Научная статья на тему 'Dimensioning the extended capacity of Zlatar Ski Center using linear programming method'

Dimensioning the extended capacity of Zlatar Ski Center using linear programming method Текст научной статьи по специальности «Физика»

19
4
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
linear programming / ski lifts and ski slopes / optimization of extended capacity / linearno programiranje / ski liftovi i ski staze / optimizacija proširenog kapaciteta

Аннотация научной статьи по физике, автор научной работы — Bogdan Marković, Milan Marković, Dragana Velimirović

Zlatar Ski Center has an extremely high potential as a ski resort that could be among the most visited ones in Serbia. What characterizes this center is the proximity of Kokin Brod Lake, the Tara River and the like. Therefore, Zlatar should be considered both as a ski center and in terms of other diversities. The aim of this paper is to analyze the possibility of expanding the capacity of ski resorts by increasing the possible flow of skiers on new ski lifts and ski slopes. The methods used in this paper belong to operational research, specifically, the geometric interpretation of linear programming. It is also shown how to optimize the extended capacities. If the capacities of ski slopes are to be increased, it would initiate greater investment in accommodation capacities in the area of the municipality of Nova Varoš, which would affect its improvement in terms of tourism.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Primena linearnog programiranјa na dimenzioniranje proširenog kapaciteta ski centra Zlatar u Novoj Varoši

Ski centar Zlatar poseduje izuzetno visok potencijal kao skijalište koje bi moglo da bude u rangu najposećenijih u Srbiji. Ono što ovaj centar istiĉe, i u pozitivnom smislu izdvaja od drugih, je blizina jezera Кokin Brod, reke Tare i sliĉno. Prema tome, Zlatar ne bi trebalo razmatrati samo kao ski centar, već i sa aspekta posedovanja i drugaĉijih diverziteta. Cilj rada je analiza mogućnosti proširenja kapaciteta skijališta povećanjem mogućeg protoka skijaša na ţiĉarama i kapaciteta ţiĉara. U tom smislu, predviĊa se i povećanje broja staza, kao i interkonekcija izmeĊu njih. Metode koje su korišćene u radu pripadaju operacionim istraţivanjima, konkretno, geometrijska interpretacija linearnog programiranja. Prikazano je da je na ovaj naĉin moguće optimizovati proširene kapacitete. Povećani kapacitet ski staza inicirao bi veće ulaganje u smeštajne kapacitete na prostoru opštine Nova Varoš, ĉime bi se uticalo na njeno unapreĊenje u turistiĉkom smislu.

Текст научной работы на тему «Dimensioning the extended capacity of Zlatar Ski Center using linear programming method»

Original Scientific Paper UDC: 338.48-44(23.0)(497.11)

005.311.12:519.852 doi: 10.5937/menhottur2102095M

Dimensioning the extended capacity of Zlatar Ski Center using linear programming method

Bogdan Markovic1, Milan Markovic1, Dragana Velimirovic1*

1 Academy of Applied TechnicalStudies - College of Traffic, Mechanical Engineering and Safety Engineering, Belgrade, Serbia

Abstract: Zlatar Ski Center has an extremely high potential as a ski resort that could be among the most visited ones in Serbia. What characterizes this center is the proximity of Kokin Brod Lake, the Tara River and the like. Therefore, Zlatar should be considered both as a ski center and in terms of other diversities. The aim of this paper is to analyze the possibility of expanding the capacity of ski resorts by increasing the possible flow of skiers on new ski lifts and ski slopes. The methods used in this paper belong to operational research, specifically, the geometric interpretation of linear programming. It is also shown how to optimize the extended capacities. If the capacities of ski slopes are to be increased, it would initiate greater investment in accommodation capacities in the area of the municipality of Nova Varos, which would affect its improvement in terms of tourism.

