for n i.i.d. systems is obtained by using equation (4) as
n k
L(T|a, A) = (k!)n Hü
i=i j=1
lr(a)(k-/+i) -r\*> ßjU> ßj (tij +1)
j(tx
'ß A-
k-j 1
(5)
and the corresponding log-likelihood function is
logL = nlog(k!) + £ £ - (k - j + 1) log(r(a)) + log ( Y a, —, ß (t + 1)
i=1 j=1 L v v ßjt/j ßj (t/j + 1)
+ (k - j) log( T(a, ¿j )
(6)
4.1. Maximum Likelihood Estimation
The ML estimates (a, A) of (a, A) can be obtained on solving the following (k+1) normal equations:
nk<k±1) + £ £
1
9a
i=1 j=1 ß^., ßj.(t,^+1))
dd^(T(a, 1
d
1
nk
1
+ ££(k j)T(a, ßj■a^v-ßjt.j
9 / ( 1 via
эaHa, ßj (tij+1)
(7)
aZogL _ -na(k - j +2)+ 1 £ v(a + 1, jj, ßj)) + (k - j) £ v(a + 1, jj) = 0
+ ßjitï 7(«, ßfc, ß^) + ß £ ^ 0
dßj
ßj
ßfa' ßj (t/j+1)-
ßj /=1 v(a, j:)
j'j '
(8)
ßhi
where ^(a) = da'°g(r(a)) is the digamma function and da^fa, p^l = / v(a-1)e—vZog(v)dv.
V P i 'U 0
Since closed form solutions cannot be obtained from the equations (7) and (8). Therefore, any numerical iterative procedure such as Newton-Raphson method can be used here. By considering the invariance property of ML estimation, one can obtain the ML estimates of the reliability characteristics Rs (t), hs (t) and h2s (t). The asymptotic sampling distribution of (a — a, A — A)' is Nk+i(0, £-1) with £ representing the Fisher's information matrix whose elements are given as
92ZogL
£11 = -
da2
£/j = 0; i= j
tu = -
d2 logL
dadß j
a=a,ßj=ßj
j = -
92ZogL
dß2
ßj=ß
1
1
1
1
0
a=a
Using equation (6), one can obtain the second-order derivatives of the log-likelihood function as
d2logL da2
n k
E E
i=t j=t
&2 r(a, j-j) - da-2 r(a, ej)) ( dkr(a, j-j) - l*r(a, ßj))
Э2
r(a ßfa, e(tt+t))
r(a ßfa, e(tT+t))
21
nk
+ EE (k - j)
i=t j=t
r|2-(a ) Г зЫ^ jj) l1
-(a, jj) t r(a, m)
nk(k + T)
У(a)
2
d2logL = E 1 dadß j = E ß j
da-(a + 1 ej1t/y, ß, (tT+1) ) -(a + 1, ßjtij, ß, (tT+1) ) дar(a, jj, ey(tij+1) )
r(a, ßjtj, ßj(tl+t) )
+E
i=t
(k - j) ß j
- saT(a + 1, eTj) r(a + 1, eTj) eTj) 1
r(a, )
r(a ßjtj, ßj(tij+t))2
n(k - j + T)
jj)2
в;
n
d2logL n(k - j + T)a * T r(a + T, ßb,
E
Щ
T
+ E ß2
i=T P j
в = ßj" -(a, jj, j)
"r(a + 2, ßitj, ßj (tl+t)) - r(a + 1, j, ßj (tt+t)) r(a, jj, ßj(tt+1))
-(a + 2, ßtj) - -(a + 1, jj) r(a, jj)
ßjtj, ßj (tij+1)) - EE (k - j) r(a + 1 jj)
=t ß2 -(a, jj) r(a + 1 jj, )
+E
i=1
(k - j) ß2
r(a ßj1^, ß/(tt+1)) -(a + 1, jj) l21
21
r(a, m)
1
ßjt,
where,
, ¿2jj) = / v(a-1)e-v(log(v))2dv.
