Научная статья на тему 'Design of One-sided Modified S Control Charts for Monitoring a Finite Horizon Process'

Design of One-sided Modified S Control Charts for Monitoring a Finite Horizon Process Текст научной статьи по специальности «Электротехника, электронная техника, информационные технологии»

CC BY
119
25
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
Control charting technique / finite horizon process / process variability / statistical quality control / truncated average run length

Аннотация научной статьи по электротехнике, электронной технике, информационным технологиям, автор научной работы — Mei Tuan Teng, Sin Yin Teh, Khai Wah Khaw, Xinying Chew, Wai Chung Yeong

Control charting techniques are widely used in the manufacturing industry. One of the common charts that are used to monitor process variability is the S control chart. Finite horizon process monitoring has received great attention in the last decade. In the current literature, no attempt has been made to monitor the process variability in a finite horizon process. To fill this gap in research, this paper proposes two one-sided modified S charts for monitoring the standard deviation in a finite horizon process. The performance of the proposed charts is evaluated in terms of the truncated average run length and truncated standard deviation of the run-length criteria. The numerical performances of the proposed charts are shown with the selection of numerous process shifts. The effect of the sample sizes, the number of inspections and the process shifts are studied.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Design of One-sided Modified S Control Charts for Monitoring a Finite Horizon Process»

Teng MT, Teh SY, Khaw KW, Chew XY, Yeong WC RT&A, No 3 (63) MODIFIED S CHARTS FOR A FINITE HORIZON PROCESS_Volume 16, September 2021

Design of One-sided Modified S Control Charts for Monitoring a Finite Horizon Process

Mei Tuan Teng1, Sin Yin Teh2, Khai Wah Khaw3*, XinYing Chew4,

Wai Chung Yeong5

123School of Management, Universiti Sains Malaysia, 11800 Penang, Malaysia 4School of Computer Sciences, Universiti Sains Malaysia, 11800 Penang, Malaysia 5School of Mathematical Sciences, Sunway University, 47500 Petaling Jaya, Malaysia 1 [email protected], [email protected], [email protected], [email protected],

[email protected] ^Corresponding Author

Abstract

Control charting techniques are widely used in the manufacturing industry. One of the common charts that are used to monitor process variability is the S control chart. Finite horizon process monitoring has received great attention in the last decade. In the current literature, no attempt has been made to monitor the process variability in a finite horizon process. To fill this gap in research, this paper proposes two one-sided modified S charts for monitoring the standard deviation in a finite horizon process. The performance of the proposed charts is evaluated in terms of the truncated average run length and truncated standard deviation of the run-length criteria. The numerical performances of the proposed charts are shown with the selection of numerous process shifts. The effect of the sample sizes, the number of inspections and the process shifts are studied.

Keywords: Control charting technique, finite horizon process, process variability, statistical quality control, truncated average run length

I. Introduction

Control charting techniques are common-used techniques in the process of signal detection to improve the quality of process monitoring [1 - 2]. Generally, two types of variables control charts are commonly implemented in-process monitoring, i.e. (1) process mean and (2) process standard deviation. Shewhart X was introduced for monitoring the process mean whereas R and S charts are used to monitor the process variability of the quality characteristic. The statistical control charts are widely used in the manufacturing and service industries to monitor both products and processes. For instance, Li et al. [3] implemented the multivariate weighted Poisson chart to monitor the two-dimensional telecommunications data. Chew et al. [4] considered the multivariate variable parameter coefficient of variation chart for monitoring the spring manufacturing process. The yoghurt cup filling process was monitored by Shongwe et al. [5] using the run rules chart. Chew et al. [6] applied the run rules chart for the steel sleeve measurement while Castagliola et al. [7] utilized the variable sample size chart for monitoring the die casting hot chamber process.

Numerous charts were proposed for monitoring the process variance in the last few decades.