Keywords: linear programming, ski lifts and ski slopes, optimization of extended capacity JEL classification: C44, Z32

Primena linearnog programiranja na dimenzioniranje prosirenog kapaciteta ski centra Zlatar u Novoj Varosi

Sazetak: Ski centar Zlatar poseduje izuzetno visok potencijal kao skijaliste koje bi moglo da bude u rangu najposecenijih u Srbiji. Ono sto ovaj centar istice, i u pozitivnom smislu izdvaja od drugih, je blizina jezera Kokin Brod, reke Tare i slicno. Prema tome, Zlatar ne bi trebalo razmatrati samo kao ski centar, vec i sa aspekta posedovanja i drugacijih diverziteta. Cilj rada je analiza mogucnosti prosirenja kapaciteta skijalista povecanjem moguceg protoka skijasa na zicarama i kapaciteta zicara. U tom smislu, predvida se i povecanje broja staza, kao i interkonekcija izmedu njih. Metode koje su koriscene u radu pripadaju operacionim istrazivanjima, konkretno, geometrijska interpretacija linearnog programiranja. Prikazano je da je na ovaj nacin moguce optimizovati prosirene kapacitete. Povecani kapacitet ski staza inicirao bi vece ulaganje u smestajne kapacitete na prostoru opstine Nova Varos, cime bi se uticalo na njeno unapredenje u turistickom smislu.

* vps.draganavl@gmail.com

This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (http ://creativecommons .org/licenses/by/4.0/).

Kljucne reci: linearno programiranje, ski liftovi i ski staze, optimizacija prosirenog kapaciteta

JEL klasifikacija: C44, Z32

1. Introduction

The paper provides an approach to establishing the required number of lifts in the case of expansion of Zlatar Ski Center assuming an increase in the number of ski slopes. The starting point is that the chair lift that supplies more ski slopes must not have a capacity greater than the capacity ofthe ski slope with the lowest capacity that gravitates to that lift. The reason is a security aspect (Wheeler, 2012). In the event that some ofthe ski slopes are closed and the capacity of the chair lift to which these ski slopes gravitate is fulfilled, skiers would be directed to one or more of the remaining ski slopes in service. In that case, the open ski slopes that are in service should not be overloaded. The flow of skiers should not be higher than the maximum availability of the ski slopes (Poulhes & Miria, 2017; Revilloud et al., 2011). For this reason, the sizing of the chair lifts is realized in the stated way. In the following chapters a model for sizing the capacity of lifts in accordance with the existing system of ski slopes and the projected capacity of new ones (Wheeler, 2012) will be provided.

The main hypothesis ofthis research is that it is possible to resize the capacity of Zlatar Ski Center, and based on mathematical model and linear programming implementation the optimal solution of extended model dimensioning of ski slopes and ski lifts could be calculated.

Optimization of tourist capacities with the necessary logistics is permanently present topic (Jangra & Kaushik, 2021), and the application of the linear programming for that purpose was considered in papers published before (Borrelli et al., 2003; Knijff & Oosterhaven, 1990).

2. Mathematical models for ski slopes capacity dimensioning

The capacity of a ski lifts system is projected by applying flow analysis and Kirchhoffs rule that total input to the system is equal to the output from it. It is necessary to respect the equation of flow continuity (Madarevic, 1969). The flow of skiers on the ski lifts is the function ofthe capacity of ski slopes by which the system is getting relieved. Chair ski lifts that lead to the peaks have the largest capacity. They are directed from the accommodation facilities, like hotel complex or ski bus terminus to the highest peaks. From these points, there is a flow divergence to smaller capacity T - bar type ski lifts, which cover the complex of ski slopes (Markovic, 2019a; Suvajdzic, 1972). According to the fact that the organization of skiers' flow is the main activity in the considered area (Zrnic, 1993), ski center represents a big system of internal transport.