The asymptotic 100 x (1 — j')% joint confidence ellipsoid for (a, A) is (a — a, A — A)£—1 (a — a,A — A)' < x2k+1)/7', where x2k+1)/7' is the 100 x 7'th percentile of x2-distribution with (k+1) degrees of freedom. Moreover, the asymptotic distributions of the reliability characteristics Rs (t), hs (t) and h2s (t) are N(0, R'£—1R), N(0, h'£—1 h) and N(0, h2£—1 h2), respectively, where,
R'
dRs (t) dRs (t)
a
ЭЛ
, h'
dhs (t). dhs (t)
a
ЭЛ
and h2
dhjt). dh2s (t) -
a
ЭЛ
n
4.2. Bootstrap Method
The bootstrap method is a general resampling procedure for obtaining bootstrap CIs which are an alternative to the asymptotic CIs. Two types of CIs are being used here, i.e., percentile bootstrap (boot-p) and bootstrap-t (boot-t). The procedure given in the two algorithms for boot-p and boot-t methods will be employed for obtaining the bootstrap estimates and confidence intervals for the parameters, reliability, hazard rate and RSRF functions. The algorithms for both the methods are provided in appendix A.
4.3. Bayesian Estimation Using MCMC Approach
Bayesian estimation setup usually involves generating samples from the posterior distribution and using them to summarize the knowledge about the parameters. This makes the use of prior knowledge and the available data. When the prior knowledge is not available, one can make use of the non-informative prior. Here, both the informative and non-informative priors are considered. The prior distributions regarding the load-share parameters a and ßj are taken as gamma priors as
g(a) a aa-1e-a/b ; a,a,b > 0
and
h(ßj) a ßj 1 e-ßj/dj
;ßj,Cj,dj > 0;j = 1,2,...,k
(9)
(10)
Using the priors given in equations (9) and (10) and the likelihood function given in equation (5), the joint distribution of the parameters and the dataset is
K(T, a, A) = L(T|a, A).g(a).h(A)
n k
(k0n nn
i=1 j=1
|_r(a)(k-j+1)_ßjtij, ßj(tij + 1)
7 a
ß jtij
(k-j) 1
a—1 —a/b
a - e
X
n ß
j=1
cj—1 e—ßj/dj-
Here, to obtain Bayes estimates of the parameters, the marginal posterior densities of the parameters are required which are difficult to obtain. Therefore, the use of MCMC techniques like MH algorithm and Gibbs sampler (given in appendix B) will be followed. For that, the full conditional densities of the parameters are obtained as:
nk
^(a|T, A) a aa—1 e—a/bnn
1
i=1 j=1 r(a)(k—j+1) v j ßj(Uj + 1)
1
1
7a
1
7a
1 /
n (ßj | T, a) a ß j—1e—ßj/dj n 7 (a,
i=1
ß jtij' ß j (tij + 1)
7a
'ß jh
ßjtij
(k-j)
(k-j)
(11)
; j = 1,2,..., k
(12)
Note that, sampling from equations (11) and (12) is not easy to be done directly because of its complexity. Therefore, samples are generated by using the MH algorithm.
1
1
1
1
1
1
1
5. Simulation Study
In this section, a simulation study is conducted for analyzing the estimates of the parameters of the proposed model by using classical as well as Bayesian approach. Sample data of size n = 30, 50, 100 and 200 are generated for k = 3, a = 10, ft = 0.001, ft = 0.005 and = 0.01. In classical approach, the ML estimates of the parameters along with their SEs and asymptotic CIs are obtained. Two bootstrapping techniques are applied and bootstrap confidence intervals based on B = 2000 bootstrap replications are also computed. Using Bayesian approach, Bayes estimates of the parameters and reliability characteristics along with their PSEs and HPD intervals are obtained with informative as
well as non-informative priors. For this, MCMC technique is employed using MH and Gibbs algorithms and 10,000 realizations are generated from each posterior density given in (11) and (12). The burn-in period of 500 realizations are removed. From the generated chains, every 5th value is taken for removing the autocorrelation among the values. The trace plots for the parameters are plotted in Figs. (1) - (4) to ensure the fine mixing of the chains. For informative prior, gamma prior is considered for all the parameters a, ft, ft and ft setting the hyperparameters as a = a x b, ft = c1 x d1, ft = c2 x d2 and ft = c3 x d3. The values of all the hyperparameters are taken as approximately 0 under non-informative or Jeffrey's prior. All the discussed estimates along with their SEs/PSEs and CIs/HPD intervals are summarized in Table (1).
After performing the simulation study, the following results are observed:
• All the obtained estimates of the parameters and reliability characteristics become more precise (closer to true values) with an increase in the sample size.
• The SEs/PSEs magnitude of the estimates and the widths of all the intervals decreases on increasing the sample size.