Teng MT, Teh SY, Khaw KW, Chew XY, Yeong WC RT&A, No 3 (63) MODIFIED S CHARTS FOR A FINITE HORIZON PROCESS_Volume 16, September 2021

Page [8] proposed a one-sided cumulative sum (CUSUM) S chart based on the subgroup range. An exponentially weighted moving average (EWMA) S chart was then developed by Crowder and Hamilton [9] based on the logarithmic transformation of sample variance. Shu and Jiang [10] discussed a new EWMA chart to monitor the process standard deviation, where the latter chart's performances are better than the former chart. Klein [11] modified the conventional S chart by approaching the equal and unequal tail chi-square distribution probabilities. The modified S chart from Khoo [12] can circumvent the drawbacks of the conventional S chart by adjusting the type I error. Rakitzis and Antzoulakos [13] improved the S chart by varying the sample size and sampling interval (VSSI). This chart was then surpassed by the new proposed VSSIt chart with three sample intervals [14]. Kuo and Lee [15] designed the S chart with one of the best adaptive strategy, i.e. variable parameter strategy while Adeoti and Olaomi [16] investigated a moving average S chart. Moreover, Abujiya et al. [17] and Costa and Neto [18] suggested a new combined Shewhart-CUSUM S and variable charting statistics S charts, respectively.

Most of the traditional control charting techniques are implemented for a mass production process, which means its lot sizes are large. This process can be called an infinite horizon process. When dealing with low-volume and high-variety production, a finite horizon process arises. The finite horizon process has received great attention in the last decade as many companies have become more flexible and specialized in their products and services, based on the frequent changes in demand. A well-known example of the finite horizon process is the Just-in-Time manufacturing setting, which emphasizes the minimization of surplus inventory, time of waiting and costs of overproduction. Numerous research works on a finite horizon process were extended to a wide variety of control charts. For instance, CUSUM and variable sampling interval charts for monitoring the process mean in a finite horizon process were discussed by Nenes and Tagaras [19] and Nenes et al. [20], respectively. The Shewhart t and the EWMA t charts for a finite horizon process were suggested by Celano et al. [21] to address the problems of the estimation error of the process standard deviation due to the availability of limited reliable historical data. According to Amdouni et al. [22], their proposed variable sampling interval coefficient of variation short-run chart has better performance than the standard coefficient of variation short-run chart of Castagliola et al. [23]. More recently, Chong et al. [24] and Chew et al. [25] recommended a variable sample size Hotelling's T2 and run rules T2 charts for monitoring the multivariate finite horizon process.

Tuprah and Ncube [26] indicated that the S chart has better performance than the R chart, for the detection of small to moderate shifts in the standard deviation, when the sample sizes increase. Thus, monitoring the process standard deviation in a finite horizon process is considered very important in Statistical Process Control. However, none of the studies is available on the S chart for a finite horizon process in the existing literature. This makes it difficult for quality engineers who wish to monitor the process standard deviation in a finite horizon process. This paper aims to fill the gap in research by proposing the modified S charts in a finite horizon process. The numerical performance of the proposed charts will be measured in terms of the truncated average run length (TARL) and truncated standard deviation of the run length (TSDRL) criteria, for monitoring both the upward and downward shifts. The remainder of the sections are organized as follows: Section 2 shows the properties of the classical S chart. Section 3 discusses the design of the two one-sided modified S charts for monitoring a finite horizon process. The derivations of the formulae and algorithms to compute the TARL and TSDRL values are illustrated in Section 4. Statistical performances of the proposed charts are enumerated in Section 5. Lastly, the research findings and suggestions for future research are shown in the last section.

II. Methods

I. Properties of Classical S Chart

Montgomery [27] introduced the process variability that can be monitored with the sample standard deviation of the classical S chart, which is based on the ±3a limits underlying normal distribution.

Teng MT, Teh SY, Khaw KW, Chew XY, Yeong WC RT&A, No 3 (63)

MODIFIED S CHARTS FOR A FINITE HORIZON PROCESS_Volume 16, September 2021

Let {Xii, Xi2, ..., X«} , for i = 1, 2, ..., I, be a sample of n independent random variables, having a

normal N)distribution, where — is the process mean and S02 is the nominal process

variance. When the standard deviation, s of a process, is known, the upper control limit (UCL), centerline (CL) and lower control limit (LCL) can be computed as [27]:

UCL = c4s + 3aJ 1 - c42 (1)

CL = cs (2)

and

LCL = c4s - 3< 1 - c42, (3)

where c4 is a constant that depends on the sample size n, which can be obtained from Montgomery [27].

