Научная статья на тему 'Impacts of Effective Communication towards Performance of Construction Organization'

Impacts of Effective Communication towards Performance of Construction Organization Текст научной статьи по специальности «Строительство и архитектура»

CC BY
1417
292
i Надоели баннеры? Вы всегда можете отключить рекламу.
Ключевые слова
construction organization / construction professionals / effective communication / construction performance

Аннотация научной статьи по строительству и архитектуре, автор научной работы — Mohammed Isah Leje, Mohammed Alhaji Kasimu, Asimiyu Folaranmi Kolawole

The purpose of this study is to examine the significant impacts of effective communication towards the performance of the construction organization. The objectives of the study include to identify impacts of effective communication and evaluate the degree of agreement to which effective communication influence construction organization from construction contractors and consultants’ viewpoint. A sample of 200 construction contractors and consultants were randomly selected from the Bureau of Public Procurement (BPP) database, out of which the responses rates received were 160 (80 %). Data analysis include Relative Importance Index (RII) for ranking comparison among the construction professionals on a scale range from 1-5 for rating their responses. Kendall’s coefficient of concordance was used to evaluate the degree of agreement between construction professionals related to the ranking of each group of the practices. The results of RII revealed that improve productivity in the organization, reduce project delay, better safety precautions on construction sites, better use of materials and equipment and improve professional commitment to the organization are the top five impacts of effective communication towards the performance of construction organization. The results of Kendall’s coefficient of concordance revealed that a high agreement between construction professionals occurred in the ranking of the impacts of effective communication towards the performance of the construction organization. The findings revealed that effective communication help to facilitate better understanding among all parties in the construction organization. It was recommended that stakeholders in the construction organization should adopt the use of effective communication tools and instruments for organizational performance.

i Надоели баннеры? Вы всегда можете отключить рекламу.
iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.
i Надоели баннеры? Вы всегда можете отключить рекламу.

Текст научной работы на тему «Impacts of Effective Communication towards Performance of Construction Organization»

Impacts of Effective Communication towards Performance of Construction Organization

Mohammed Isah Leje , Mohammed Alhaji Kasimu 2, Asimiyu Folaranmi Kolawole 2

2 The Federal Polytechnic Bida

KM 1.5, Doko Road, Bida, Niger State, Nigeria

Abstract. The purpose of this study is to examine the significant impacts of effective communication towards the performance of the construction organization. The objectives of the study include to identify impacts of effective communication and evaluate the degree of agreement to which effective communication influence construction organization from construction contractors and consultants' viewpoint. A sample of 200 construction contractors and consultants were randomly selected from the Bureau of Public Procurement (BPP) database, out of which the responses rates received were 160 (80 %). Data analysis include Relative Importance Index (RII) for ranking comparison among the construction professionals on a scale range from 1-5 for rating their responses. Kendall's coefficient of concordance was used to evaluate the degree of agreement between construction professionals related to the ranking of each group of the practices. The results of RII revealed that improve productivity in the organization, reduce project delay, better safety precautions on construction sites, better use of materials and equipment and improve professional commitment to the organization are the top five impacts of effective communication towards the performance of construction organization. The results of Kendall's coefficient of concordance revealed that a high agreement between construction professionals occurred in the ranking of the impacts of effective communication towards the performance of the construction organization. The findings revealed that effective communication help to facilitate better understanding among all parties in the construction organization. It was recommended that stakeholders in the construction organization should adopt the use of effective communication tools and instruments for organizational performance.

Keywords: construction organization; construction professionals; effective communication; construction performance.