• Bayes estimation with gamma priors is more precise in terms of true values and SEs than the Bayes estimation with Jeffrey's prior as well as ML estimation and bootstrapping methods for different sample sizes.
• Boot-p and boot-t confidence intervals are more precise than the asymptotic CIs as they contain the parameters in smaller width for all the sample sizes.
• Boot-p CIs are providing slightly shorter widths than boot-t CIs for all the samples sizes.
6. Real Data Application
In this section, the applicability of the model is discussed through a real dataset of plasma display devices (PDPs) which is supposed to be a load-sharing model by Kvam and Pena [4]. For PDPs, the degradation is measured in luminosity and a PDP is considered as failed when the luminosity goes below a threshold. A test is conducted with 20 items and 3 sensors spaced evenly across the test device. The dataset contains the failure times for 3 sensors on each of 20 test items.
For fitting a discrete distribution , the integer parts of the data values are taken into consideration. Now, to check whether these failure times can be modeled using load-sharing models, we setup the following hypothesis: H0: Load-sharing behavior exists in the dataset i.e., ft = ft = ft H1: Load sharing behavior does not exist in the dataset i.e., ft = ft = ft. The hypothesis can be tested using the following criteria:
• Akaike information criterion (AIC): —2logL + 2p
• Bayesian information criterion (BIC): —2logL + plogn
• Deviance test statistic: dn = —2[logLH0(T|a,ft — logLH1 (T|a,ft, ft, ft)]
9 *
a
л PD
9 *
0 t
л PD
£ "Ö
и
hJ
T-H 4D ON LO 00 4D ^ LO СО Ю T-H 4D <N СО т-Н ю ON T-H (N
(N т-н о О о СО 00 т-Н СО О 4D LO T-H 00 О со СО О СО о 00
T-H о О о со о LO О О О (N о LO со о О О О о (N т-н о О о о О О
т-н О р CD CD c^ C^ т-н т-н CD С^ CD с^ CD T-H т-н CD CD CD С^ С^ т-н т-Н с^ р C^ р
ci X ci ci ci ci ci ci X X X X X X
4D ^ ON L!^
т-Н т-Н 410 LiS (N
со Ю со ^ СО (N 00 Ю ^ LO (N LO (N Ю CO CO ю ^ т-Н т-н LO Ю со
LO о О о ^ 00 О tv О с^ T-H о <N 4D ^ О т-н (N
со О о о T-H о (N (N О о О О О т-н (N О О о О О О т-Н О О о О О О
CD т-Н т-н CD CD CD CD CD т-Н т-н CD CD CD CD CD T-H т-Н CD CD т-Н CD CD т-н т-н CD CD т-Н CD
ci X X ci ci ci ci ci X X О О Ö Ö X X Ö Ö X X X X О
00 ON Li^ CD чр CD со
LO ^ Г^ c^ Г^ LiS т-Н <N
T-H ON ON т-н LO (N 00 ON СО tv СО c^ ON 4D CO LO ON т-Н LO 4D т-Н
со О ON IN СО СО (N О ON 4D со (N О о C^ CO т-Н О О 4D СО т-Н
о о о о 00 О T-H о О о 00 о (N о О О 00 о СО о О т-Н 00 О ^
сл р р р ON CD ON с^ с^ р ON CD ON c^ с^ CD O) CD с^ с^ С^ с^ (N
cK ci ci ci ci ci ci C^ ci ci C^ о о
T-H (N ON со ON T-H T-H со LO 4D tv Ю <N m <N 00 ю ON т-н 4D
c^ т-Н о IN О 4D т-н СО О (N (N T-H о О 4D (N О (N О О
(N о О о (N о ON о о о (N о LO LO о о О т-н О (N СО О о о О о т-Н
T-H т-н О CD CD CD CD CD т-н т-н CD CD CD CD CD т-н т-н CD CD CD CD CD т-н т-н CD CD с^ CD
ci X ci ci ci ci ci ci X X О Ö X X Ö X X Ö о О
со LO 4D
т-Н т-н LO г^
Ю со IN СО ^ T-H ю ^ LO (N (N 4D Ю CO LO ю т-Н (N 00 ю ON
LO о О о LO 4D О 00 О 00 ^ о CO С^ СО О о СО