If s is unknown, then it can be estimated through analyzing past data. Assume that there are m preliminary samples, each of size n and let Si be the standard deviation of the ith sample. The average sample standard deviation is

_ i m

S = - £ Si, i = 1,2,!, m (4)

_ m i=1

S

The statistics —is an unbiased estimator of s . Thus, the UCL, CL and LCL of the S chart

can be obtained as

UCL = S + 3 — >/l-

- „S L 2

-c42 (5)

C4

CL = S (6)

LCL = S - 3—<Jl - c42 (7)

C4

Subsequently, the sample standard deviation of the S chart can be denoted as

S, =

¿1Ç ( - * )2

(8)

where Xi is the mean of sample i. An out-of-control signal is indicated when Si is being plotted outside the UCL or LCL.

II. The One-Sided Modified S Charts in a Finite Horizon Process

An industrial finite horizon process is scheduled to generate a small lot of N parts with finite length H, where I refers to the number of scheduled inspections within H. Subsequently, the sampling frequency between two consecutive inspections is denoted as h = H/(I + 1) hours due to absence of inspection at the end of the process. With the subgroup {Xii, Xi2, ..., X;«} defined in Section 2, the

1

UCL and LCL of the one-sided modified S control charts with in-control ARL (ARLo) equal to — are given as [11]

n-1,d)

UCL =

and

n -1

(9)

LCL =

s

«-1,1-0 )

(10)

where Xl-w and

n-1

n-iq /in_11_q denote the 100 0 th percentile of the chi-square distribution with n - 1

degrees of freedom and s2 is the process variance. Note that 0 <6 < 1 is selected to satisfy the desired in-control TARL (TARLo) value. Additionally, if the computed LCL value is negative, then the value is rounded up to zero since Si > 0.

III. Performance Measures of the Modified S Charts in a Finite Horizon Process

The statistical performance of the control chart is measured by average run length (ARL) and standard deviation of the run length (SDRL) criteria in an infinite horizon process monitoring. For monitoring a finite horizon process, the ARL criterion is replaced by TARL and TSDRL criteria. This is because the chart's performance measure must be a function of the finite number I of scheduled inspections. TARL can be denoted as the average number of plotted samples in the chart up till a signal is given or up till the process is completed, whichever occurs first. According to Nenes and Tagaras [19], the TARL value equals I + 1 if the production run is completed without detecting any signal in the I inspections. The TARL and TSDRL values of the modified S chart are given as

1 1 - B1+1

TARL = (1 - B)Z lB-1 + (I + 1)B =—-B (11)

i=1 1 — B

and

M-b2 1) - (i-b) b 1 (i+2i)

TSDRL = ^-—------, (12)

i-b

respectively, where b represents the probability of Type-II error of the chart and its value can be obtained as ¡5 = 1 — F 2 (LCL) for the downward case and f} = F 2 (UCL) for the upward case. Here, F 2 ( • ) is the cumulative distribution function (cdf) of a non-central chi-square random variable.

III. Results

Tables 1 - 4 display the TARLi and TSDRLi values for the upward and downward modified S charts in a finite horizon process, for monitoring the upward and downward shifts, when sample size n e {5, 7, 10, 15}, I e{10, 20, 30, 40, 50}, d G {1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 2.0} (for the upward case) and d G {0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9} (for the downward case). Note that when d = 1.0 indicates the process is in-control, where the TARLo = I. The results show that when the 9 value, which is used to compute the UCL and LCL, is decreasing when the I value increases. For example, in Table 1, 9 = 0.0193, 0.0050, 0.0022, 0.0013 and 0.0008 when I = 10, 20, 30, 40 and 50. In addition, another notable trend observed is that the larger shift 8 provides smaller TARLi and TSDRLi values regardless of the I and n values. An example is shown for monitoring the upward shifts, in Tables 1 and 2, for n e {5, 7, 10, 15} and I = 10, where the TARLi e {(8.81, 8.56, 8.23, 7.77), (3.64, 2.85, 2.19, 1.65), (1.76, 1.42, 1.19, 1.06)} and TSDRLi e {(3.34, 3.45, 3.56, 3.68), (2.79, 2.20, 1.60, 1.03), (1.15, 0.77, 0.48, 0.25)}, when d G {1.1, 1.5, 2.0}. Another example is shown for monitoring the downward shifts, in Tables 3 and 4, for I e {10, 20, 30, 40, 50} and n = 10, the TARLi e {(1.53, 2.89, 4.50, 6.30, 8.76), (5.01, 12.02, 20.21, 28.47, 37.79), (9.06, 18.85, 28.79, 38.64, 48.70)} and TSDRLi e {(0.91, 2.25, 3.95, 5.74, 8.15), (3.46, 7.35, 10.91, 14.23, 17.11), (3.20, 5.03, 6.37, 7.67, 8,54)}, when d G {0.5, 0.7, 0.9}. When n and d values are fixed, the TARLi and TSDRLi values increase consistently by increasing the I value. For