2.1. Chair lift dimensioning

The capacity of ski lifts is dimensioned on the basis of the required flow of skiers, i.e. the available accommodation capacity ofthe hotel or the capacity of the bus line by which the skiers are brought to the starting point ofthe chair lifts. The capacity of the ski lifts leading from the starting point is the largest and matches the sum of capacities of smaller ski lifts (often T-bar type) which gravitate to the ski slopes capacity. According to that, the possibility of shifting skiers from one ski slope to the other has also to be considered. It is important that percentage of such flows must not exceed the maximum allowed ski slope capacity. Presentation of such a situation is provided for a hypothetical ski center in Table 1 and Figure 1 (Markovic, 2019a).

Table 1 represents the schema for the share of skiers per hour crossing from one ski slope (rows) to the other (columns). Values in the cells are expressed in percentage of the maximum capacity of the ski slope, in skiers per hour that are expected to cross from one slope to another.

Table 1: Share of skiers per hour (%) crossings from one ski slope to another and ski slopes

capacity of a hypothetic ski center

Ski slopes 1 2 3 4 5 6 7 8 Capacity [skiers/h]

0 0 10 10 5 10 0 1000

5 0 0 0 5 5 5 2000

10 5 5 0 0 0 0 3000

5 10 0 0 0 5 10 1000

0 0 5 20 0 0 0 1000

0 0 5 0 5 5 5 500

5 0 5 10 0 5 0 2000

0 0 10 0 0 0 0

Source: Author's research

For example, the estimated share percentage of skiers crossing from the first ski slope to Slope 4, 5 and 7 is maximum 10%, while only 5% could be transferred to Slope 7. Accordingly, the capacity of each ski slope on which crossing is assumed has to be boosted according to enlarged number of skiers per hour. A similar approach is to be applied for other ski slopes (Markovic, 2019a). In the case of designing a new ski slope, No. 8, which gravitates to the chair lift 2 from direction 1 and to the chair lift 1 from the same direction, including the inflow of skiers from other ski slopes, the layout will be as presented by scheme, Figure 1 (Markovic, 2019a).

Figure 1: Ski slope 8 loading, by chair lifts and by adjacent ski slopes

Required capacity on thejofthe total: n directions from the center of the ski resort, n = 3; I, II and III direction, to the peaks is as follows :

m

Q [skiers/ h] < Z q

ji i=i

where:

- qji [skiers/h] - capacity of the i ski lift in the j direction,

- m - total number of ski lifts in the j direction.

The total flow of all ski lifts in skiers per hour is expressed by:

s n m

z Zg =zz

g=1 1=1 i=1

2.2. Ski slopes dimensioning

Necessary capacity tg ofthe ski slope g represents the projected hourly flow of skiers on that ski slope in the form:

l s

t \skiers / h] = Z Z ■ [skiers / h] + Z Pg! ' Z \skiers / h]

1=1 i=i

where:

- s - total number of ski slopes,

- Zg [skiers/h] - projected hourly flow of skiers on ski lifts to which the g ski slope gravitates,

- Pg[%/100] - the share ofcapacity expressed through the hourly flow ofskiers crossing from i ski slope to the g ski slope,

- Zi [skiers/h] - projected hourly flow of skiers on i ski slope,

- l - total number of ski lifts by which the ski slope gravitates.

The capacity of all ski slopes is in the form:

totalNo of all ski slopes

T[skiers / h] = Ztg

g=1

3. Design of necessary chairlifts and ski slopes capacity

Since the aim of this paper is analysis ofpossible capacity expansion of Zlatar Ski Center, it is necessary to present the current situation first. Zlatar Ski Center current state is represented in Figure 2 with ski slopes I and II, as well as the four-seat chairlift that leads from foot to the top, together with T-bar ski lift that leads from the fork point bi to the peak point ai. Peak point a1 is top point to which it is possible to get from the foot of the mountain as well as from the middle fork point: b1, Figure 2. This paper estimates that in addition to the mentioned peak point and middle fork point b1, new peak points should be designed: a2 and a3, Figure 2. Skiers will be able to get to these points from the new base point S by newly designed chairlifts: 2, 3 and 4 as suggested in Figure 2. Skiers are expected to access several newly designed ski slopes, i.e. III to VI from top points a2 and a3, and from those new slopes middle points b2 to b5, Figure 2, skiers would be able to get to the top again by newly designed smaller capacity T-bar type ski lifts. According to that, skiers are not forced to descend to the base point in order to reach the top points again by high capacity ski lifts, but

with smaller capacity, T-bar type ones. Considering the unused benefits of this ski center due to high snow amount and average number of snow days during the year, Table 2, this paper proposes a solution to the possible capacity expansion ofthis ski center by introducing new fork points, new ski slopes and ski lifts as described.