со О о о T-H о (N (N О о о о О т-н (N О о о о О О т-н о О О о О о
p т-Н т-н р О CD CD CD т-н т-н р CD CD С^ CD т-Н т-н CD CD т-Н с^ С^ т-н т-Н CD CD т-н р
ci X X ci ci ci ci ci X X X X X X X X
(N IN. ^ т-н LO MD со со т-Н 00
4D со СО т-Н т-н LiS С^ т-Н т-Н
(N ON ON т-н 4D (N СО 4D т-н T-H (N СО T-H C^ 00 <N LO ^ (N ^ ON (N 00 LO LO
О О ^ ON IN СО СО о О ^ ON tv СО со T-H О СО (N т-н О ^ О 4D СО т-н
о о о о 00 О о о О о 00 О ^ О о О О 00 о ^ О О О т-Н 00 о ^
СЛ р р р ON CD ON р С^ р ON CD ON CD с^ CD O) с^ С^ р CD С^ с^ (N
cK ci ci ci ci ci ci c^ ci ci C^ о с^
(N ^ ON (N T-H со 00 т-н (N (N 4D 00 00 т-н о т-н 4D (N 00
00 со 4D ^ (N ON со СО 00 LO т-н LO (N т-н 00 00 т-н СО 4D о 4D
т-н о о О LO О (N о о о о ON О LO О О о CO о (N о О о СО о ^
т-н р р C^ CD СО c^ т-н с^ р C^ CD т-н С^ CD CD с^ т-н CD с^ С^ р CD
СО X ci ci ci ci ci г^ X ci X О т-н X
00 ^ Li^
LO LiS со
^ т-н 4D T-H (N о tv (N ^ T-H 00 ON CO T-H (N т-Н 00 00 00
СО со 4D СО (N 4D о СО 00 ^ т-н о т-н ^ т-Н 4D ON т-н со ^ о ON
LO О о О LO О (N т-н О о о ON О LO (N о О о CO О (N т-Н О О о со о ^
LO т-н р CD c^ CD СО т-н р р CD р LO т-н с^ CD CD С^ СО т-н CD с^ с^ р CD
СО X ci ci ci ci ci X ci C^ X о т-н X
т-Н Ч!^
LO LiS со (N
со 00 T-H 4D (N ON (N ON LO 00 00 ю <N T-H со СО т-Н ю о т-н (N LO
(N т-н T-H О О 4D (N (N о LO (N T-H 00 о LO СО т-н ON О СО
С^ О о О T-H О ON О о О (N о ^ T-H о о О О о СО LO О о о о о т-н
0\ т-н т-н р C^ CD CD т-Н т-н р CD р с^ т-н т-н CD CD CD с^ СО т-Н т-н с^ с^ р CD
ci X X ci ci ci ci ci X X X X X X
СО МО т-н т-н CD со со
т-Н 00 т-Н об 0^ LO к
00 (N IN ^ T-H О СО т-н (N (N со T-H т-н 4D т-н <N CO (N т-н ^ т-н ^ ON LO (N
со т-Н LO LO ON СО ON О т-Н 4D ^ LO СО tv tv т-Н LO CO 00 СО 00 ON т-н LO т-н 4D со LO
(N О о т-н ON о о LO О О т-н ON о tv 00 О О T-H c^ о ^ со о о т-н ON о
О О р О ON CD со С^ CD С^ ON р <N с^ CD C^ O) с^ Ч!^ CD с^ С^ р <N
00 ci ci ci ci ci ci 0^ ci ci
00 (N 00 ON T-H т-Н (N 4D (N LO T-H LO т-Н T-H m т-н (N ^ LO с^ т-Н 00
^ со 00 ^ T-H tv 4D СО 00 О т-н со ON (N LO CO т-н СО 4D т-н со 4D о ON
о о о о T-H О LO т-н о О О tv О 00 (N о О О 4D О LO (N О о о СО о ^
СЛ т-н CD CD T-H CD со CD т-н CD CD CD CD T-H 4D т-н CD CD CD CD т-н Li^ т-Н CD CD CD CD CD
со X ci ci ci ci ci СО X ci О О C^ X Ö Ö X о Ö
00 0^ U0 00
LO LO СО (N
т-н т-Н со LO T-H ^ (N ^ tv 00 ю CO <N СО т-н ^ ю О (N (N 4D
4D (N ON О T-H ON (N О 4D о T-H 4D о с^ ON т-Н ON О (N
С^ о о О (N о ON 4D О О О T-H о ^ о О О T-H о СО 00 О О О О о T-H
а\ т-н т-н CD CD CD CD т-н т-н CD C^ р C^ т-н т-н CD C^ CD С^ СО т-Н т-н С^ CD р CD
ci X X ci ci ci ci ci X X X X X X
LO 00 LO р т-Н <N О)
т-Н ON т-Н С^ LiS СО
со (N ON 00 (N О ^ (N со LO 4D ON ^ СО т-Н <N LO т-н 4D ON т-Н LO 00 ON LO 4D
^ т-Н LO LO ON (N LO о т-Н 4D ^ LO (N 00 ON т-Н LO CO 00 СО т-Н т-Н LO т-н 4D со (N
т-н О о T-H ON О ON 4D О О т-Н ON О tv о О О T-H c^ о 00 О О т-н ON о
CD CD CD CD ON CD <N т-н CD CD CD ON CD <N CD CD CD СЛ CD со CD CD CD c^ CD <N
00 ci ci ci ci ci ci об ci О Ö Ö 0^ О Ö 0^ О
S <u !P В
<u 0
Is œ
я
^ tN 11 J
« CCß CCß CCß c<
о c<
^ tN 11 J
« CCß CCß CCß c<
о c<
^ tN 11 J
« CCß CCß CCß c<
о c<
& 8 S?