example, in Tables 1 and 2, for n = 10, S = 1.3, the TARLi e {4.10, 7.57, 11.14, 14.40, 18.16} and TSDRLi e {3.05, 6.02, 9.03, 11.88, 14.98}, when I e {10, 20, 30, 40, 50}.When I and S values are fixed while n value increases, the TARLi value decreases. For example, in Table 3, for I = 30 and S = 0.8, TARLi e {28.68, 27.73, 26.03, 22.70} when n e {5, 7, 10, 15}. Figures 1 and 2 present the graphical view of TARLi values for the upward and downward modified S charts.

IV. Conclusion

In the existing literature, no attempt has been made to monitor the process variability in a finite horizon process. This paper proposes the one-sided upward and downward modified S charts for monitoring a finite horizon process. The performance of the proposed charts is evaluated in terms of the TARLi and TSDRLi criteria. The formulas of control limits for the modified S charts, TARLi and TSDRLi are discussed. Different parameter combinations, in terms of the sample size, the number of inspections and process shifts are applied to the proposed charts, for both the upward and downward cases. The results showed that the sample size and the number of inspections affected the TARLi and TSDRLi values, for monitoring the different upward and downward process shifts in a finite horizon process. Additionally, the two one-sided modified S charts can provide unbiased performance, in terms of TARLi and TSDRLi criteria. In future research, the study of proposed charts can be extended in the case of estimated parameters.

Funding

This work was funded by the Ministry of Higher Education Malaysia, Fundamental Research Grant Scheme [Grant Number 203.PMGT.6711755], for the Project entitled "A New Hybrid Model for Monitoring the Multivariate Coefficient of Variation in Healthcare Surveillance".

Declaration of Conflict Interests The Author(s) declare(s) that there is no conflict of interest.

Table 1. TARLi values of the upward modified S chart when I e {10, 20, 30, 40, 50}, n e {5, 7, 10, 15} and d e {1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 2.0}