Table 2: Average snowfall at Zlatar

Month Snow amount (week) Snow days (week)

December 16 cm 2.8 days

January 20 cm 3.3 days

February 22 cm 3.5 days

March 23 cm 3.4 days

April 10 cm 1.6 days

Source: Snow-forecast (2021)

According to the abovementioned, newly designed T -bar ski lifts would be used for taking skiers from mid-points b,, i = 2,... n,n =5 to points a,, i = 2, 3 on the peak as they will not be forced to take chairlift from the starting point S, Figure 2.

Altogether, the existing and newly designed layout of the Zlatar Ski Center is shown in Figure 2. The full lines show ski slopes, the dashed lines represent newly designed chairlifts in the directions toward a2 and a3 points. The Arabic numerals refer to chairlifts while Rome numerals refer to ski slopes.

Figure 2: Zlatar Ski Center, existing and newly designed layout

Legend

I, II... - ski slope sign, 1,2... - the sign of the chairlift to the first forks -ai,a2, and a3, -- existed ski slope,

— - - chairlift, new,

- skicrossway,

— - existing chair lift

— - ski cross way to

fork point b|,

- crossway from chairlift to slope,

- newly designed ski slope,

— " - ski slope which is

yet to be designed,

— - road to ski bus,

S - newly designed start point.

Source: Zlatarlnfo Portal, Kornjacos, Tech (2021)

In order to increase the number of ski slopes and the chair lifts of Zlatar Ski Center, a new starting point is planned towards the fork points a2 and a3, as well as the crossing from one ski slope to another, Table 1 and Figure 2.

Newly designed concept introduces the expansion of the capacity of the Center, where it is necessary to harmonize the capacity of the newly designed ski slopes and the required capacity ofthe newly designed chair ski lifts, which leads to the optimization of the existing conditions. The required capacity ofeach ofthe four newly designed chair lifts that supply five ski slopes of the newly designed Ski center Zlatar is established. Ski center is to be designed with the ski slopes capacity of 1000, 2000, 3000, 2000 and 4000 skiers per hour.

The criterion for determining the required capacity of the ski lift is the fulfillment of the conditions that the capacity of the ski lift must be at maximum, but not higher than the capacity ofthe ski slope with the lowest through pass, comparing the through passes of all ski slopes that gravitate to that ski lift.

On the other hand, the capacities of chair lifts that supply a particular peak point "a", Figure 2, must be approximately equal to the capacity of all smaller capacity T-bar ski lifts that gravitate to the point "a". The capacity of chair lifts is in correlation to the capacity ofthe ski slopes that gravitate to them and is to be established in chapters that follow.

The required capacity ofeach ofthe newly designed chair lifts, including the existing one, is being established. The calculation is also realized in compliance with the principle that the total capacity of chair lifts that supply ski slopes must not be greater than the capacity of the lowest capacity ski slope from the aspect ofthe hourly flow of skiers. When performing the calculation (Markovic, 2019a), the shifting of skiers from one ski slope to another is not foreseen while the chair lifts supply the ski slopes in the following way: ski lift No. 1 supplies the ski slopes 1 and 2; ski lift No. 2, supplies the ski slopes 2, 4, and 5; ski lift No. 3, supplies the ski slopes 3, 4 and 5; and ski lift No. 4, supplies the ski slope 5 as well as the newly designed one, i.e. No. 6, Figure 3.