^ СЧ m yj
Oß cCß cCß C< ^ C<
0 1000 2000 3000 4000
Iterations
Figure 1: Trace plot of a.
O 0 1000 2000 3000 4000
Iterations
Figure 2: Trace plot of ft1.
o u?
o
0 1000 2000 3000 4000
Iterations
Figure 3: Trace plot of ft2.
o
0 1000 2000 3000 4000
Iterations
Figure 4: Trace plot of ft3.
The fitting summary of the dataset under both the models is provided in Table 2. The observed value of deviance test statistic dn is 9.0385 with corresponding p-value 0.0108 (< 0.05) which suggests that H0 cannot be accepted at 5% level of significance. The same is suggested by comparing AIC and BIC under H0 and H1. Hence, it is concluded that load-sharing behavior exists in the considered dataset.
Table 2: Fitting summary ofPDP dataset
Model -LogL AIC BIC dn
h0 472.8236 949.6473 951.6388 9.0385
h1 468.3044 944.6087 948.5917
7. Concluding Remarks
In this research, a multi-component load-share parallel system is analyzed by assuming that the underlying failure time distribution of each component is DIGD. The classical as well as Bayesian estimation techniques are applied for estimating the parameters of the system. It is assumed that on a component's failure, the total workload imposed on the system will be redistributed to the other working components and this will affect their performance. Such systems exist in many engineering applications like fiber composites, power plants, manufacturing and many more. However, the study can be extended by considering non-identical components where each component is having different loads. Also, generalized IGD can be adopted instead of DIGD in future researches.
Conflict of interest: The authors declare that there is no conflict of interest.
References
[1] Daniels, H. E. (1945). The statistical theory of the strength of bundles of threads. I.
Proceedings Of The Royal Society Of London. Series A. Mathematical And Physical Sciences, 183(995):405-435.
[2] Hussain, T. and Ahmad, M. (2012). Discrete inverse Gamma distribution. Official Statistics And Its Impact On Good Governance And Economy Of Pakistan', 9th International Conference On Statistical Sciences, Islamic Countries Society Of Statistical Sciences, Lahore, Pakistan, 381-394.
[3] Kim, H. and Kvam, P. H. (2004). Reliability estimation based on system data with an unknown load share rule. Lifetime Data Analysis, 10(1):83-94.
[4] Kvam, P. H. and Pena, E. A. (2005). Estimating load-sharing properties in a dynamic reliability system. Journal Of The American Statistical Association, 100(469):262-272.
[5] Park, C. (2010). Parameter estimation for the reliability of load-sharing systems. IIE Transactions, 42(10):753-765.
[6] Park, C. (2013). Parameter estimation from load-sharing system data using the expectation-maximization algorithm. IIE Transactions, 45(2):147-163.
[7] Pundir, P. S. and Gupta, P. K. (2018). Reliability estimation in load-sharing system model with application to real data. Annals Of Data Science, 5(1):69-91.
[8] Pundir, P. S., Srivastava, R., Agarwal, S. and Shrivastava, V. (2022). On the estimation problems for discrete inverse gamma lifetime model with real data applications. Life Cycle Reliability And Safety Engineering, 11(4):313-321.