d

9 I n 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0

0.0193 10 5 10.00 8.81 7.31 5.82 4.58 3.64 2.98 2.51 2.18 1.94 1.76

7 10.00 8.56 6.71 5.00 3.71 2.85 2.30 1.94 1.70 1.54 1.42

10 10.00 8.23 5.98 4.10 2.89 2.19 1.78 1.53 1.37 1.26 1.19

15 10. 00 7.77 5.03 3.12 2.14 1.65 1.39 1.24 1.15 1.09 1.06

0.0050 20 5 19.98 18.06 15.00 11.49 8.41 6.15 4.64 3.66 3.01 2.56 2.24

7 19.98 17.64 13.77 9.64 6.48 4.50 3.35 2.65 2.20 1.90 1.69

10 19.98 17.08 12.19 7.57 4.70 3.20 2.39 1.93 1.64 1.46 1.33

15 19. 98 16. 22 10. 03 5.37 3.18 2.19 1.70 1.43 1.27 1.17 1.11

0.0022 30 5 30.00 27.58 23.10 17.44 12.25 8.50 6.11 4.63 3.68 3.05 2.61

7 30.00 27.04 21.27 14.48 9.18 6.00 4.24 3.22 2.59 2.18 1.90

10 30.00 26.28 18.83 11.14 6.41 4.08 2.91 2.25 1.86 1.61 1.44

15 30. 00 25.12 15.39 7.59 4.11 2.66 1.96 1.59 1.37 1.24 1.16

0.0013 40 5 39.95 37.03 31.08 23.13 15.74 10.51 7.30 5.39 4.20 3.42 2.89

7 39.95 36.35 28.63 19.03 11.55 7.24 4.95 3.67 2.89 2.39 2.06

10 39.95 35.41 25.32 14.40 7.85 4.79 3.31 2.50 2.02 1.72 1.52

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

15 39. 95 33.93 20.55 9.54 4.88 3.02 2.16 1.70 1.44 1.29 1.19

0.0008 50 5 49.99 46.79 39.66 29.47 19.68 12.75 8.61 6.21 4.75 3.81 3.17

7 49.99 46.03 36.67 24.20 14.25 8.62 5.72 4.14 3.20 2.61 2.21

10 49.99 44.97 32.54 18.16 9.49 5.58 3.73 2.75 2.19 1.83 1.60

15 49.99 43.27 26.46 11.80 5.73 3.41 2.36 1.82 1.52 1.34 1.22

Table 2. TSDRLi values of the upward modified S chart when I e {10, 20, 30, 40, 50}, n e {5, 7, 10, 15} and d £ {1.1, 1.2, 1.3, 1.4, 1.5, 1.6, 1.7, 1.8, 1.9, 2.0}

d

9 I n 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0

0.0193 10 5 2.48 3.34 3.75 3.68 3.29 2.79 2.30 1.90 1.59 1.34 1.15

7 2.48 3.45 3.77 3.46 2.83 2.20 1.71 1.35 1.09 0.91 0.77

10 2.48 3.56 3.71 3.05 2.23 1.60 1.18 0.90 0.71 0.58 0.48

15 2.48 3.68 3.47 2.42 1.55 1.03 0.73 0.54 0.41 0.32 0.25

0.0050 20 5 3.60 5.70 7.12 7.29 6.43 5.16 3.99 3.09 2.45 2.00 1.67

7 3.60 6.00 7.33 6.88 5.38 3.87 2.79 2.08 1.62 1.31 1.08

10 3.60 6.33 7.36 6.02 4.04 2.64 1.83 1.34 1.03 0.82 0.67

15 3.60 6.73 7.00 4.59 2.62 1.62 1.09 0.79 0.59 0.45 0.36

0.0022 30 5 4.41 7.69 10.31 10.92 9.56 7.41 5.47 4.08 3.14 2.50 2.05

7 4.41 8.17 10.77 10.36 7.88 5.38 3.70 2.67 2.03 1.61 1.31

10 4.41 8.74 10.98 9.03 5.74 3.54 2.35 1.68 1.26 0.99 0.80

15 4.41 9.45 10.60 6.72 3.57 2.10 1.37 0.96 0.71 0.54 0.43

0.0013 40 5 5.23 9.66 13.49 14.51 12.54 9.39 6.69 4.85 3.67 2.88 2.34

7 5.23 10.32 14.19 13.75 10.15 6.64 4.42 3.13 2.34 1.83 1.47

10 5.23 11.11 14.58 11.88 7.20 4.26 2.76 1.93 1.44 1.11 0.89

15 5.23 12.12 14.13 8.64 4.35 2.47 1.58 1.09 0.80 0.61 0.47

0.0008 50 5 5.74 11.23 16.42 18.15 15.71 11.54 8.01 5.68 4.22 3.27 2.63

7 5.74 12.06 17.44 17.31 12.63 8.02 5.20 3.61 2.66 2.05 1.64

10 5.74 13.07 18.12 14.98 8.82 5.05 3.19 2.20 1.61 1.23 0.98

15 5.74 14.41 17.81 10.80 5.21 2.87 1.80 1.23 0.89 0.67 0.52

Table 3. TARLi values of the upward modified S chart when I e {10, 20, 30, 40, 50}, n e {5, 7, 10, 15} and d e {0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9}