INTRODUCTION

The performance of construction organization constitutes an effective and efficient project delivery which has a great influence on industrial growth and production of infrastructure necessary to improve the living standards of a country [1]. However, for such to occur, the construction organization depends on the quality of relationships between the clients, professionals, contractors, subcontractors, technical workers and regulatory bodies [5]. This correlation is basically due to the fact that all the various stages of construction rely on the construction parties transferring appropriate and relevant information to planned, scheduled and controlled a project [12]. This according to [4, 9] emphasized that construction is an information-intensive industry since hun-

DOI: 10.22178/pos.49-4

LCC Subject Category: H1-99

Received 28.06.2019 Accepted 30.08.2019 Published online 31.08.2019

Corresponding Author: Mohammed Isah Leje isahleje5@yahoo.com

© 2019 The Authors. This article is licensed under a Creative Commons Attribution 4.0 License

dreds and thousands of piece of information need to be transferred and exchanged between various departments/units during the project life-cycle. Therefore, each department/unit in construction organization is responsible for disseminating the related information needed to formulate effective communication.

An effective communication plays a vital role in all stages of construction project which involves the exchange and flow of information and ideas from one person to another [2, 8]. Authors [9] asserted that as a construction project unfolds, communication occur in various directions which revolves from the organization to top management (upward communication), within the project teams (lateral communication), from superior to subordinate (downward communication)

and from subordinates to superior (horizontal communication). For instance, an architect prepares a general outline of client requirements after carrying out feasibility studies with the other consultants and communicates it to the rest of the members of the design team for collective action. As soon as the client approval is obtained, the architect and engineer start preparing the working drawings, schedules and specifications and at the same time seeking the opinion of the quantity surveyor who sees to the cost implication of the project to see if the project design is still within the approved budget. This goes on to all stages until completion of a project is achieved. Despite these roles, there seems little doubt that effective communication plays a vital role in the performance of construction organization. Hence, there is need for an extensive studies to be conducted on the impacts of effective communication towards performance of construction organization, taking into accounts construction contractors and consultants' views.

Accordingly, this study first presents the findings from relevant literatures in relation to effective communication. Next, the research methodology followed by discussions through the findings presented on the impacts of effective communications from construction contractors and consultants' viewpoint. The final section summarizes the conclusion derived from the research findings and present recommendation.

Communication plays a vital role in all stages of construction project delivery, from design stage through production, organization and management. Most of the researchers agreed that effective communication in construction organization could go a long way to deliver projects of desired quality, cost and on schedule time [13, 7, 8, 12, 18]. Therefore, the impacts of effective communication in the construction industry cannot be under-rated as they have the potential of eliminating inefficiencies arising from poorly constructed projects. For these reason, [12] acknowledged that if there is an effective communication between project team, accurate information will be quickly disseminated and consensus decisions achieved. Thus, prevent some ripple effects that may have been caused from misconception.

Authors [13] investigated communication in the construction organization and found out that by adopting effective communication during project delivery, it can help in meeting the predeter-

mined cost and time of the project. Researcher [18] revealed that effective communication can help to achieve better time and cost management in producing a successful project. Authors [7] stated that lack of effective communication in the construction organization within a bilingual workforce raises a number of safety issues. Therefore, this implies that effective communications are geared towards performance of construction organization.

From the foregoing studies, the impacts of an effective communication in construction organization were identified, which were related to impacts on organizational efficiency and effectiveness. However, the study is geared towards determining the most significant impacts based on construction contractors and consultants' views. Hence, it is the gap of determining the most significant impacts of effective communication towards construction organization performance that is the motivation for this study.

RESEARCH METHODOLOGY

In order to collect the data, this study adopted qualitative approach before conducting quantitative analysis. The qualitative data of the study were based on a literature review and consisted of 20 impacts of effective communication which have been examined by previous researchers. A preliminary study was first carried out on a small scale of respondents to ensure clarity and avoidance of double barrel questions. Four of construction experts having strong background of construction business participated in the preliminary study. In total, 14 impacts of an effective communication as shown in Table 1, were selected by experts as the impacts of effective communication in Nigeria. Accordingly, the operational measures of these impacts were categorized into two groups of impacts on organizational efficiency and effectiveness. These impacts were used to construct a structured questionnaire for the pilot study. A total of thirty construction contractors and consultants participated in the pilot study. The respondents suggested few changes to the questionnaire regarding the wordings of the questions. The questionnaire was then modified based on the feedback, before it was finally used at the data collection stage.