Figure 3: Ski center scheme

It is not allowed to achieve influx of skiers on the ski slope greater than its capacity. On the basis of this, through the geometric interpretation of linear programming (Nadler, 1973; Markovic, 2019b; Borrelli et al., 2003; Kasana & Kumar, 2004), inequalities are formed for the maximum capacity (Nash & Sofer, 1996; Sarbjit, 2018) of each ski slope: i, i =1, ... , n=5, in the form:

C1 < 1 000, for ski slope 1, Cx + C2 < 2 00 0 = C 2 < 2 00 0 - Cx, for ski slope 2, (1)

C3 < 3 000, for ski slope 3,

C2 + C 3 < 2 0 00, for ski slope 4, => C3 < 2000 -C2,C3> 0 => 2000 - C2 > 0 => C2 < 2000,

C2 + C3 + C4 < 400 0, for ski slope 5, C4 < 400 0 - (C 2 + C 3), C4 > 0 => 4000 - C2 - C3 > 0, C3 > 0 => C2 < 4000.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Inequalities follow in the next form:

C1< 1000, C2<1000, and C > 0, i=1, ..., m, m = 4.

(2)

(3)

(4)

In this case Ci, i = 1, ..., m, m = 4, represent the capacities of the ski lifts (Dedijer, 1983) that should weigh the highest possible value, whereby it is not possible to supply the ski slopes with the flow of skiers that exceed the capacity of the ski slope. It has to be noted that the requirement is that the capacity of the ski slope must not be exceeded even in the case of closing one of the ski slopes that are supplied by the same chair lift.

The objective function that represents the maximum flow of skiers on all ski slopes ofthe ski resort, and should strive for the maximum value is in the form:

Hence:

0 < F = S C, i = 1 ^ 4, F = C + C + C + C ^ max

F = C + C + (2000 - C ) + (4000 - (C2 + C )) = = C + C + (2000 - C ) + (4000 - (C + 2000 - C ))

F = C + C+(2000 - C2)+2000 = C + 4000, F ^ 0.

(5)

(6)

Inequalities (1), (2), (3) and (4) are entered in diagram C1 - C2, Figure 4. A vertex coordinates ofM1,M2,M3 and M4 represent capacities of chair lifts 1, 2, 3, and 4, Figure 4.

Figure 4: Chair lifts capacity domain and capacity of objective function (6)

c2j

Fc=0

Obje mini and

max read

: ctive function has its minimum in points Mx M2, while its maximum value is ed in M3 and M4.

20В1Жа

The condition that has to be met is:

l, C2, C3, C4 >0

-4000

Source: Author's research

T 1000

2000

С1

i=1

These vertexes form the closed polygonal line that bounds the domain for the chair lifts capacities in skiers per hour, i.e. C\, C2, C3, C4, (Markovic, 2019a), and are as follows:

M {Cn,C2,C,3,C4),i = 1,2,3,4.

?nnrr>

(7)

M (0, 0, 2000, 2000), M2(0, 2000, 0, 2000)

M (1000,1000,1000, 2000), M2(1000, 0, 2000, 2000).

The largest traffic on the chair ski lifts is realized in the vertexes M3 and M4 (7). As it is not possible for traffic on the chair lift to be zero, by the reason of its abolition in that case, the values of coordinates in vertex M3 are to be adopted as adequate. That means that the capacity of the chair lifts will be C,=1000, C2=1000, C3=1000 and C4=2000 skiers per hour (7). This state is to be considered as optimal.

The coefficient of ski slope utilization from the aspect of cableway capacity is in the form:

k = C = 1000 = 1 ^ 100%, k = C + C = 2000 = 1 ^ 100%, 151 S 1000 152 S2 2000

k = Cl = = 0.3 ^ 30%,k = CL+CL = 2000 = 1 ^ 100%, (8)

153 S3 3000 154 S4 2000

k = C+C3+C4 = 4000 = 1 ^ 100%.

155 S 4000

Where: St[skiers/h], 1=1, ..., 5 - capacity of i - ski slope.