d

9 I n 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

0.0193 10 5 1.00 1.03 1.47 2.62 4.46 6.37 7.87 8.89 9.56 10.00

7 1.00 1.00 1.06 1.47 2.57 4.49 6.62 8.28 9.35 10.00

10 1.00 1.00 1.00 1.08 1.53 2.76 5.01 7.40 9.06 10.00

15 1.00 1.00 1.00 1.00 1.10 1.64 3.23 6.07 8.61 10.00

0.0050 20 5 1.00 1.37 3.13 6.94 11.60 15.16 17.39 18.71 19.50 19.98

7 1.00 1.01 1.38 2.83 6.27 11.23 15.34 17.86 19.24 19.98

10 1.00 1.00 1.02 1.40 2.80 6.44 12.02 16.44 18.85 19.98

15 1.00 1.00 1.00 1.03 1.42 2.95 7.38 13.94 18.20 19.98

0.0022 30 5 1.01 1.98 5.71 13.03 20.16 24.70 27.26 28.68 29.51 30.00

7 1.00 1.05 1.89 4.77 11.39 19.35 24.79 27.73 29.23 30.00

10 1.00 1.00 1.08 1.85 4.50 11.33 20.21 26.03 28.79 30.00

15 1.00 1.00 1.00 1.09 1.82 4.59 12.66 22.70 28.04 30.00

0.0013 40 5 1.04 2.69 8.70 19.57 28.78 34.13 36.99 38.55 39.43 39.95

7 1.00 1.12 2.44 6.92 16.92 27.57 34.15 37.48 39.12 39.95

10 1.00 1.00 1.16 2.31 6.30 16.51 28.47 35.51 38.64 39.95

15 1.00 1.00 1.00 1.15 2.21 6.28 18.14 31.44 37.78 39.95

0.0008 50 5 1.10 3.71 12.99 27.78 38.48 44.17 47.08 48.62 49.49 49.99

7 1.00 1.23 3.20 9.96 24.04 36.95 44.11 47.55 49.18 49.99

10 1.00 1.00 1.26 2.91 8.76 23.14 37.79 45.48 48.70 49.99

15 1.00 1.00 1.00 1.24 2.71 8.52 24.96 41.00 47.81 49.99

Table 4. TSDRLi values of the upward modified S chart when I e {10, 20, 30, 40, 50}, n e {5, 7, 10, 15} and d £ {0.1, 0.2, 0.3, 0.4, 0.5, 0.6, 0.7, 0.8, 0.9}

8

9 I n 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0

0.0193 10 5 0.00 0.19 0.84 2.01 3.24 3.76 3.66 3.30 2.87 2.48

7 0.00 0.01 0.24 0.84 1.96 3.25 3.77 3.55 3.02 2.48

10 0.00 0.00 0.03 0.29 0.91 2.13 3.46 3.74 3.20 2.48

15 0.00 0.00 0.00 0.05 0.34 1.03 2.50 3.72 3.42 2.48

0.0050 20 5 0.02 0.71 2.58 5.67 7.31 7.08 6.16 5.17 4.31 3.60

7 0.00 0.10 0.73 2.27 5.24 7.26 7.04 5.85 4.62 3.60

10 0.00 0.00 0.16 0.75 2.25 5.35 7.35 6.64 5.03 3.60

15 0.00 0.00 0.01 0.18 0.77 2.39 5.92 7.31 5.60 3.60

0.0022 30 5 0.09 1.39 5.11 9.88 10.92 9.66 7.98 6.51 5.33 4.41

7 0.00 0.24 1.30 4.22 9.16 10.97 9.62 7.56 5.77 4.41

10 0.00 0.01 0.30 1.25 3.95 9.13 10.91 8.91 6.37 4.41

15 0.00 0.00 0.02 0.31 1.22 4.05 9.73 10.43 7.24 4.41

0.0013 40 5 0.19 2.13 7.94 13.90 14.16 12.00 9.70 7.80 6.34 5.23

7 0.00 0.37 1.88 6.34 13.04 14.38 11.99 9.17 6.90 5.23

10 0.00 0.02 0.42 1.73 5.74 12.87 14.23 11.03 7.67 5.23

15 0.00 0.00 0.04 0.42 1.63 5.72 13.48 13.36 8.81 5.23

0.0008 50 5 0.32 3.18 11.73 18.00 16.88 13.74 10.88 8.66 7.00 5.74

7 0.00 0.53 2.66 9.25 17.27 17.37 13.79 10.28 7.63 5.74

10 0.00 0.04 0.57 2.36 8.15 17.01 17.11 12.60 8.54 5.74

15 0.00 0.00 0.06 0.55 2.15 7.92 17.50 15.79 9.92 5.74

10 8

l 4

2 0

1= 10

1,0 1,1 1,2 1,3 1,4 1,5 1,6 1,7 1,8 1,9 2,0

delta

.........n=5 -----n=7 -.-n=10--n=15

20 18 16 14 12 10 8 6 4 2 0

1= 20

\ - • x \ \ ••.

v- ... \

— S ^

1,0 2,0 3,0 4,0 5,0 6,0 7,0

delta

• n=5

• n=7

n=10

1,0 9,0 10,0 11,0

• 11=15

30 25 20 15 10 5 0

1= 30

\ - , \ .......