Table 1 - Impacts of effective communication towards performance of construction organization

Impacts Authors

A. Impacts on organizational efficiency

A1 Improve productivity of an organization [81

A2 Reduce disputes in the organization [61

A3 Minimized accident rates on construction sites [151

A4 Better safety precautions on construction sites [151

A5 Improve professional commitment to the organization [81

A6 Increase organizational stability and flexibility [181

A7 Improve work quality [181

A8 Reduce project delay [141

B. Impacts on organizational effectiveness

B1 Improve workmanship [21

B2 Better use of materials and equipment [51

B3 Less supervision [81

B4 Reduce rework from unsatisfactory work done [181

B5 Reduce wastages of construction materials [21

B6 High performance and innovation [171

The questionnaire consists of two sections. Section A consist of respondents personal particulars such as; membership of professional bodies, years of experience, academic qualification and numbers of projects executed. In section B, each respondent was asked to rate the impact of effective communication on a five-point Likert scale ranging from 1 to 5, where 1 represents "Insignificant" and 5 represent "Very significant".

Sample structures

A sample of 200 construction contractors and consultants within F. C. T, Abuja was targeted in the survey, comprising 100 each of contractors

and consultants randomly drawn from the Bureau of Public Procurement (BPP) database. Though, there are several methods of administering a questionnaire survey, direct delivery of the questionnaire by hand was preferred using the members' directory. Table 2 shows a summary of the sample responses of the questionnaire survey. From table 2, the response rates were 80 (80 %) each for contractors and consultants respectively. This was considered adequate for analysis based on the assertion by [10] that the result of a survey could be considered as biased and of little importance if the return rate was lower than 30-40%.

Table 2 - Sample responses of he questionnaire survey

Professionals Number of questionnaire Percentage returned, %

Number administered Valid for analysis

1. Contractors 100 80 80

2. Consultants 100 80 80

Total 200 160

Cronbach's Alpha Reliability Test

Cronbach's Alpha coefficient test is used for evaluating the reliability of the instrument. The measure is considered to be reliable if the value of Cronbach's Alpha coefficient equals or exceeds 0.70 [11, 16]. In this study, the values of Cron-bach's Alpha Coefficient for the construct ranged from 0.783 to 0.867. Since these values were more than 0.7, the entire construct as well as the

variables was believed to have demonstrated a good reliability to be measured on the same latent trait and scale.

RESULTS AND DISCUSSION

The data was analyzed using the Relative Importance Index (RII) comparison of ranking among the construction contractors and consultants.

The performance of each parameter was evaluated based on the importance weighting and the proposed efficiency of each variable. From the responses, RII was calculated using the formula below (1):

5n + 4n + 3n + 2n + n Rll = —1-2-3-4-5

5(n + n2 + n + n + n )

(1)

where n1 represents the number of respondents who answered 'very significance', n2 represents the number of respondents who answered 'significance', n3 represents the number of respondents who answered 'moderately significance', n4 represents the number of respondents who answered 'less significance', ns represents the

number of respondents who answered 'insignificance'

The results of the RII from Table 3 shows that reduce project delay are ranked topmost by contractors and second by consultants. Also, improve productivity in the organization was ranked first by the consultants and second by contractors. Better safety precaution on construction sites was ranked third by contractors and consultants. Better use of materials and equipment was also ranked third by consultants and fourth by contractors. Also, improve professional commitment to the organization was ranked fourth by contractors and fifth by consultants. Improve workmanship was ranked sixth by contractors and fifth by consultants.