Authors of the paper created and ran the program SKIERS 6, based on Williams (2003), taking into account calculations presented in this chapter, (1) to (8). The results are presented in the chapter that follows. The difference is that in new cases the percentage of skiers crossing from one ski slope to the other is also included in account scheme. This option is described in the hypothetical example in chapter 2.

4. Results of the analysis of ski flows at Zlatar Ski Center, Nova Varos

By applying the SKIERS 6 program package, the results listed in the files were obtained as follows:

Total capacity of all ski slopes: 12000 [skiers/h]

Total capacity of all chair ski lifts: 5000 [skiers/h]

The percentage utilization of the ski slopes is 41.66666 [%]

Minimum of the capacity necessary for the ski slope 1, calculated with no crossing to this ski slope from the others is 1000 [skiers/h]

Minimum of the capacity necessary for the ski slope 2, calculated with no crossing to this ski slope from the others is 2000 [skiers/h]

Minimum of the capacity necessary for the ski slope 3, calculated with no crossing to this ski slope from the others is 1000 [skiers/h]

Minimum of the capacity necessary for the ski slope 4, calculated with no crossing to this ski slope from the others is 2000 [skiers/h]

Minimum of the capacity necessary for the ski slope 5, calculated with no crossing to this ski slope from the others is 4000 [skiers/h]

Minimum of the capacity necessary for the ski slope 6, calculated with no crossing to this ski slope from the others is 2000 [skiers/h]

The scheme ofthe anticipated percentage of crossings from each ski slope to all the others [skiers/h] is as follows:

Ski slope No. 1 No. 2 No. 3 No. 4 No. 5 No. 6

Ski slope No. 1 0 200 0 0 0 0

Ski slope No. 2 0 0 0 0 0 0

Ski slope No. 3 0 0 0 0 0 0

Ski slope No. 4 0 0 0 0 200 0

Ski slope No. 5 0 0 800 400 0 0

Ski slope No. 6 0 0 0 400 0 0

Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 1 Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 2 Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 3 Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 4 Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 5 Minimum of the capacity necessary for the Efficiency coefficient of the ski slope No. 6 Minimum of the capacity necessary for the

ski slope 1 is: 1200 [skiers/h] is: w(1)= 1.2

ski slope 2 is: 2000 [skiers /h] is: n(2)= 1

ski slope 3 is: 1000 [skiers /h] is: n(3)= 0.3333333 ski slope 4 is: 2200 [skiers /h] is: n(4)= 1.1

ski slope 5 is: 5200 [skiers /h] is: n(5)= 1.3

ski slope 6 is: 2400 [skiers /h] is: w(6) = 1

all ski slopes is: 14000 [skiers /h]

Efficiency coefficient of all ski slopes from the aspect ofthe minimum necessary capacity is in the sum of 0.53.

It is stated that on the ski slopes 1 and 5, the utilization coefficient is higher than one due to the anticipated possibility of skiers crossing from one ski slope to another. This causes the necessary increase in the capacity of the ski slopes in order to reduce the utilization coefficients ofthe ski slopes 1 and 5. The improved solution is presented in the scheme of the ski resort, Figure 5.

Figure 5: Ski slopes capacities

1200 2000 1000 2200 5200 2400

1 2 3 4

Ski slopes

n=6

Chair lifts m=4

Source: Author's research

Based on Figure 5, through the geometric interpretation of linear programming, inequalities are formed for the maximum capacity of each ski slope: i, i =1, ... , n=6, in the form that follows:

C-l < 12 00, for ski slope 1, Q+C2 < 2 0 00, C 2 > 0 = C2 > 2 00 0 - Cl = Cl < 2 00 0, for ski slope 2, (9) C3 < 1 000, for ski slope 3,

C2 + C 3 < 22 00, for ski slope 4, = C3 < 2 2 00 - C2,C 3 > 0 = 2200 - C2 > 0 = C2 < 2200, (10)