- 7 «. .......

1 = 40

1,0 2,0 3,0 4,0 5,0

6,0 delta

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

7,0 8,0 9,0 10,0 11,0

40 35 30

H 25 ^ 20

H 15

10 5 0

\v\\

• •

1,0 2,0 3,0 4,0 5,0 6,0 7,0

delta

■ n=5

• n=7

n=10

■ n=15

n=5

• n=7

n=10

;,0 9,0 10,0 11,0

■ n=15

1= 50

50 45 40 35 J 30 % 25 H 20 15 10 5 0

\ v^

1,0 2,0 3,0 4,0 5,0 6,0 7,0

delta

1,0 9,0 10,0 11,0

■n=5

• n=7

n=10

■ 11=15

Figure 1. Comparison of TARLi values for the upward modified S chart, when / £ {10, 20, 30, 40, 50), n e {5, 7,10,15} and 8 £ {1.1,1.2,1.3,1.4,1.5,1.6,1.7,1.8,1.9, 2.0}

10 8

l 4

2 0

1= 10

........

0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0

delta

.........n=5 -----n=7 ---11=10--n=15

1 = 20

20 15 10 5 0

..........Kg*»

.......... "7

..... /

/

/ / >

0,1

0,2 0,3 0,4 0,5 0,6 0,7 0,! delta

0,9 1,0

• n=5

■ n=7

n=10

■ n=15

30 25 20 15 10 5 0

0,1

1 = 30

1 = 40

,.........

' ' /

/ /

'' / ' ' ■' /

'' / /

40 35 30

J 25 ^ 20 H 15 10 5 0

............

........ - V /

0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0 delta

0,1

/'V /

0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0 delta

• n=5

■ n=7

n=10

■ 11=15

n=5

■ n=7

n=10

■ 11=15

50 45 40 35

30 < 25

H 20 15 10 5 0

1 = 50

.......•¿••»•J?1

..............

/

" /

✓ /

/

0,1 0,2

' /

/ / '' /

/• '

0,3 0,4 0,5 0,6 0,7 0,8 0,9 delta

1,0

■ n=5

■ n=7

n=10

■ n=15

Figure 2. Comparison of TARLi values for the downward modified S chart, when / £ {10,20, 30,40, 50}, n e {5,7, 10, 15} and 8 6 ¡0.1,0.2,0.3,0.4,0.5,0.6,0.7,0.8,0.9}

References

[1] Noorian, S., Ahmadabadi, M. N. (2018). The use of the extended generalized lambda distribution

for controlling the statistical process in individual measurements. Statistics, Optimization & Information Computing, 6:536-546.

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

[2] Khaw, K. W. and Chew, X. Y. (2019). A re-evaluation of the run rules control charts for monitoring

the coefficient of variation. Statistics, Optimization & Information Computing, 7: 716-730.

[3] Li, C. I., Pan, J. N. and Huang, M. H. (2019) A new demerit control chart for monitoring the quality

of multivariate Poisson processes. Journal of Applied Statistics, 46: 680-699.

[4] Chew, X. Y., Khoo, M. B. C., Khaw, K. W., Yeong, W. C. and Chong, Z. L. (2019). A proposed variable parameter control chart for monitoring the multivariate coefficient of variation. Quality and Reliability Engineering International, 35: 2442-2461.

[5] Shongwe, S. C., Malela-Majika, J.-C., and Castagliola, P. (2020). On monitoring the process mean

of autocorrelated observations with measurement errors using w-of-w runs-rules scheme. Quality and Reliability Engineering International, 36: 1144-1160.

[6] Chew, X. Y., Khaw, K. W. and Yeong, W. C. (2020). The efficiency of run rules schemes for the multivariate coefficient of variation: A Markov chain approach. Journal of Applied Statistics, 47: 460-480.