Table 3 - RII and ranks of contractors and consultants' responses

Construction organizations Contractors Consultants

Impacts S RII R S RII R

Impacts on organizational efficiency

Improve productivity in the organization 262 0.655 2 235 0.588 1

Reduce disputes in the organization 245 0.613 9 220 0.550 8

Minimized accident rates on construction sites 248 0.620 8 210 0.525 10

Better safety precautions on construction sites 260 0.650 3 225 0.563 3

Improve professional commitment to the organization 255 0.638 4 223 0.558 5

Increase organizational stability and flexibility 225 0.563 11 200 0.500 12

Improve work quality 240 0.600 10 218 0.545 9

Reduce project delay 265 0.663 1 230 0.575 2

Impacts on organizational effectiveness

Improve workmanship 252 0.630 6 223 0.558 5

Better use of materials and equipment 255 0.638 4 225 0.563 3

Less supervision 250 0.625 7 223 0.558 5

Reduce rework from unsatisfactory work done 225 0.563 11 207 0.518 11

Reduce wastages of construction materials 220 0.550 13 195 0.488 13

High performance and innovation 215 0.538 14 190 0.475 14

Notes: S - Sum of responses; RII - Relative Importance Index; R - Ranking

Consequently, in order to have a general agreement in the ranking of all the impacts, Rank Agreement Factor (RAF) and PRAF was used to quantitatively measure the agreement in the importance ranking among the contractors and consultants. This is in line with the suggestion by [3].

RAF =

RAF = ■

sQAEB N '

RAFmax - RAF RAF

: 100,

(2) (3)

where RAFmax - maximum RAF, N - total number of impacts, and EQEAB - sum of the order of ranking by contractors and consultants.

The RAF can be >1, with a higher factor implying greater disagreement while a RAF zero implies perfect agreement [3]. The results of RAF are shown in the fifth column of Table 4. For 14 impacts of effective communication, RAFmax is 2.000.

Table 4 - PRAF of all the contractors and consultants

Impacts Ctr Csl Sum RAF PRAF % R

Improve productivity in the organization 2 1 3 0.214 89.30 1

Reduce project delay 1 2 3 0.214 89.30 1

Better safety precautions on construction sites 3 3 6 0.429 78.55 3

Better use of materials and equipment 4 3 7 0.500 75.00 4

Improve professional commitment to the organization 4 5 9 0.643 67.85 5

Improve workmanship 6 5 11 0.786 60.7 6

Less supervision 7 5 12 0.857 57.15 7

iНе можете найти то, что вам нужно? Попробуйте сервис подбора литературы.

Reduce disputes in the organization 9 8 17 1.214 39.30 8

Minimized accident rates on construction sites 8 10 18 1.286 35.70 9

Improve work quality 10 9 19 1.357 32.15 10

Reduce rework from unsatisfactory work done 11 11 22 1.571 21.45 11

Increase organizational stability and flexibility 11 12 23 1.643 17.85 12

Reduce wastages of construction materials 13 13 26 1.857 7.15 13

High performance and innovation 14 14 28 2.000 0.00 14

Notes: RAF - ranking agreement factor; PRAF - percentage ranking agreement factor.

From the results of the PRAF in Table 4, top five impacts of an effective communication towards performance of construction organization are improve productivity in the organization, reduce project delay, better safety precautions on construction sites, better use of materials and equipment and improve professional commitment to the organization. These impacts are interrelated and have direct outcomes on the performance of construction organization. The results show you improve productivity in the organization as the topmost impacts of an effective communication. This agrees with the contention of [8] that effective communication may influence the productivity of an organization as it is managed by all departments/units in the organization. Reduce project delay was also revealed as the topmost impacts, which is in line with the opinion of [14] that effective communication are related to complete a project within time. The result also show you better safety precautions on construction sites as a significant impacts of an effective communication. This was corroborated by [15] asserting that effective communication results to satisfactory health and safety precautions on construction sites. Better use of materials and equipment was also revealed as one of the impacts of effective communication towards performance of construction organization. Author [5] acknowledged that effective communication brings about prudent use of resources in the construction organization. Improve professional commitment to the organization was also ranked as one of the significant impacts of an effective communication, which agrees with the contention of [8] that in order to foster professionalism

in the construction organization effective communication must be brought to the attention of all the parties involved in a project.