, for s ki s lope 5,

C4 < 52 00 - (C2 + C3),C4 > 0 = 52 00- C2- C3 > 0,C 3 > 0 = C2- 52 0 0 > 0 =

C2 < 5200,

C4 < 2400, for ski slope 6. (11)

According to inequalities (9), (10) and (11), there follows:

Cj<1200, C2<2200, and C1 > 0, 1=1, ..., m = 4. (12)

Here, C„ 1=1, ..., m = 4, according to (12), represent the capacity ofthe chair lifts that should strive for the highest possible value, while it is not possible to supply the ski slopes with a flow of skiers that exceeds the capacity ofthem. It should be noticed that the capacity of the ski slope should not be exceeded even in the case of closing one of the ski slopes that is supplied by the same chair lift.

The objective function that represents the maximum flow of skiers on all ski slopes of the ski resort, and should strive for the maximum value, is in the form:

n=4

0 < F =XC, 1 = 1 - 4,F = C + C + C + C ^ max , Figure 6. (13)

1=1

Fc=0

Obje

ctive function has its

be m

Figure 6: Chair ski lifts capacity domain

C2

minimum in points Mx and M2. maxi num value is reached in M3 and M4.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

jjumis lvi i

while its 2L&1AL

The condition that has to

:t is:

'1; C2> C3, C4 >0

-5200

Source: Author's research

T

1200

2000

Ci

Vertex coordinates Mx, M2, M3, M4 ofthe domain, formed by closed polygonal line bounding the domain area that represents the chair lift capacities Ci, C2, C3, C4 [skiers/h], (12), are as follows:

M, Ci,Ca,Ca,Ci4),i = 1,2,3,4.

M(0, 0,1000, 2400), M2(0, 2000, 2000, 2400), M3(1200, 800,1000, 2400), M2(1200, 0,1000, 2400).

(14)

Objective function values in vertexes, according to (13), are as follows in (15):

FcMi = 3400,FcMz = 460 0,FcM_ = 5400, FcAÍ4 = 460 0. (15)

5. Discussion

According to previously mentioned in equation (14), the biggest flow on the chair lifts is assumed in vertexM3. That concerns the chair lifts capacities in the sizes: C1=1200, C2=800, C3=1000 and C4=2400 [skiers/h], (14). This state is considered to be the optimal one.

Efficiency coefficients of the ski slopes according to chair lift capacities are as follows in (16):

= ^ = 1200 = i ^ 100%, *.2 = ^ = 2000 = i ^ 100%,

is1 ^ 1200 is2 S2 2000

= Ç = 1000 = 1 ^ 100%, k = = i800 = 0.81 ^ 81%, (16)

is3 S3 1000 "4 S4 2200

C + C + C 4200 C 2400

= C + C3 + C4 = 4200 = 0.81 ^ 81%, kis6 = C = 2400 = 1 ^ 100%.

is5 5200 is6 2400

Where: Si [skiers/h], /=1, ..., 5 - capacity of i- ski slope.

6. Conclusion

This paper presents a mathematical model, geometric interpretation of linear programming, as well as the Standard Maximum Method and its usage in the field of transport. The aim of the paper is to analyze the possibility of expanding the potential of Zlatar Ski Center by designing new ski slopes as well as installing additional chair lifts in order to complete the tourist offer of that Center. Additionally, the paper also provides a model for finding the optimal capacity of additionally designed ski slopes. The ski center is studied as a large system ofinternal transport, considering that the analysis of the flow is the main activity.

The obtained results showed that it is possible to confirm the hypothesis stated at the beginning of this paper and get the optimal solution of the expanded capacity of the ski center by applying linear programming and the presented methodology.

This paper also presents the application of a software program, developed by the authors, to establish the coefficient of utilization of the ski slopes as well as the entire ski resort. The percentage of skiers who cross from one ski slope to another is also covered, together with "goal" function ofthe problem and detecting its maximum. Finding the maximum capacity of the projected system is also achieved.

Conflict of interest

The author(s) declare no conflict of interest.