[7] Castagliola, P., Achouri, A., Taleb. H., Celano, G. and Psarakis, P. (2015). Monitoring the coefficient of variation using a variable sample size control chart. The International Journal of Advanced Manufacturing Technology, 80: 1561-1576.

[8] Page, E. S. (1963). Controlling the standard deviation by CUSUMs and warning lines. Technometrics, 5: 307-315.

[9] Crowder, S. V., and Hamilton, M. D. (1992). An EWMA for monitoring a process standard deviation. Journal of Quality Technology, 24: 12-21.

[10] Su, L. and Jiang, W. (2008). A new EWMA chart for monitoring process dispersion. Journal of Quality Technology, 40: 319-331.

[11] Klein, M. (2000). Modified S-charts for controlling process variability. Communications in Statistics - Simulation and Computation, 29: 919-940.

[12] Khoo, M. B. C. (2005). A modified S Chart for the process variance. Quality Engineering, 17: 567577.

[13] Rakitzis, A. C. and Antzoulakos, D. L. (2011). On the improvement of one-sided S control charts. Journal of Applied Statistics, 38: 2839-2858.

[14] Khoo, M. B. C., See, M. Y., Chong, N. L. and Teoh, W. L. (2019). An improved variable sample size and sampling interval S control chart. Quality and Reliability Engineering International, 35: 392-404.

[15] Kuo, T. and Lee, P. (2013). Design of adaptive S control charts. Journal of Statistical Computation and Simulation, 83: 2002-2014.

[16] Adeoti, O. A. and Olaomi, J. O. (2016). A moving average S control chart for monitoring process variability. Quality Engineering, 28: 212-219.

[17] Abujiya, M. R., Riaz, M. and Lee, M. H. (2016). A new combined Shewhart-Cumulative sum S chart for monitoring process standard deviation. Quality and Reliability Engineering International, 32: 1149-1165.

[18] Costa, A. F. B. and Neto, A. F. (2017). The S chart with variable charting statistic to control bi and trivariate processes. Computers & Industrial Engineering, 113: 27-34.

[19] Nenes, G. and Tagaras, G. (2010). Evaluation of CUSUM charts for finite-Horizon processes. Communications in Statistics - Simulation and Computation, 39: 578-597.

[20] Nenes, G., Castagliola, P., Celano, G. and Panagiotidou, S. (2014). The variable sampling interval control chart for finite-horizon processes. IIE Transactions, 46: 1050-1065.

Teng MT, Teh SY, Khaw KW, Chew XY, Yeong WC RT&A, No 3 (63) MODIFIED S CHARTS FOR A FINITE HORIZON PROCESS_Volume 16, September 2021

[21] Celano, G., Castagliolab, P., Trovatoc, E. and Fichera, S. (2011). Shewhart and EWMA t control charts for short production runs. Quality and Reliability Engineering International, 27: 313-326.

[22] Amdouni, A., Castagliola, P., Taleb, H. and Celano, G. (2017). A variable sampling interval Shewhart control chart for monitoring the coefficient of variation in short production runs. International Journal of Production Research, 55: 5521-5536.

[23] Castagliola, P., Amdouni, A., Taleb, H. and Celano, G. (2015). One-sided Shewhart-type charts for monitoring the coefficient of variation in short production runs. Quality Technology & Quantitative Management, 12: 53-67.

[24] Chong, N. L., Khoo, M. B. C., Haq, A. and Castagliola, P. (2019). Hotelling's T2 charts with fixed and variable sample sizes for monitoring short production runs. Quality and Reliability Engineering International, 35: 14-29.

[25] Chew, X. Y., Khoo, M. B. C., Khaw, K. W. and Lee, M. H. (2021). An improved Hotelling's T2 chart for monitoring a finite horizon process based on run rules schemes: A Markov-chain approach. Applied Stochastic Models in Business and Industry, 37: 577-591.

[26] Tuprah, K. and Ncube, M. (1987). A Comparison of dispersion quality control charts. Sequential Analysis, 6: 155-163.

[27] Montgomery, D. C. (2013). Statistical Quality Control: A Modern Introduction. John Wiley & Sons, Inc.

i Надоели баннеры? Вы всегда можете отключить рекламу.