Kendall's Coefficient of Concordance

To evaluate the degree of agreement to which effective communication influence performance of construction organization, two hypotheses was formulated. To test this hypotheses written below, Kendall's coefficient of concordance (W) was performed to estimate the degree of agreement between construction contractors and consultant' views related to the ranking of each group of the impacts, and whether this agreement is statistically significant. The range of the value W is between 0 and 1 (1 represents the perfect agreement between construction contractors and consultants, while 0 represents completely no agreement between construction contractors and consultants).

H1. There is no degree of agreement between construction contractors and consultants towards the ranking of the impact of effective communication on organizational efficiency.

This category consist of eight impacts of effective communication. The results from Table 5, indicates that Kendall's coefficient is found to be 0.952 and the p-value is 0.000 which is below the threshold of 0.05 significance level. In conclusion, there is a significant and strong degree of agreement between construction contractors and consultants towards the ranking of the impact of effective communication on organizational efficiency.

Table 5 - Impacts on organizational efficiency

Construction organizations Contractors Consultants

Impacts S RII R S RII R

Impacts on organizational efficiency

Improve productivity in the organization 262 0.655 2 235 0.588 1

Reduce disputes in the organization 245 0.613 9 220 0.550 8

Minimized accident rates on construction sites 248 0.620 8 210 0.525 10

Better safety precautions on construction sites 260 0.650 3 225 0.563 3

Improve professional commitment to the organization 255 0.638 4 223 0.558 5

Increase organizational stability and flexibility 225 0.563 11 200 0.500 12

Improve work quality 240 0.600 10 218 0.545 9

Reduce project delay 265 0.663 1 230 0.575 2

Kendall's coefficient 0.952

Sig. 0.000

H2. There is no degree of agreement between construction contractors and consultants towards the ranking of the impact of effective communication on organizational effectiveness.

This category includes six impacts of an effective communication. The results from Table 6, indicates that Kendall's coefficient is found to be

The overall results of hypotheses testing revealed that a high agreement between construction contractors and consultants occurred in the ranking of the impacts of effective communication related to organizational efficiency and effectiveness. This was confirmed by high Kendall's coefficient obtained within each category.

CONCLUSION

Drawn from the results that shows five topmost impacts of effective communication towards performance of construction organization, it re-

0.993 and the p-value is 0.000 which is below the threshold of 0.05 significance level. In conclusion, there is a significant and strong degree of agreement between construction contractors and consultants towards the ranking of the impact of effective communication on organizational effectiveness.

vealed that the most significant impacts of an effective communication were common in organizational efficiency. Furthermore, the ranking of improve productivity of an organization and reduction of project delay as the topmost impacts indicates that construction organization were influenced by effective communication. This confirms the perceived low performance of construction organization. In view of the above, it was recommended that stakeholders in the construction organization should adopt the use of effective communication tools and instruments for organizational performance.

Table 6 - Impacts on organizational effectiveness

Construction organizations Contractors Consultants

Impacts S RII R S RII R

Impacts on organizational effectiveness

Improve workmanship 252 0.630 6 223 0.558 5

Better use of materials and equipment 255 0.638 4 225 0.563 3

Less supervision 250 0.625 7 223 0.558 5

Reduce rework from unsatisfactory work done 225 0.563 11 207 0.518 11

Reduce wastages of construction materials 220 0.550 13 195 0.488 13

High performance and innovation 215 0.538 14 190 0.475 14

Kendall's coefficient 0.993

Sig. 0.000

REFERENCES

1. Abu Bakar, A., Tabassi, A., Razak, A., & Yusof, M. (2012). Key Factors Contributing to Growth of

Construction Companies: A Malaysian Experience. World Applied Sciences Journal, 19(9), 12951304.