References

1. Borrelli F., A. Bemporad A., & Morari M. (2003). Geometric algorithm for multi parametric linear programming. Journal of Optimization Theory andApplications, 118, 515-540. http s://doi.org/10.1023/B:J0TA.0000004869.66331.5c

2. Dedijer S. (1983). Osnove transportnih uredaja [Basics of transport devices]. Beograd, Srbija: Gradevinska knjiga.

3. Jangra, R., & Kaushik, S. P. (2021). Estimating carrying capacity in a high mountainous tourist area: A destination conservation strategy. In R Singh et al. (Eds). Global GeographcalHeritage, Geoparks andGeotourism (pp. 427-447). Singapore: Springer. https://doi.org/10.1007/978-981-15-4956-4_22

4. Kasana, H. S., & Kumar, K. D. (2004). Introductory operations research, theory and applications, geometryoflmear programmmg. Berlin Heidelberg, Germany: SpringerVerlag.

5. Knijff E. C., & Oosterhaven, J. (1990). Optimizing tourist policy: A linear programming approach. Reg1onal Stud1es, 24(1), 55-64. http://dx.doi.org/10.1080/00343409012331345784

6. Madarevic, V. (1969). Rukovanje materyalom [Material handlmg]. Zagreb, Hrvatska: Tehnicka knjiga.

7. Markovic, B. (2019a). Metode optimizacije u organ^acy transporta 1 rukovanja materijalom [Optimization methods 1n orgamzation of transport and material handlmg]. Beograd, Srbija: Tehnikum Taurunum.

8. Markovic, B. (2019b). Unutrasnji transport [Internal transport]. Beograd, Srbija: Tehnikum Taurunum.

9. Nadler, M. (1973). A geometric interpretation of the SIMPLEX method of linear programming. The Mathemat1cs Teacher, 66(3), 257-264. https://www.jstor.org/stable/27959267

10. Nash, S., & Sofer, A. (1996). Lmear and nontinear programmmg. McGraw-Hill Companies, Inc.

11. Poulhes, A., & Miria, P. (2017). Dynaski, an agent-based model to simulate skiers in a skiarea. Proced1a Computer Sdence, 109, 84-91. https://doi.org/10.1016Zj.procs.2017.05.298

12. Revilloud, M., Loubier, J. C., Doctor, M., Kanevski, M., Timonin, V., & Schumacher, M. (2011). Artificial snow optimization in winter sport destinations using a multi-agent simulation. In Y. Demazeau et al. (Eds.), Advances on Practical Apptications of Agents and Multiagent Systems (pp. 201-210). Berlin, Heidelberg: Springer. http://dx.doi.org/10.1007/978-3-642-19875-5_26

13. Sarbjit, S. (2018). Note on linear programming technique. Internat1onal Journal of Current Reasearch, 10(2), 65398-65400. https://www.journalcra.com/sites/default/files/issue-pdf/28508.pdf

14. Snow-forecast (2021). Retrieved September 6, 2021 from https://www.snow-forecast.com/resorts/Zlatar/

15. Suvajdzic S. (1972). Organizacija ili racionalizacija unutrasnjeg transporta [Orgamzation and rationatity ofthe Internal Transport]. Beograd, Srbija: Univerzitet u Beogradu, Saobracajni fakultet.

16. Wheeler, S. M. (2012). Understanding and improving the urban environment. metropolitan sustainability. A Volume m WoodHead Pubtishmg Series m Energy, 24. 587-606.

17. Williams, H. P. (2003). Model buHding 1n mathematical programmmg. John Wiley & Sons.

18. ZlatarInfo Portal, Kornjacos, Tech. (2021). Retrieved September 6, 2021 from https ://zlatarinfo .rs/

19. Zrnic B. (1993). Veliki s1stemi unutrasnjeg transporta [B1g systems of mternal transport]. Beograd, Srbija: Univerzitet u Beogradu, Masinski fakultet.

Received: 24 June 2021; Sent for revision: 3 November 2021; Accepted: 30 November 2021