[9] Ramírez-Espinosa, P. and Lopez-Martinez, F. J. (2021). Composite fading models based on inverse gamma shadowing: Theory and validation. IEEE Transactions on Wireless Communications, 20(8):5034-5045.
[10] Shang, X. and Song, H. (2011). Radar detection based on compound-Gaussian model with inverse gamma texture. IET Radar, Sonar & Navigation, 5(3):315-321.
[11] Singh, B. and Goel, R. (2019). MCMC estimation of multi-component load-sharing system model and its application. Iranian Journal Of Science And Technology, Transactions A: Science, 43(2):567-577.
[12] Singh, B., Sharma, K. and Kumar, A. (2008). A classical and Bayesian estimation of a k-components load-sharing parallel system. Computational Statistics & Data Analysis, 52(12):5175-5185.
[13] Singh, B., Sharma, K. and Kumar, A. (2009). Analyzing the dynamic system model with discrete failure time distribution. Statistical Methods And Applications, 18(4):521-542.
[14] Stinco, P., Greco, M. and Gini, F. (2011). Adaptive detection in compound-Gaussian clutter with inverse-gamma texture. Proceedings Of 2011 IEEE CIE International Conference On Radar, 1:434-437.
[15] Yoo, S. K., Bhargav, N., Cotton, S. L., Sofotasios, P. C., Matthaiou, M., Valkama, M. and Karagiannidis, G. K. (2017). The k — ^/inverse gamma and n — ^/inverse gamma composite fading models: Fundamental statistics and empirical validation. IEEE Transactions On Communications, 69(8):5514-5530.
[16] Zhang, Z., Yang, Y. and Li, D. (2022). Estimation of parameters for load-sharing parallel systems under exponential Pareto distribution. Proceedings Of The Institution Of Mechanical Engineers, Part O: Journal Of Risk And Reliability, 236(2):248-255.
Appendix A Boot-p Method
1. Generate a sample Ti;-(i = 1,2,..., n; j = 1,2,..., k) of size n by using equation (3).
2. Now, regenerate B bootstrap samples Ti* (i = 1,2,..., n; j = 1,2,..., k) of size n from the original sample Ti j to compute B bootstrap estimates (a *, Á *) = © * of
(a, Á) = ©.
3. Let (©*1),..., ©*B) be the ordered statistics of the estimates ©*,..., ©B. Then, 100 x (1 — 7)% boot-p CI is: (© * [yb/2], © * [1 — yb/2])
4. Finally, the bootstrap estimates and their corresponding variances are obtained.
Boot-t Method
1. On the basis of the genereted sample Til., compute the following pivots as:
* a *- a , A *- A
k* = — and k2 —
yyay y/y (A *)
2. Now, repeat the step 1, B-times.
3. Consider S1 (x) = P(k* < x) and S2(x) = P(k2> < x) as the CDFs of k* and k* respectively. Let for a given value x,
a boot-t (x) = a * + V (a *) s-1 (x) and A boot-t (x) = A + ^ V (A) s2-1 (x).
4. The 100 x (1 - 7)% boot-t CIs for a and A are
aboot-t(y/2), aboot-t(1 - Y/2) and Aboot-t(y/2), Aboot-t(1 - y/2).
Appendix B Gibbs Algorithm
1. Generate a and ft. (. = 1,2,...,k) from (a|T,A) and n2(|T,a) as given in equations (11) and (12), respectively.
2. Repeat the above step, M times. To remove the effect of starting values, record the generated sequence of the parameters after some N (< M) burn-in draws.
3. Bayes estimates and their corresponding posterior variances of the parameters as well as system reliability function, hazard rate function and RSRF function are computed by considering the means and variances of the generated values of the parameters and these three reliability characteristics.
4. Now, considering the ordered sequence of the parameters and reliability characteristics, the 100 x (1 - 7)% HPD intervals are constructed.
Metropolis-Hastings Algorithm
1. Start with an initial value x0 from the support of the prior distribution and consider i = 1.
2. Now, generate a proposal xprop by using the proposal density q(x/ |xi-1).
3. Calculate the acceptance probability as
Pa (xprop |xi-1) = min
1 q(xi-1 |xprop ) f (xprop )
, q(xprop |x/-1)f (xf-1)
4. Generate a random variable U from uniform distribution on (0,1).
5. The proposal point will be accepted if u < Pa by considering x/ = xprop, otherwise, reject it and set x/ = xi-1.
6. Set i = i + 1 and return to step 2.