2. Aiyewalehinmi, E. O. (2013). Factors Analysis of Communication in the Construction Industry.

International Journal of Engineering and Science, 2(10), 49-57.

3. Chan, D., & Kumaraswamy, M. (2002). Compressing construction durations: lessons learned from

Hong Kong building projects. International Journal of Project Management, 20(1), 23-35. doi: 10.1016/s0263-7863(00)00032-6

4. Gaith, F. (2012). Application and efficacy of information technology in construction industry.

Scientific Research and Essays, 7(38). doi: 10.5897/sre11.955

5. Jimoh, R. (2012). Improving Site Management Practices in the Nigerian Construction Industry: The

Builders' Perspective. Ethiopian Journal of Environmental Studies and Management, 5(4). doi: 10.4314/ejesm.v5i4.5

6. Mitkus, S., & Mitkus, T. (2014). Causes of Conflicts in a Construction Industry: A Communicational

Approach. Procedia - Social and Behavioral Sciences, 110, 777-786. doi: 10.1016/j.sbspro.2013.12.922

7. Ochieng, E. G., & Price, A. D. F. (2010). Managing cross-cultural communication in multicultural

construction project teams: The case of Kenya and UK. International Journal of Project Management, 28(5), 449-460. doi: 10.1016/j.ijproman.2009.08.001

8. Olanrewaju, A., Tan, S. Y., & Kwan, L. F. (2017). Roles of Communication on Performance of the

Construction Sector. Procedia Engineering, 196, 763-770. doi: 10.1016/j.proeng.2017.08.005

9. Onyegiri, I., & Nwachukwu, C. (2011). Information and communication technology in the

construction industry. American Journal of Scientific and Industrial Research, 2(3), 461-468. doi: 10.5251/ajsir.2011.2.3.461.468

10. Oyedele, L. O., & Tham, K. W. (2007). Clients' assessment of architects' performance in building

delivery process: Evidence from Nigeria. Building and Environment, 42(5), 2090-2099. doi: 10.1016/j.buildenv.2005.06.030

11. Pallant, J. (2011). A Step by Step Guide to Data Analysis Using SPSS Programme: SPSS Survival

Manual (4th ed.). Sydney: Allen and Unwin.

12. Park, J.-G., & Lee, J. (2014). Knowledge sharing in information systems development projects:

Explicating the role of dependence and trust. International Journal of Project Management, 32(1), 153-165. doi: 10.1016/j.ijproman.2013.02.004

13. Rahman, A., Memon, A., & Latif, Q. (2012). Time and Cost Performance of Construction Projects in Southern and Central Regions of Peninsular Malaysia. Retrieved from https://core.ac.uk/download/pdf/12008294.pdf

14. Soliman, E. (2017). Communication Problems Causing Governmental Projects Delay: Kuwait Case

Study. International Journal of Construction Project Management, 9(1), 1-18.

15. Spillane, J., & Oyedele, L. O. (2013). Strategies for effective management of health and safety in

confined site construction. Construction Economics and Building, 13(4), 50-64. doi: 10.5130/ajceb.v13i4.3619

16. Tabachnick, B. G. & Fidell, L. S. (2013). Using Multivariate Statistics (6th ed.) Boston: Allyn & Bacon.

Zekavat, P. R., Moon, S., & Bernold, L. E. (2014). Performance of short and long range wireless communication technologies in construction. Automation in Construction, 47, 50-61. doi: 10.1016/j.autcon.2014.07.008

17. Zekavat, P. R., Moon, S., & Bernold, L. E. (2014). Performance of short and long range wireless

communication technologies in construction. Automation in Construction, 47, 50-61. doi: 10.1016/j.autcon.2014.07.008

18. Zulch, B. (2014). Communication: The Foundation of Project Management. Procedía Technology, 16,

1000-1009. doi: 10.1016/j.protcy.2014.10.054